Loading map…

Ulysses Township

Anti-Data Center Policies

Ulysses Township’s enacted ordinance requires setbacks, minimum site sizes, and noise limits and testing; approval remains possible, but these restrictions narrow where and how data centers can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Ulysses Township
The township secretary said the ordinance was passed at the township's June 2026 meeting, but the copy provided has a blank ordinance number and adoption date, and the exact adoption date has not been confirmed.Ulysses Township, Potter County — data-center ordinance (Number Not Confirmed)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements25
  • 500 ft from any residence as a Noise-Sensitive Receptor, Section 7.B and Section 4

  • 50 ft maximum unless greater height approved; no rooftop equipment limit, Section 7.C

  • Environmental Impact Statement only if required by the Township; no riparian buffer, Section 6

  • Single limits of 55 dBA at property lines and 45 dBA at receptors; no separate night limit, Section 8

  • Noise Impact Study by an acoustical engineer with the application; later monitoring only if required, Sections 6 and 8

  • Generator testing 9:00 a.m. to 5:00 p.m. weekdays; no hours cap, Section 8

  • Applicant must demonstrate sustainable water supply with no adverse impact on neighboring wells; no pump test, Section 11.B

  • Cooling method not required to be disclosed or restricted, Section 11.B

  • Utility Demand Statement detailing water usage; no cap, reporting, or drought plan, Section 6

  • Wastewater discharge disclosed and must comply with DEP and Township regulations, Sections 6 and 11.C

  • Stormwater Management Plan compliant with Township and County requirements, Section 6

  • Utility documentation confirming capacity availability; no third-party electrical inspection, Section 11.A.

  • Utility Demand Statement detailing electrical load; no on-site renewable requirement, Section 6

  • Fire suppression systems must comply with NFPA standards; NFPA 855 not named, Section 12

  • 50-ft vegetative buffer along all property boundaries, Section 7.D

  • Mechanical equipment screened from public view; no height or acoustic standard, Section 7.D

  • Site plan only; no elevations or visual study, Section 6

  • Emergency Response Plan coordinated with fire and EMS and filed with the Township; no annual updates, radio coverage, or posted contacts, Sections 6 and 12

  • Operator must coordinate with fire and EMS providers; no training requirement, Section 12

  • Section 6 lists a Traffic Impact Assessment among the required application materials but states no scope, so construction traffic and the study area are not addressed.

  • Access roads must accommodate emergency vehicles; no road class or secondary access, Section 10

  • Road maintenance agreements or bonding may be required but are not set, Section 10

  • Removal within 180 days after 12 months of inactivity; bond or security only may be required, Section 13

  • Noise monitoring only if required by the Township, Section 8

  • Section 14 provides civil penalties of up to $500 per day and enforcement actions including revocation of permits, but states no revocation grounds and no notice or hearing.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use under a stand-alone data center ordinance; no township zoning

Sources

pending · Ulysses Township
Schedules a vote on a proposed data center ordinance, but the announcement does not say what the ordinance would require or prohibit.No data-center-specific law or ban identified for Ulysses, Pennsylvania

People behind it

  • Announced the proposed Data Center ordinance, its upcoming vote, and public review availability.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data