Unity Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Unity Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Unity Township
Proposes to restrict data centers to special-exception approval in Unity Township’s Industrial Airpark and M-1 districts and require safeguards for siting, noise, power, water, environmental impacts, emergency response, and decommissioning.Proposed Unity Township Data Center Ordinance (draft)

What this means

The draft would allow data centers only by special exception in two industrial districts, while requiring major setbacks, including 1,500 feet from sensitive uses. It also demands extensive studies, strict noise limits, and substantial decommissioning security, making projects much harder and costlier, though not banning them outright.

People behind it

  • The draft attributes its findings to the Board and identifies the ordinance as a Township measure; it does not identify an individual sponsor.

Restrictions & requirementsHide restrictions & requirements18
  • Data centers are allowed only by special exception in the Industrial Airpark and M-1 districts, and must meet the ordinance’s specific criteria and the most restrictive applicable Township rules. Special Exception Use in the Industrial Airpark

  • Applicants must submit the required studies, plans, and other materials with their application. An incomplete application does not start the official-action deadlines; the Township may also require the applicant to fund consultant review. application to be declared “incomplete”

  • Most data-center structures and facilities must be at least 500 feet from outer site boundaries and 1,500 feet from sensitive uses or the boundaries of residential, business, or agricultural districts. Energy-system exhaust points must be at least 1,000 feet from adjacent property boundaries and 2,000 feet from sensitive uses or residential, commercial, or agricultural districts. The Zoning Board may require greater noise-related setbacks; the general setback may be reduced by up to 50% with the adjoining owner’s written waiver and noise-compliant buffering. Power lines, certain pipelines, and road or rail access are excepted from the general structure setbacks. at least 500 feet

  • A data center with more than 100,000 square feet of gross floor area must be on a site of at least 5 acres. over 100,000 square feet

  • Noise at any external perimeter property line must not exceed 40 dBA or 60 dBC at night (10 p.m.–7 a.m.), or 45 dBA or 65 dBC at other times. Applicants must provide noise assessments and an acoustical study; operating facilities must install continuous monitoring capable of retaining readings for at least 30 days. Exceedances require corrective action, and after notice and an opportunity to cure, the Township may suspend or revoke permits. 40 dBA or 60 dBC

  • Operations may not cause vibration, oscillation, or infrasound that produces perceptible building resonance or adverse human effects. A vibration study is required if mechanical equipment or cooling infrastructure is within 2,000 feet of a sensitive use. Vibration Study

  • Applicants must submit an environmental and community impact assessment, including analysis of air-pollution sources and critical impact areas, and a traffic impact study covering nearby roads and intersections during construction and operation. environmental and community impact assessment

  • Equipment must be housed in metered, grounded, pre-engineered metal enclosures rated to resist an internal electrical fire for at least 30 minutes, with fire baffles that close automatically. Battery or other energy storage proposals must demonstrate compliance with NFPA Standard 855 or similar standards and include storage-specific fire suppression. resist an internal electrical fire for at least 30 minutes

  • An emergency response plan must be submitted and reviewed by local fire and emergency-management officials. No certificate of occupancy may issue until required fire, containment, ventilation, and evacuation procedures receive written approval; officials may refuse approval if equipment to fight a data-center fire is unavailable. Applicants must also fund specialized first-responder training. No Data Center shall be issued a Certificate of Occupancy

  • Applicants proposing grid connection must provide an interconnection agreement and utility certifications on capacity, infrastructure, and power quality. The applicant or developer must pay the full cost of upgrades needed because of the project, and the utility must acknowledge that the project will not cause a rate increase in the service area. A grid-connected project estimating demand above 50 MW must procure at least 10% of its power from renewable sources. over 50 megawatts (MW)

  • On-site generation must meet environmental, safety, and utility-interconnection standards and use Tier 4 or greater generators. Solar panels, if used, are limited to building roofs; roofs must be solar-ready, and a solar energy plan and installation timeline are required, with installation completed before the certificate of occupancy. Tier 4 or greater generators

  • Data-center substations require year-round landscaping and an eight-foot screen wall, two emergency-access points, and placement outside the front yard and adjacent to the principal building. New or enhanced electric lines must be underground if technically possible, and on-site lines of 34.5 kV or below must be buried. minimum of eight (8) feet in height

  • The ordinance requires closed-loop cooling unless an alternative is shown to use less water and energy. Private wells or direct surface-water withdrawals may not be the primary cooling source when public water is available; applicants using nonpublic water must provide a feasibility study and document efforts to use existing water lines. Withdrawals are barred where they would negatively affect surrounding supplies or dewater neighboring properties. if a public water source is available

  • Projects using water in the Ohio River Basin must provide proof of Ohio River Basin Commission review and approval at the stated thresholds: withdrawals of at least 100,000 gallons per day over a 30-day average, or consumptive use of at least 20,000 gallons per day over a 30-day average. Applicants must also document adequate wastewater disposal and compliance with water-quality and drought-rationing requirements. one hundred thousand (100,000 gpd) gallons per day

  • Sites abutting sensitive receptors or Township roads must have an enhanced berm buffer. Where a data-center use abuts specified agricultural or residential districts, it must provide and maintain a 20-foot buffer strip with a qualifying fence, wall, or evergreen screen. at least twenty (20’) feet wide

  • The site must provide at least one parking space per employee, plus either three visitor spaces or one space per 300 square feet of gross floor area, whichever is greater, and at least one loading bay. A minimum of 1 parking space per employee

  • Applicants must submit a certified decommissioning plan and provide financial security equal to 110% of decommissioning costs before final land-development approval and building permits. Cost estimates and security must be updated every five years. A facility not operated for 12 continuous months is presumed abandoned, after which the owner has six months to remove it and restore the land. one hundred ten (110%) percent

  • Applicants must pay the fees, inspection and consultant costs, review costs, and financial-security deposits associated with the proposed data-center use before any approval is granted. All fees shall be paid prior to any approval

Benefits & exceptionsHide benefits & exceptions8
  • Data centers are allowed to apply for a special exception in the Industrial Airpark and M-1 districts, subject to the ordinance’s requirements: “authorized by Special Exception Use”.

  • On-site power generation using natural gas, renewable fuels, or other clean sources is authorized to improve reliability, efficiency, or sustainability, provided it meets the stated environmental, safety, utility-interconnection, generator, and noise requirements: “On-site power generation … is authorized”.

  • The 500-foot perimeter setback does not apply to transmission and distribution powerlines, electricity or natural-gas pipelines serving the property, or road and rail access: “Except for transmission and distribution powerlines”.

  • A required setback may be reduced by up to 50% if the adjoining owner waives it in writing and buffering, fencing, or landscaping is used to keep noise within limits at that boundary: “may be reduced up to 50%”.

  • An on-site electric substation does not need a buffer or screening between itself and the data center’s principal building: “do not require a buffer or screening”.

  • Noise limits do not apply to emergency alerts, qualifying emergency work on public utilities, snow removal, or road repair; the exception does not cover routine operation or testing of emergency power equipment: “maximum sound levels identified herein do not apply”.

  • Before suspending or revoking a special-exception or occupancy permit for a noise exceedance, the Township must give the operator reasonable notice and an opportunity to cure: “reasonable notice and an opportunity to cure”.

  • An applicant may immediately appeal to the Westmoreland County Court of Common Pleas a Township determination that its decommissioning-cost estimate is insufficient, while its special-exception application is pending: “may file an immediate appeal”.

Sources

pending · Unity Township
The township provided its current working draft in response to a Right-to-Know request on October 27, 2026, and the Board of Supervisors will hold a public hearing on November 10, 2026 at 6:00 p.m., at which the public notice says no official action will be taken.Unity Township, Westmoreland County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements25
  • Section 5.A.2.f requires all principal, accessory, and energy system structures or facilities to be 1,500 ft from sensitive uses and residential districts, but item 5 lets the distance be cut by up to 50 percent, to 750 ft, with the adjoining owner's written waiver.

  • Environmental impact analysis of critical areas; riparian buffers per Chapter 99, Sections 5.I and 5.L

  • Section 5.B.1 sets 40 dBA at night and 45 dBA at other times at the perimeter property line, and Section 5.B.9 requires a licensed acoustical engineer to record date, time, and duration at the most exposed perimeter points, but no meter class or ANSI measurement standard is named.

  • Baseline noise assessment only; no background cap, Section 5.B.5

  • 65 dBC day and 60 dBC night, Section 5.B.1

  • Studies with application and continuous monitoring after opening; none at building permit, Sections 5.B.5 to 5.B.11

  • Noise limits apply to generator testing; no hours limit, Section 5.B.4

  • Closed-loop cooling required; evaporative cooling not restricted, Sections 5.G.3 and 5.H.1

  • Projected water needs disclosed and drought plan compliance; no cap or reporting, Sections 5.G.1 and 5.H.4

  • Cooling and industrial wastewater disposal approved by the sewage officer, authority, or DEP with the application, Section 5.H.2

  • Tier 4 generators for on-site power generation; no annual emissions testing, Section 5.F.1.b

  • Decommissioning plan covers e-waste, batteries, and refrigerants; no recycling requirement, Section 5.M.2

  • Utility capacity certification with application and third-party electrical inspection before occupancy, Sections 5.E.3.b and 5.E.3.h

  • Section 5.E.3 requires an interconnection agreement with the electric service provider submitted with the application and makes the applicant pay for any needed infrastructure upgrades, but it does not require the upgrades or their estimated cost to be disclosed.

  • 20 ft buffer strip next to A and R districts and berm next to sensitive receptors, Section 5.K

  • Impact statement must show glare will not be perceptible at or beyond the property line; no shielding standard, Section 5.C.3

  • Substations screened by 8 ft wall; no all-equipment standard, Section 5.F (Power Lines)

  • Hazardous materials identified; no storage setbacks or containment, Sections 5.I.2.e and 5.M.2.b

  • Third-party electrical inspection before occupancy; no annual inspections, Section 5.E.3.h

  • Section 5.J requires a traffic impact study in every case covering construction and operation for roadways, intersections, bridges, and interchanges within one-half mile of the site.

  • Section 5.M requires 110 percent security, notice at cessation, and removal within six months, but the agreement is not recorded and there is no two-year reuse rule for buildings.

  • Section 5.M.3 requires decommissioning estimates after the first year of operation and every fifth year, and states that the financial security shall be updated every five years.

  • Continuous noise monitoring available on request; no regular reports, Section 5.B.11

  • Section 5.B.13 allows suspension or revocation of the special exception or occupancy permit after reasonable notice and an opportunity to cure, but no hearing is required and Sections 616.1 and 617.2 of the MPC are not cited.

  • Section 4.D lets the Township retain consultants at the applicant's expense to review the studies before the Zoning Hearing Board hearing on the special exception.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Special exception in the IAP and M-1 districts (proposed)

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data