Upper Frankford Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Upper Frankford Township.
pending · Upper Frankford TownshipProposes data-center-specific rules in Upper Frankford Township covering site design, environmental impacts, utilities, traffic, noise, safety, permits, and decommissioning.N/A — no data center-specific law, ban, or regulation found for Upper Frankford Township
What this means
The proposed ordinance would add rules covering where data centers can be built and how they operate, including property size, water use, noise, permits, and security. That wide range of requirements could create significant hurdles, though the notice does not give exact limits or costs.
People behind it
- Board of Supervisors of Upper Frankford Township
Proposed the ordinance and will consider it for adoption.
Restrictions & requirementsHide restrictions & requirements12
The ordinance sets design, property-size, buffer, screening, and building-placement requirements for data centers. Design criteria, property size, buffers, screening, building placement
It regulates glare and light trespass. Glare and light trespass
It regulates substances and power consumption. Regulated substances, power consumption
It establishes requirements concerning trucks, safety, traffic, and construction. Trucks, safety, traffic and construction
It regulates water use and surface- and groundwater withdrawals. Water use and surface and groundwater withdrawals
It sets noise-control and vibration requirements and requires studies. Noise control, vibration and studies
It regulates wastewater management. Wastewater management
It includes farmland-preservation requirements. Farmland preservation
It sets decommissioning requirements. Decommissioning
It requires the posting of security. Posting of security
It establishes permit procedures and escrow fees. Permits and escrow fees
It provides for penalties and enforcement. Penalties and enforcement provisions
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data