Upper Paxton Township
Anti-Data Center Policies
Upper Paxton Township’s enacted ordinance limits noise and building height, requires sound testing and setbacks, and allows data centers with added compliance and review costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Upper Paxton TownshipThe Board of Supervisors adopted the ordinance, numbered 9-23-2026 and based on the Tri-County Regional Planning Commission model, at its September 23, 2026 meeting, according to minutes the board approved on October 13, 2026.Upper Paxton Township, Dauphin County — data-center ordinance (No. 9-23-2026)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements17
Section 27-1102.41A(1) caps a Data Center at 100,000 square feet of gross floor area in total or in the aggregate, but outdoor equipment such as generators, cooling equipment, and substations does not count toward the cap.
60 dBA day and night at residential property lines, § 27-1102.41H(1)(b)4)
70 dBC day and night at residential property lines, § 27-1102.41H(1)(b)4)
Noise impact study with the land development plan where required and optional post-occupancy study; no building permit study, § 27-1102.41H(1)(b)
Generators above the limits may not be tested from 8 p.m. to 7 a.m.; no hours cap, § 27-1102.41H(1)(b)5)
Public authority certification or water feasibility study for nonpublic sources; wells not barred, § 27-1102.41G
Projected water demands and uses disclosed, § 27-1102.41G(3)
Section 27-1102.41G(5) requires the applicant to show that disposal of domestic, cooling, and industrial wastewater has been provided for and approved by the Sewage Enforcement Officer, authority, or DEP, but the approval is not required before the zoning permit.
Utility capacity verification before the certificate of occupancy; not before approval and no third-party inspection, § 27-1102.41I(1)
Backup generators defined and limited to emergency use and testing, Section 3 and § 27-1102.41H(1)(b)5)
Substations counted as accessory uses and utility boxes screened, Section 3 and § 27-1102.41I
Utility equipment screened and equipment kept out of street yards; no 12-ft standard, § 27-1102.41F(4) and I
Emergency Response Plan reviewed by the emergency management coordinator and 24-hour contact signage; no annual updates or radio coverage, § 27-1102.41K(1) and (3)
Traffic study above 25,000 sq ft, § 27-1102.41D(1)
Second emergency access required; no arterial or collector rule, § 27-1102.41D(2)
Township may require one post-occupancy noise study within two years, § 27-1102.41H(1)(b)10)
Section 27-1102.41H(1)(b)10) lets the Township engage its own sound expert at the owner's expense for a post-occupancy noise study, but no applicant-paid consultant review of studies in land development review is stated.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the CM and I Districts
Sources
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- www.tcrpc-pa.org
- www.upperpaxtontwp.org
- www.upperpaxtontwp.org
- drive.google.com
- padatacenterordinances.org
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data