Loading map…

Tyrone Township

Anti-Data Center Policies

Tyrone Township allows data centers with conditional-use approval, but requires substantial setbacks, building-size limits, and utility and water-supply documentation. These conditions may make some sites impractical and add significant cost and delay.

current law · Tyrone Township
Tyrone Township adopted Ordinance No. 2025-03 to amend its zoning ordinance and regulate data centers as conditional uses.Tyrone Township Data Center Zoning Ordinance (2025)

What this means

The measure would allow data centers but require conditional-use approval and impose substantial site and application requirements, including 250-foot setbacks, increased to 500 feet in some cases, utility-service approval, and a water-supply feasibility report. These conditions could rule out some sites and add meaningful cost and delay, creating significant barriers rather than an outright ban.

People behind it

  • Enacted and adopted Ordinance No. 2025-03 amending the township's zoning and land-use regulations.

  • Moved to adopt Ordinance No. 2025-03 as a member of the Tyrone Township Board of Supervisors.

  • Participated in adopting Ordinance No. 2025-03 as a member of the Tyrone Township Board of Supervisors.

Show 2 more peopleShow fewer people
  • Identified as the Tyrone Township Board of Supervisors chairman in the ordinance's enactment and attestation section.

  • Identified as the official responsible for attesting the ordinance.

Restrictions & requirementsHide restrictions & requirements20
  • Data centers are allowed only through conditional-use approval, requiring an application with a written narrative, professionally prepared site and landscaping plans, a noise and vibration assessment by a qualified acoustical engineer, and documentation of compliance with applicable laws.

  • Large data centers exceeding 25,000 square feet require at least 10 acres; small data centers of 25,000 square feet or less require at least 5 acres.

  • Data centers must maintain at least 30% vegetative coverage.

  • Maximum floor-area ratio is 0.25 for large data centers and 0.3 for small data centers.

  • A 250-foot setback is required from all lot lines or applicable ultimate rights-of-way. The setback increases to 500 feet next to specified sensitive uses, dwellings, historic buildings, day-care centers, recreation facilities, nursing homes, or residential zoning districts.

  • The required setback generally cannot contain improvements, including parking, loading areas, utilities, or stormwater facilities, except for access, utility, or stormwater facilities that are necessary and cross the setback perpendicularly.

  • Noise from a data center may not exceed 60 dBA at the lot line or exceed the measured ambient noise level there by more than 10 dBA.

  • Outdoor lighting must use fully shielded, nonadjustable fixtures; lighting must be directed downward or shielded from neighboring properties and the sky; illumination at residential uses may not exceed 0.1 footcandle; and pole-mounted lights may not exceed 25 feet.

  • Vehicle parking, storage, and loading associated with a data center must remain on the subject property; satellite parking, storage, and loading lots are prohibited.

  • Woodland disturbance must be minimized, and no more than 50% of existing qualifying tree masses, tree lines, hedgerows, or individual trees may be removed.

  • Applicants must submit a Pennsylvania Natural Heritage Program study or PNDI receipt dated within two years of the application and comply with any agency measures addressing endangered, threatened, or special-concern species and habitats.

  • Data center building facades facing public roads must avoid undifferentiated surfaces by incorporating at least two specified design elements, such as changes in height, step-backs, fenestration, material changes, texture, color, or accent materials.

  • Ground-level and rooftop mechanical equipment must be screened from adjacent roads and properties using buildings, existing vegetation, or visually solid compatible fencing, walls, panels, or parapets.

  • Data centers must provide visual buffering next to residentially zoned or planned properties, generally using required plantings on a berm at least six feet high, subject to limited alternatives involving natural topography, preserved vegetation, supplemental vegetation, or a six-foot solid fence.

  • Chain-link or barbed-wire fencing is prohibited along public or private street frontages, although the Township may allow alternative compliance when visibility is reduced through landscaping or other methods.

  • Substations must be screened from adjacent major roads or residentially zoned or planned properties with 10-foot-tall opaque fencing facing residentially zoned properties.

  • Tanks storing flammable or otherwise hazardous materials may not be located within 50 feet of a property line or within 100 feet of any property.

  • Data center waste collection or storage areas must be at least 50 feet from the nearest building and enclosed by a solid masonry screen wall.

  • Applicants must provide written approval for service from all public utilities serving the data center, such as gas and electric utilities.

  • Applicants must submit a water-supply feasibility report demonstrating that sufficient water resources are available to serve the data center.

Benefits & exceptionsHide benefits & exceptions4
  • Data centers are expressly authorized as conditional uses in the HC and I zoning districts, creating a defined land-use approval pathway rather than leaving the use unaddressed. Add New Section 12-902.G. Data Center

  • The ordinance creates separate small and large data-center categories, with specified minimum lot sizes, vegetative coverage, and floor-area ratios. Small centers require at least 5 acres and may use a 0.30 FAR; large centers require at least 10 acres and may use a 0.25 FAR, with 30% vegetative coverage required. specific Area and Bulk requirements

  • The data-center application requirements do not include a traffic-impact study, truck-routing plan, or truck-turning analysis, even though those studies are expressly required for warehouse and truck-terminal applications. This provides a more limited permitting checklist for data centers. An application for a Data Center shall include

  • Data centers are permitted to include substations, subject to screening from adjacent major roads and residentially zoned or planned properties; residential-facing substations require 10-foot opaque fencing. Substations shall be screened

Sources

current law · Tyrone Township
Requires data centers to obtain conditional-use approval and meet standards for setbacks, noise, lighting, landscaping, utility service, water supply, and minimum lot size.N/A — no data-center-specific law or ban identified in Tyrone, Pennsylvania

What this means

The measure would allow data centers as conditional uses, but adds substantial siting and operating conditions: a 250-foot setback, increased to 500 feet in specified cases, along with limits on building size and required water-supply and utility documentation. These requirements could make some sites impractical and add significant planning costs and delays.

People behind it

  • The ordinance identifies the Board as the body adopting and enacting the measure.

  • Moved to adopt Ordinance 2025-03.

  • Seconded the motion to adopt Ordinance 2025-03.

Restrictions & requirementsHide restrictions & requirements11
  • Data centers are conditional uses under the ordinance’s added rules for the HC and I districts. Applications must include a written description of the use, applicable laws and likely environmental impacts and mitigation, contact details for owners, operators, managers and a 24/7 complaint contact, plus a signed truthfulness statement. A professionally prepared and sealed site plan and landscaping plan are also required. An application for a Data Center shall include

  • Applicants must submit a noise and vibration assessment prepared and sealed by a professional acoustical engineer. Noise at the lot line may not exceed 60 dBA or the ambient level by more than 10 dBA, whichever limit is lower. noise and vibration assessment study

  • Outdoor lighting must use fully shielded, nonadjustable fixtures; light reaching residential property is limited to 0.1 footcandle, and pole-mounted lights may not exceed 25 feet. fully shielded fixtures

  • A 250-foot setback is required along lot lines or applicable ultimate right-of-way lines. It increases to 500 feet next to specified sensitive or residential properties. The setback generally cannot contain improvements, with limited exceptions for necessary access, roads, utilities and stormwater facilities crossing it perpendicularly. A 250-foot setback shall be provided

  • Parking, storage and loading of vehicles associated with a data center must remain on the property; satellite lots are prohibited. confined to the subject property

  • Woodland disturbance must be minimized; tree removal must be clearly necessary, and no more than 50% of an existing tree mass, tree line, hedgerow or qualifying group of trees may be removed. No portions of tree masses

  • Applicants must submit a Pennsylvania Natural Heritage Program study (PNDI Receipt) dated within two years of the relevant application and comply with required state-agency measures to avoid, minimize or mitigate impacts to protected species and habitats. PNDI Receipt

  • Data centers must meet design and screening rules, including differentiated design on facades facing public roads; screening of ground-level and rooftop mechanical equipment; and a buffer yard for adjacent residentially zoned or planned properties. A qualifying berm must be at least six feet high unless the Township accepts equivalent screening alternatives. Street-facing fences cannot be chain-link or barbed wire, subject to possible Township-approved alternative compliance. Substations facing residentially zoned properties require 10-foot opaque fencing. A Data Center shall also meet the following design guidelines

  • Tanks storing flammable or otherwise hazardous materials must be at least 50 feet from property lines and at least 100 feet from a property. Waste collection or storage areas must be at least 50 feet from the nearest building and enclosed by a solid masonry screen wall. Hazardous materials

  • Applicants must provide written documentation that serving public utilities have approved an application for service and submit a water-supply feasibility report demonstrating sufficient water resources. A water supply feasibility report

  • The minimum lot area is 10 acres for a large data center and 5 acres for a small one; at least 30% vegetative coverage is required. Maximum floor-area ratio is 0.25 for large centers and 0.3 for small centers. The ordinance defines large as over 25,000 square feet of gross floor area per lot and small as no more than 25,000 square feet. The minimum lot area is as follows

Benefits & exceptionsHide benefits & exceptions5
  • Data centers are added as conditional uses in the HC and I districts, so a project may seek approval in either district; this is not approval by right and remains subject to the ordinance’s application requirements and operating standards. Data Center as a conditional use in the HC District Data Center as a conditional use in the I District

  • The ordinance sets development thresholds for both small and large data centers: a small center requires at least 5 acres and has a maximum FAR of 0.3; a large center requires at least 10 acres and has a maximum FAR of 0.25. Both must provide at least 30% vegetative coverage. Minimum lot area and FAR standards

  • For data-center buffers next to properties not planned or developed for commercial or industrial use, the ordinance allows equivalent visual screening to substitute for the specified berm-and-planting approach. The Township must find the alternative provides equivalent screening; options include natural topography and retained vegetation, with supplemental planting if needed, or vegetation outside a six-foot solid fence. Alternative visual screening

  • The 250-foot data-center setback, increased to 500 feet next to specified sensitive or residential properties, may be crossed by necessary access, road, utility, or stormwater facilities when there is no siting alternative. Such facilities may cross only perpendicularly. Setback exceptions for necessary facilities

  • The ordinance permits the Township to approve alternative compliance with the data-center street-frontage fencing rules if the applicant demonstrates reduced visibility through landscaping or other methods. Chain-link and barbed-wire fencing otherwise remain prohibited along public or private street frontages. Alternative fencing compliance

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data