Todd Township
Anti-Data Center Policies
Todd Township’s enacted ordinance requires setbacks from homes and other protected places, minimum site sizes, and noise limits and testing, which can sharply restrict where and how data centers are built.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Todd TownshipThe standards were added to the subdivision and land development ordinance by Ordinance No. 2026-01, which the Board of Supervisors adopted at a special meeting on September 14, 2026.Todd Township, Huntingdon County — data-center ordinance (No. 2026-01)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements25
Land development approval under the SALDO; no conditional use or special exception
500-ft setback from all adjoining property lines, Sec. 2.A.4
500-ft property line setback only; no separate sensitive-use distance, Sec. 2.A.4
500-ft setback from rivers, creeks, and streams; no added width at steep slopes or wetlands, Sec. 2.A.4
Section 2.D.3 limits the equivalent continuous sound level to 50 dB in daytime and 45 dB in evening and nighttime hours on the receiving property, with LAmax, peak, and pure tone limits, and Section 2.D.5 requires measurement under ANSI S1 and S12 practices with a calibrated ANSI Type 1 or Type 2 integrating sound level meter.
Pure-tone limits by octave band down to 16 Hz; no dBC limit, Sec. 2.D.3.e. Version 2.0 gives full credit to octave-band limits at 31.5, 63, and 125 Hz, which the stated range of bands covers, so the limits earn 2 points.
Modeling with the application and as-built study six months after occupancy; no building permit study, Sec. 2.D.7
Testing may exceed limits only in daytime hours, up to 1 hour per week, Sec. 2.D.4.e
ISO 2631-2 residential vibration standard with a study, Sec. 2.D.6 and 2.D.7.
Water feasibility study and aquifer-tested hydrogeologic report; no bar on wells for cooling, Sec. 2.E
Cooling method not regulated
Quarterly withdrawal reports; no drought plan, Sec. 2.G.4
Discharge amount, means, and temperature described in the water study, Sec. 2.E.4.d
Utility certification of capacity and service; no electrical inspection, Sec. 2.L.1.
Substations counted as accessory uses and equipment screened, Sec. 1 and Sec. 2.C
25-ft planted buffer, Sec. 2.B.1
Equipment within 500 ft of roads or sensitive receptors enclosed or screened; no height or acoustic standard, Sec. 2.C
Emergency plan accepted by the fire department; no updates, radio, or contacts, Sec. 2.M.1
Plan must ensure responder training; no funding, Sec. 2.M.1.d
Annual fire safety inspections, Sec. 2.M.1.e
Paved and bonded road entrance only; no road class or secondary access, Sec. 2.O.2
Construction noise limited to daytime hours and road entrance bonded; no haul routes, Sec. 2.D.4.f and 2.O.2
Quarterly water and groundwater reports, Sec. 2.G.4
Security drawdown and injunction; no specific penalties, Sec. 2.I
Operator not required to be named
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data