Upper Hanover Township
Anti-Data Center Policies
Upper Hanover Township allows data centers in the OS district only by conditional-use approval, with studies, operating rules, setbacks, and minimum site sizes that limit feasible projects and may add costs and delays.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Upper Hanover TownshipEstablishes data-center-specific zoning rules, allowing the use by conditional approval in the OS district and requiring standards for siting, noise, energy, water, safety, and public engagement.Ordinance No. 2026-04, Upper Hanover Township
What this means
The ordinance creates a path for data centers in the OS district, but approval is conditional-use only. Applicants also face substantial studies and rules for noise, energy, water, setbacks, and emergency planning, adding likely costs and delays; overall, the requirements outweigh the benefit of allowing the use in that district.
People behind it
- Upper Hanover Township Board of Supervisors
Enacted and unanimously adopted Ordinance No. 2026-04.
Restrictions & requirementsHide restrictions & requirements24
Data centers require conditional-use approval and are allowed as a conditional use only in the OS district; the ordinance says its requirements apply to all data centers. Only be permitted by conditional use
The ordinance recognizes major data centers of 100,000 to 500,000 square feet and edge data centers under 100,000 square feet; a major facility must have at least 20 acres, and an edge facility at least 10 acres. Major Data Center
Sites must have at least 250 feet of lot width, frontage on a minor or principal arterial, primary access from such a road, and secondary access suitable for emergency response. Frontage on at least one street
Connection to public water and public sewer is required. Connection to public water and public sewer is required
Structures, including rooftop appurtenances, may not exceed 60 feet; building coverage is capped at 40% and impervious surface at 60%. In no case shall exceed 60 ft
Principal buildings and accessory structures generally must be at least 100 feet from nonresidential-zoned property lines and 500 feet from sensitive receptors. The Board may reduce the sensitive-receptor setback to no less than 300 feet only if the applicant demonstrates specified environmental and other performance measures. Cooling, ventilation, heat, and power equipment must be 150 feet from nonresidential-zoned property lines and 500 feet from sensitive receptors. 500 feet from any sensitive receptors
Buildings and site design must meet detailed placement and architectural rules, including façade offsets and material limits, an articulated main entrance, and submission of elevations or renderings. Fences must be on the interior side of the buffer, use specified visually appealing materials, and may not have barbed or razor wire. horizontal offset of at least ten (10) feet
Parking must meet the Township’s industry-use requirements. Applicants may build less if a professional-engineer parking study supports the reduction, but unbuilt required spaces must be reserved and designed for, and the Township may later require their construction if parking proves insufficient. parking study prepared by a professional engineer
At least one loading space is required; loading areas cannot be placed between a building and a property line abutting a residential use or other sensitive receptor, or between a building and a street’s ultimate right-of-way. A minimum of one loading space is required
Applicants must submit a community impact analysis covering operations, traffic, stored materials, and potential effects on emergency services, sewage and solid-waste disposal, schools, and municipal finances. community impact analysis
Applicants must submit an environmental impact analysis addressing existing conditions, likely effects, public resources, potential nuisance, unavoidable impacts, protective measures, and environmentally sensitive areas. environmental impact analysis
Applicants must provide pre-construction and post-construction noise studies prepared by qualified professionals; the post-construction study is due 1–12 months after the first certificate of occupancy, subject to a possible Board extension for good cause. Noise at property lines is generally limited to 40 dB(A)/50 dB(C) at night and 45 dB(A)/60 dB(C) by day; where baseline noise is higher, operations may not exceed that baseline. Post-Construction Noise Study
Projects must meet the current LEED BD+C: Data Centers rating system or an equivalent approved by the Township Engineer, and submit a professionally prepared Energy Management Plan. For grid-connected projects with demand over 50 MW, at least 10% of power must come from regional renewable generation through a power-purchase agreement or similar mechanism, not renewable-energy credits alone. minimum of 10% of its power
An energy-generation system supplying a data center during normal operations is treated as a separate principal use and must obtain approval under applicable regulations. On-site substations have siting and screening rules; specified substations near nonindustrial district boundaries or sensitive receptors must be at least 800 feet from the property line. On-site power lines of 34.5 kV or less must be buried. separate principal use
Diesel backup generators must meet EPA Tier 4 standards and undergo annual testing with reports to the Township. Fossil-fuel emergency generation is limited to outages and short maintenance or readiness testing capped at 100 hours per year; routine testing is restricted to 10 a.m.–4 p.m. Monday through Friday. Peak shaving and supplying power to the grid are prohibited. capped at 100 hours per year
Groundwater and direct surface-water withdrawals may not be the primary cooling-water source. Facilities must use closed-loop cooling unless the Township Engineer is satisfied that an alternative uses less water and energy; applicants must show adequate supply, submit required water analyses or a feasibility study for nonpublic sources, obtain required state and regional permits before final approval, and provide a drought-response plan. No proposed Data Center shall use groundwater
Applicants must analyze wastewater needs and show that a municipal system can handle them, or provide a feasibility study for a private system. Untreated wastewater may not be discharged to stormwater systems or surface waters. Any untreated wastewater generated is prohibited
Applicants must submit an electronic-waste plan for safe removal, recycling, or disposal of servers, batteries, hazardous materials, and related products when equipment is updated or the facility is decommissioned. Electronic Waste Plan
A professionally prepared Thermal Impact Mitigation Plan is required, addressing waste heat, off-site impacts, mitigation, and feasible heat reuse; the Township may require monitoring or supplemental plans. Thermal Impact Mitigation Plan
All operations must provide buffer yards: at least 100 feet along public-street frontage and property lines adjoining residential zoning or sensitive receptors, and at least 50 feet beside nonresidential uses or districts. A professional landscape architect’s plan is required; improvements generally may not cross the buffer except driveways and essential utilities. minimum 100-foot-wide buffer yard
Cooling, ventilation, and operating equipment must be screened to reduce noise and visual impacts; ground-mounted equipment must be fully enclosed when technically feasible, otherwise screened by a visually solid barrier, and rooftop equipment must be screened on all four sides. fully enclosed when technically feasible
A qualified professional must prepare an Emergency Response Plan acceptable to the local fire department and emergency-management services, including fire, containment, ventilation, and evacuation procedures; first-responder training is at the applicant’s expense. The ordinance also requires 24-hour emergency-contact signage, adequate on-site responder radio coverage, and specified fire-safety compliance for battery or other energy storage. Emergency Response Plan
When a facility is no longer used as a data center, its owner must remove computer equipment and hazardous or extremely hazardous substances; the Board may set a removal deadline as a condition of approval. owner of the property shall be responsible
Before the first planning commission meeting discussing the proposal, the applicant must hold a publicly advertised meeting with a knowledgeable project representative. The applicant must also maintain a public project website beginning at least two weeks before that meeting and through final land-development approval. beginning at least two weeks prior
Benefits & exceptionsHide benefits & exceptions7
Data centers are allowed to apply for conditional-use approval in the OS district, rather than being barred there; approval remains subject to the ordinance’s requirements. Permitted by conditional use.
The Board may reduce the 500-foot setback from sensitive receptors to no less than 300 feet if the applicant demonstrates qualifying environmental performance, such as noise no greater than ambient levels, visual screening or aesthetic improvements, and no harmful thermal effects. May be reduced to no less than 300 feet.
An applicant may build less parking than the standard industry-use requirement if a professional-engineer parking study shows a lower amount meets operational needs. Unbuilt required spaces must be reserved, and the Township may later require their construction if needed. May reduce the parking that it constructs.
A data center may propose a cooling system other than closed-loop circulation if it demonstrates to the Township engineer’s satisfaction that the alternative uses less water and energy. May propose an alternative cooling system.
Backup energy generation is identified as an accessory use, but fossil-fuel emergency generation is limited to outages and maintenance or readiness testing capped at 100 hours per year; testing is restricted to weekdays from 10 a.m. to 4 p.m. Peak shaving and supplying power to the grid are prohibited. Back-Up Energy Generation.
An on-site electric substation serving the data center does not require a buffer or screening between the substation and the data center’s principal building. Do not require a buffer or screening.
If pre-construction measurements show ambient noise already exceeds the ordinance’s sound limits, the post-construction study must show that the facility does not materially increase the baseline; the sound-level rule also says levels at the property line may not exceed that baseline. Where baseline/ambient noise.
Sources
current law · Upper Hanover TownshipThe Board of Supervisors adopted the rules as Ordinance 2026-04 on June 9, 2026, and Hanover Development LP withdrew its data center conditional use application and validity challenge on October 14, 2026.Upper Hanover Township, Montgomery County — data-center ordinance (No. 2026-04)
What this means
The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements20
Conditional use; no approval expiration, § 500-843
Community impact analysis maps riparian buffers, wetlands, slopes, § 500-843(N)(7)
Section 500-843(O)(2)(a) sets 40 dBA at night and 45 dBA in the day at the property line, but Section 500-843(O)(1) says only that sound is measured at all property lines with full spectrum modeling and names no metric, meter class, or procedure.
Section 500-843(O)(2)(b) holds sound to the baseline ambient level where the pre-construction baseline exceeds the fixed limits, but the baseline is not defined as L90 and no measurement method is stated.
60 dBC day, 50 dBC night, § 500-843(O)
Pre-construction and post-occupancy studies, § 500-843(O)(1)
Closed-loop required; evaporative cooling not restricted, § 500-843(Q)(2)
Drought response plan required; no cap or reporting
Wastewater analysis; untreated discharge to surface waters barred
Tier 4 generators with annual testing reports
Thermal impact mitigation plan with waste heat reuse review.
E-waste plan for servers, hazardous materials, batteries; refrigerants not named
Energy management plan; rooftop solar only encouraged
Substations screened; lines 34.5 kV and below buried; placement not set
100 ft buffer yard next to residential zones and sensitive receptors.
Ground and rooftop equipment screened; no height or acoustic standard
Plan reviewed by fire department, radio coverage, 24-hour contact sign; no annual update
Removal required; Board may set timeline; no financial security, § 500-843(X)
One post-construction noise study; energy data on request
Public meeting before Planning Commission and project website
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the OS District