Borough of Twilight
Anti-Data Center Policies
Twilight borough’s enacted ordinance requires setbacks, minimum site sizes, and noise limits and testing, sharply restricting where data centers can be built and how they can be designed.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Twilight BoroughThe standards are in Ordinance No. 08012026, which Borough Council enacted and the mayor approved on August 11, 2026, alongside Noise and Dust Ordinance No. 08032026 and Fossil Fuel Electric Generating Facilities Ordinance No. 08022026.Twilight Borough, Washington County — data-center ordinance (No. 08012026)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements33
Conditional use before Borough Council; no one-year expiration of approval, § 1071.2(1)
Sensitive receptors defined but no setback from schools, day care, hospitals, or parks, § 1009
Environmental Impact Assessment required before construction, § 1071.2(36)
55 dBA day and 45 dBA night at the property line, Noise and Dust Ordinance § 6(A)-(B), applied by § 1071.2(25)
Section 6(C) of the Noise and Dust Ordinance bars noise more than 10 dBA above ambient at residential property lines, and Section 6(H) sets ambient by a 72-hour baseline or a 55 dBA default, but ambient is not defined as L90 and no floor applies.
Octave band limits of 65 dB at 31.5 Hz and 60 dB at 63 Hz with one-third octave analysis; no dBC limit, Noise and Dust Ordinance § 6(E)
Noise study with the application and post-construction study before occupancy; none at building permit, § 1071.1(1)(c), § 1071.2(24)
Backup generators run only 8 a.m. to 8 p.m. weekdays, with a 120-hour annual maintenance cap per generator, § 1071.2(9), (39)
Vibration capped at the ISO residential day curve with a vibration study; not a no-perceptible standard, § 1071.2(37).
Analysis of water needs and provider capacity letter; no well or pump test rules, § 1071.2(10)
Closed-loop systems named as a conservation measure; not required and evaporative cooling not restricted, § 1071.2(34)
Anticipated water needs disclosed; no cap, reporting, or drought plan, § 1071.2(10)
Section 1071.2(11) requires a showing that disposal of domestic and cooling wastewater has been provided and approved by DEP, with a list of chemicals, but does not state when the approval must be in hand.
Tier 4 generators required; no annual emissions testing or reports, § 1071.2(33)
Decommissioned hardware recycled through certified e-waste recyclers; batteries and refrigerants not named, § 1071.2(48)-(49)
Utility letter certifying grid capacity and executed utility agreement; no electrical inspection, § 1071.2(6).
Applicant must show how electrical needs are met, with annual efficiency reports; no on-site renewables, § 1071.1(1)(b), § 1071.2(33)
Section 1071.2(7) and (9) make generation serving the data center a separate use approved under the Fossil Fuel Electric Generating Facilities Ordinance, which requires its own conditional use approval, a 500 ft property line setback and a 1,500 ft dwelling setback, compliance with the Noise and Dust Ordinance (Section 1090.7), and state and federal emission standards.
Utility letter must state the potential impact on the grid; costs not assigned, § 1071.2(6)
100-ft landscape buffer next to residential, commercial, and agricultural districts, § 1071.2(28).
Fenestration with breaks every 35 lineal feet, earth-tone materials, and roofline variation, § 1071.2(15), (23)
Rooftop and ground equipment fully screened and placed to shield noise; no 12-ft standard, § 1071.2(24), (26).
Pre-construction emergency response meeting and posted emergency contacts; no fire company plan review, annual update, or radio coverage, § 1071.2(20)
Section 1071.2(13) requires annual responder training and special equipment provided to the responding fire companies at the owner's expense, but it does not require training before occupancy or the equipment to be kept on site.
Hazardous Materials Plan required; no storage setbacks or containment, § 1071.2(50)
Borough may inspect on 24-hour notice; no annual or opening inspection required, § 1071.2(46)
Traffic study item sets only a road weight limit and cites another borough, § 1071.2(35)
Truck route plan, road maintenance agreement, and road bond; no work hours, § 1071.2(17)-(19)
125% security; removal begins within 60 days of final abandonment finding and ends within 180 days, § 1071.2(47)
Estimate and security updated every three years and before transfer; no first-year update, § 1071.2(47)(B)(e), (E)(d)
Annual reports on generator hours, efficiency upgrades, and complaints; no noise, water, or power use reports, § 1071.2(33), (39), (45)
Studies at owner's expense and Borough may inspect independently; Borough consultant cost not assigned, § 1071.1(1)(e), § 1071.2(32)
Affidavit or agreement naming the landowner and data center owner or operator; end user not required, § 1071.2(5)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the C-1 Light Commercial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data