Upper Frankford Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Upper Frankford Township.

pending · Upper Frankford Township
Proposes data-center-specific rules in Upper Frankford Township covering site design, environmental impacts, utilities, traffic, noise, safety, permits, and decommissioning.N/A — no data center-specific law, ban, or regulation found for Upper Frankford Township

What this means

The proposed ordinance would add rules covering where data centers can be built and how they operate, including property size, water use, noise, permits, and security. That wide range of requirements could create significant hurdles, though the notice does not give exact limits or costs.

People behind it

  • Proposed the ordinance and will consider it for adoption.

Restrictions & requirementsHide restrictions & requirements12
  • The ordinance sets design, property-size, buffer, screening, and building-placement requirements for data centers. Design criteria, property size, buffers, screening, building placement

  • It regulates glare and light trespass. Glare and light trespass

  • It regulates substances and power consumption. Regulated substances, power consumption

  • It establishes requirements concerning trucks, safety, traffic, and construction. Trucks, safety, traffic and construction

  • It regulates water use and surface- and groundwater withdrawals. Water use and surface and groundwater withdrawals

  • It sets noise-control and vibration requirements and requires studies. Noise control, vibration and studies

  • It regulates wastewater management. Wastewater management

  • It includes farmland-preservation requirements. Farmland preservation

  • It sets decommissioning requirements. Decommissioning

  • It requires the posting of security. Posting of security

  • It establishes permit procedures and escrow fees. Permits and escrow fees

  • It provides for penalties and enforcement. Penalties and enforcement provisions

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data