Upper Chichester Township

Anti-Data Center Policies

Upper Chichester Township allows data centers in two zoning districts only with conditional-use approval, a 20-acre minimum site, and a 250,000-square-foot building cap. Setbacks, studies, reporting, and cleanup security add hurdles; one description calls the enacted measure proposed.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Upper Chichester Township
Allows data centers only in specified industrial and commercial zones, subject to limits on size, location, water use, noise, environmental impacts, and ongoing compliance.Proposed amendment to Chapter 600 of the Upper Chichester Township Zoning Ordinance (data centers)

What this means

The measure would allow data centers in two zoning districts, but only through conditional-use approval and with significant limits, including a 20-acre minimum site and 250,000-square-foot building cap. Setbacks, extensive impact studies, ongoing reporting, and cleanup security would add substantial costs and hurdles to building, expanding, and operating them.

Restrictions & requirementsHide restrictions & requirements16
  • Data centers and accessory uses require conditional-use approval and are allowed only in the I-Industrial and TLC Township Line Commercial districts (conditional-use districts).

  • The site must be at least 20 acres, and each data-center building is limited to 250,000 square feet and 50 feet in height (building restrictions).

  • The facility must use a closed-loop or air-cooled water system, or a similar method that does not withdraw groundwater during normal operation (water-system requirement).

  • Data-center and accessory structures must be at least 500 feet from existing residential uses and the Township’s R-1, R-2, and R-3 districts; substations must also meet that 500-foot separation. Loading docks and truck maneuvering areas must be in a side or rear yard and at least 500 feet from those residential uses or districts (residential setbacks).

  • No data-center or accessory structure may be within 500 feet of a public or private school (school setback).

  • A data-center building must be at least 200 feet from another building on the same property and at least 1,000 feet from another data center in the Township (building separation).

  • Power-generation systems serving a data center during normal operations are treated as separate uses and require approval under the zoning rules applicable to those uses (separate-use approval).

  • Accessory bulk fuel storage must be located in the rear yard, and any gates, guard shacks, or checkpoints must have enough on-site queuing space to prevent vehicles from stacking on public streets (fuel storage and queuing).

  • Applicants must provide a riparian buffer at least 50 feet from either side of the top of bank of covered streams or water bodies, or from the boundary of the 100-year floodplain, and comply with the Township’s buffer rules (riparian buffer).

  • The ordinance imposes design and site standards, including facade-design elements; screening and noise mitigation for mechanical and electrical equipment; landscaping and screening; and, where feasible, a berm averaging at least 8 feet high next to residentially zoned or used parcels. Parking must meet the greater of twice the largest-shift employee count or one space per 1,000 square feet, and parking and loading areas are barred from required front and side yards (design and parking standards).

  • Exterior lighting must be full cut-off, fully shielded, and directed downward; property-line illumination is capped at 0.2 foot-candles next to residentially zoned or used property and 1.0 foot-candle elsewhere, with lighting reduced to minimum security levels outside normal operating hours (lighting limits).

  • A conditional-use applicant must submit an impact statement and supporting materials, including utility-service feasibility and approvals; air-quality information (with standby diesel generators at least EPA Tier 4); an emergency-response plan; wastewater and waste-disposal information; noise, odor, and vibration studies; a water-supply feasibility study when water resources are used; electric-service capacity documentation; a traffic impact study; and environmental-impact information (impact-statement requirements).

  • Noise compliance must be studied, including cumulative sound from equipment and routine generator testing; an as-built sound study is required six months after a building’s certificate of occupancy. Emergency-generator testing or recharge is prohibited at night and on holidays and allowed only on weekdays from 10 a.m. to 4 p.m. (noise and generator-testing rules).

  • The facility owner must submit a compliance report every three years after the certificate of occupancy, documenting continued compliance and identified deficiencies and mitigation (three-year reporting).

  • Expansion of an existing data center or accessory use—including changes to parking, loading, or exterior equipment—requires conditional-use approval (approval for modifications).

  • Before receiving a zoning permit, the owner must execute a decommissioning agreement and provide financial security equal to 110% of Township-approved decommissioning costs. After the facility ceases operating as a data center, decommissioning must be completed within 12 months (decommissioning and security).

Benefits & exceptionsHide benefits & exceptions2
  • Data centers and associated accessory uses are allowed to seek conditional-use approval in the I-Industrial and TLC-Township Line Commercial districts. Accessory uses may include utilities, substations, cooling equipment, and backup power, but must be secondary to the data center and on the same tract or adjacent parcels developed as a unified project; energy-generation systems require separate zoning approval. Conditional-use districts Accessory-use definition

  • The ordinance establishes a conditional-use approval route for expanding an existing data center or accessory use, including changes to parking, loading, or exterior equipment. The expansion must meet the standards in Section 600-199. Expansion approval requirement

Sources

current law · Upper Chichester Township
The current rules are in Ordinance 767, which the Board of Commissioners adopted on April 22, 2026.Upper Chichester Township, Delaware County — data-center ordinance (No. 767)

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements25
  • Conditional use; no 1-year expiration of approval, § 600-199

  • 50-ft height limit; no rooftop equipment limit, § 600-199.A.2.c

  • 50-ft riparian buffer and environmental impact statement, § 600-199.A.8 and A.10

  • Section 600-199.A.12 requires conditional use approval for expansion of a data center or accessory use, including changes to parking, loading, and exterior equipment, but it does not list added building area, generator, cooling, battery, substation, or electrical demand triggers and does not exempt like-for-like replacement.

  • Must meet § 600-201.E: 60 dBA day, 50 dBA night at residential uses, § 600-199.A.10.f

  • § 600-201.E caps impulsive sound at 20 dBA over ambient, applied through § 600-199.A.10.f

  • Compliance study with application and as-built study 6 months after occupancy; none at building permit, § 600-199.A.10.f

  • Vibration study showing none past the property line, § 600-199.A.10.h.

  • Water supply feasibility study with well inventory and geologic map; no cooling-well bar, § 600-199.A.10.i

  • Closed-loop or air-cooled system required; evaporative cooling not expressly restricted, § 600-199.A.1

  • Feasibility study for the proposed use; no cap, reporting, or drought plan, § 600-199.A.10.i

  • Cooling wastewater disposal approved by the SEO or DEP in the impact statement, § 600-199.A.10.e

  • EPA Tier 4 generators; no annual emissions testing or reports, § 600-199.A.10.b

  • Waste must comply with RCRA and TSCA, § 600-199.A.10.e

  • Utility confirmation of service and capacity; no electrical inspection, § 600-199.A.10.a.

  • Energy efficiency plan; renewables only where feasible, § 600-199.A.10.j

  • Battery storage covered in emergency response plan; no NFPA 855, § 600-199.A.10.c

  • 8-ft berm next to residential land; no buffer width, § 600-199.A.9.c

  • Equipment screened with noise mitigation; no height or all-sides rule, § 600-199.A.9.b

  • Building elevations required, § 600-199.A.9.a

  • Plan approved by the Fire Marshal; no annual update or radio coverage, § 600-199.A.10.c

  • Bulk fuel storage in rear yard only; no setback or containment, § 600-199.A.6

  • Section 600-199.A.10.k requires a traffic impact study in every case covering daily operational traffic and emergency response access, but it does not cover construction traffic or set a study area reaching the nearest arterial or interchange.

  • 110% security with 12-month removal; no closure notice or 6-month removal, § 600-199.A.13

  • Compliance report on performance standards every 3 years, § 600-199.A.11

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-Industrial and TLC districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data