Upper Bern Township
Neutral Data Center Policies
Upper Bern Township’s enacted data-center ordinance imposes cooling and water-use rules, setbacks, and minimum site-size requirements, increasing development and review costs, though data centers may still be approved. Another description concerns a laundromat request, not data-center rules.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Upper Bern TownshipConsiders a conditional-use application for a laundromat; it does not establish data-center-specific rules.Ordinance No. 173 — Upper Bern Township Data Center Uses zoning amendment
What this means
The available information concerns a conditional-use request to operate a laundromat at one property, not rules for data centers (“operation of a laundromat”). It gives no indication of meaningful benefits or added burdens for building or operating data centers.
People behind it
- Abrams Patel 2, LLC
Applicant seeking conditional use approval to operate a laundromat as an additional principal use on the property. seeking ... conditional use approval
Sources
current law · Upper Bern TownshipThe current rules are in Ordinance 173-2026, which the Supervisors adopted 3-0 on September 10, 2026, together with a companion solar ordinance, Ordinance 174-2026.Upper Bern Township, Berks County — data-center ordinance (No. 173-2026)
What this means
The measure imposes cooling and water-use rules, setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements25
50-ft height including roof equipment, § 832.3(A)(4)
Environmental impact study required, § 832.4(A)(13)
60 dBA day, 55 dBA night and weekend, 45 dBA at residential or sensitive receptor lines, § 832.4(A)(3)(i)
Section 832.4(A)(3)(ii) requires preliminary, interim, and as-built sound studies, with the as-built study six months after the temporary certificate of occupancy, but the as-built study is not required at full operating load.
Vibration study showing none perceptible at the property line, § 832.4(A)(3)(iii).
Water feasibility study for non-public sources; no bar on wells for cooling, § 832.4(A)(4)(ii)
Closed-loop cooling required and evaporative towers prohibited absent an exemption, § 832.4(A)(5).
Water usage assessment of projected daily use, § 832.4(A)(4)(iii)
Section 832.4(A)(4)(v) requires the applicant to demonstrate that adequate means of disposal for domestic wastewater and wastewater used for cooling or industrial purposes have been provided for or approved by the sewage enforcement authority and/or DEP, with a non-sewer wastewater management plan if approval cannot be obtained.
Emission sources identified in impact study only; no generator standard, § 832.4(A)(13)
Thermal impact mitigation plan with waste heat reuse required only for high impact data centers, § 832.4(A)(10)(ii)
Electronic waste plan for servers, batteries, and hazardous materials; refrigerants not named, § 832.4(A)(14)(i)
Utility certification of capacity; no electrical inspection, § 832.4(A)(6)(i).
Energy management plan for high impact data centers; renewables encouraged only, § 832.4(A)(6)(iii) and (iv)
On-site generation treated as a separate use with its own approval, § 832.4(A)(6)(iv).
Ground power equipment screened and utility connections buried, § 832.4(A)(1)(ii) and (6)(v)
Section 832.4(A)(6)(i) and (ii) require a provider capacity letter and an Electrical Impact Assessment identifying detrimental effects on rates and supply, and make the applicant provide at its own expense the system improvements needed, but the estimated cost, the tariff terms, and an executed service agreement before a zoning permit are not required.
Section 915 buffer yards and 5-ft berms near parking and loading areas, § 832.4(A)(2)
Facade standards for height changes, recesses, fenestration, and materials, § 832.4(A)(12)(i).
Ground-mounted equipment screened under Section 915, § 832.4(A)(1)(ii)
Emergency response plan approved by the fire department and emergency agency; no annual updates or radio coverage, § 832.4(A)(7)(i)
Annual fire safety inspections by a qualified professional, § 832.4(A)(7)(i)(e)
Decommissioning plan and 110 percent security; no closure notice or removal deadline, § 832.4(A)(14)(ii) and (iii)
One as-built sound study six months after occupancy, § 832.4(A)(3)(ii)(c)
Final certificate of occupancy may be denied for noise violations, § 832.4(A)(3)(ii)(c)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the GI and AI industrial districts