Tinicum Township
Anti-Data Center Policies
Tinicum Township’s enacted rules allow data centers only with conditional-use approval in two zoning districts, with large setbacks and extensive studies and operating conditions that make approval harder but do not ban them.
current law · Tinicum TownshipAmends Tinicum Township’s zoning ordinance to define data centers and accessory uses and allow them only by conditional use in the Special Use District and, where applicable, the Heavy Industrial District within the Industrial Heritage Corridor Overlay District; they are prohibited elsewhere.Pennsylvania Tinicum Township Ordinance 2026-937 (2026)
What this means
The measure would allow data centers only by conditional-use approval in two zoning districts and impose large setbacks, extensive studies, monitoring, and other costly conditions. These requirements would make finding a suitable site and getting approval substantially harder, though they would not ban data centers entirely.
People behind it
- Roger Joseph
Moved to adopt Ordinance 2026-937, with the motion seconded by Patrick Barr.
- Patrick Barr
Seconded the motion to adopt Ordinance 2026-937.
- Tinicum Township Board of Commissioners
Adopted and enacted Ordinance 2026-937 amending the Township zoning code to regulate and conditionally permit data centers and accessory uses.
Restrictions & requirementsHide restrictions & requirements42
Data centers and data center accessory uses are allowed only by conditional use approval from the Board of Commissioners, and only in the Special Use District or, where applicable, the IHCO overlay’s HI District; they are prohibited in all other zoning districts.
Data center accessory uses must be secondary and incidental to a data center and generally must be located on the same tract or on adjacent parcels developed as one unified development.
A data center site must contain at least 2 acres.
Data centers are limited to a 35-foot building height, with up to 10 additional feet allowed for specified roof-mounted equipment. Accessory uses may not exceed the principal building’s height, excluding roof equipment.
Data centers and accessory uses must be set back at least 1,000 feet from residential zoning or uses, sensitive receptors, adjoining property lines, and road rights-of-way.
Data center electric substations generally must be set back 1,000 feet from adjoining property lines, road rights-of-way, existing residential structures outside the project parcel, and sensitive receptors; they must also be 50 feet from project parking lots and 200 feet from waterbodies, streams, and wetlands.
A landscape buffer is required next to residential areas, sensitive receptors, and public roadways. The buffer must be at least 50 feet wide, cannot contain structures, parking, storage, loading, or signs, and must meet specified year-round screening, planting, maintenance, and replacement standards.
Applicants must provide a performance guarantee for required buffer landscaping equal to its estimated installation cost, and the guarantee generally cannot be released until after the second growing season.
Roadside fencing may not be chain-link or include barbed wire or similarly intrusive deterrence devices unless the fencing is fully screened from view.
Cooling, ventilation, and operating equipment, including backup generation equipment within 1,000 feet of a roadway, residential area, or sensitive receptor, must be fully enclosed unless the applicant demonstrates that enclosure is mechanically infeasible; otherwise, it must be fully screened by approved buildings, vegetation, berms, or solid screens.
Data centers and accessory uses must comply with detailed daytime, evening, and nighttime sound limits. For example, the equivalent continuous sound level limit is 50/45/45 dB for rural or low-density residential areas and sensitive-receptor properties, 55/50/45 dB for medium- and high-density residential areas, and 65/60/55 dB for mixed-use, commercial, and industrial areas.
Maximum, peak, and pure-tone sound levels are separately limited, and mechanical or acoustically induced vibration may not exceed 200 micrometers per second RMS in any one-third octave band.
A professional acoustical expert must submit a sound-modeling study with the application and an as-built sound study six months after the certificate of occupancy and before final escrow release; later studies may also be required by the Township.
A data center may not be approved without demonstrating an adequate water supply and showing that withdrawals and discharges will not adversely affect nearby groundwater or surface waters.
Public-water applicants must provide certification that the public authority will supply the required water. Applicants relying on nonpublic sources may need Delaware River Basin Commission approval for withdrawals of at least 100,000 gallons per day averaged over 30 days or consumptive use of at least 20,000 gallons per day averaged over 30 days.
Applicants relying on nonpublic groundwater or surface-water withdrawals must submit a detailed water-feasibility study, including projected average and peak demand, water uses, recycling and discharge, nearby wells and sewage systems, surface waters, habitats, and other required technical information.
Groundwater proposals require a hydrogeologic report by a Pennsylvania-licensed professional geologist, aquifer testing, sustainable-yield analysis, drought-availability analysis, and analysis of impacts on nearby wells, surface waters, and the groundwater table.
Surface-water withdrawals must satisfy basin-specific flow, passby-flow, withdrawal, flood, and habitat-protection standards, generally based on at least 10 recent years of flow records or an approved reference stream gauge.
For nonpublic groundwater projects withdrawing or discharging at least 50,000 gallons per day over a consecutive 30-day period, nearby property owners within 3,000 feet or the applicable cone of depression must be notified and offered baseline well testing before the aquifer test.
Groundwater projects must provide a monitoring plan with upgradient and downgradient monitoring wells, collect pre-withdrawal benchmark data, inspect wells at least monthly, and submit quarterly reports on withdrawals, groundwater levels, precipitation, equipment accuracy, and monitoring trends.
The operator is presumed responsible for adverse impacts to water-supply wells within the area of influence occurring within 60 months after production begins, and must remediate confirmed impacts at no cost to affected owners. Financial security is required based on $10,000 multiplied by the number of other groundwater wells in the hydrologic environment.
Applicants connecting to the electric grid must provide certification from the electric service provider that sufficient capacity is available and that the provider will serve the data center, including disclosure of known project-related impacts on electric rates or availability.
An Emergency Response Plan must be submitted, reviewed and accepted by the local fire department and emergency management services, and must address fire suppression, containment, ventilation, evacuation, emergency access, responder training, inspections, and 24-hour emergency contacts.
Battery or other energy-storage systems must comply with NFPA 855 or similar standards and include fire-suppression systems specifically designed for battery storage.
Facades facing roads, residential districts, or existing residences must incorporate at least two specified design elements for every 150 horizontal feet, such as changes in materials, height, or five-foot-deep step-backs or recesses.
Parking must be provided at a rate of at least one space per 8,000 square feet of employee-accessible floor area or one space per employee on the largest shift, whichever is less.
Electric substations must have year-round opaque landscaping or an at least eight-foot screen wall, generally be located to the side or rear of the principal building, and not be located in a required front yard.
New or enhanced electric transition and distribution lines must be underground where technically possible, and on-site power lines of 34.5 kV or less must be buried.
On-site generation must meet environmental, safety, and utility-interconnection standards; generators must be Tier 4 or better, and all building roofs must be designed as solar-ready.
A Solar Energy Plan must identify projected annual electricity use, proposed solar systems and capacity, expected generation, and an installation schedule requiring solar systems to be installed no later than 12 months after the certificate of occupancy.
A Conditional Use application must include an Environmental Impact Study prepared by an environmental engineer addressing groundwater, surface water, air, soil, combustible materials, emissions, fire and emergency operations, odors, noise, smoke, dust, glare, heat islands, vibration, and electrical disturbance.
A licensed professional engineer must prepare a Traffic Impact Study covering nearby roads, intersections, and interchanges, including traffic volumes, trip generation, level of service, parking demand, truck deliveries, and mitigation of identified hazards or congestion.
A Conditional Use applicant must submit an economic impact study estimating Township costs for infrastructure, emergency preparedness, administration, police, and fire protection, as well as projected tax and other revenues.
As a condition of approval, the applicant must enter into one or more Community Benefits Agreements addressing impacts on infrastructure, environmental and historic resources, emergency responders, roads, sewer systems, local government, and other identified impacts; the agreement may require improvements or payments in lieu.
Applicants must submit a long-term site master plan identifying current and future data center buildings, accessory uses, generators, energy systems, substations, cooling equipment, water and wastewater systems, fuel systems, roads, emergency access, conservation areas, setbacks, buffers, wetlands, waterways, and other infrastructure. Parcels may be added or removed only through a subsequent Conditional Use application.
A separate Development Agreement is required to document preemptive public improvements and safety-related upgrades needed to address impacts on fire companies, emergency response, equipment, training, and electric-grid infrastructure.
Cooling systems must use closed-loop, air-cooled chiller technology; open-loop or once-through evaporative chilling is prohibited.
Backup power may be used during emergencies or when the utility provider identifies grid vulnerability, but regular unnecessary generator use is prohibited.
Final land-development applications must include utility confirmation letters stating no impact or that utilities will serve the project, on-site water recycling is required, and wastewater must receive pretreatment before sewer discharge, specifically addressing PFAS.
The applicant must provide an executed Utility Curtailment Agreement requiring automatic reduction to maintenance-only operations, not exceeding 10% of normal capacity, during a grid emergency, peak-demand event, or voltage reduction.
Applicants must provide decommissioning and upgrade procedures covering removal and disposal of obsolete electronic materials and must post upfront bonding to cover potential municipal costs from site abandonment or decommissioning.
Operators must submit annual compliance reports detailing monthly utility use and efficiency, generator use, reductions in efficiency, and spikes in energy or water consumption.
Benefits & exceptionsHide benefits & exceptions11
The ordinance creates a conditional-use approval pathway for data centers and their accessory uses in the Special Use District and, where applicable, the HI District of the Industrial Heritage Corridor Overlay District; they are not prohibited outright in those districts.
The definition of Data Center Accessory Use broadly permits related administrative, logistical, fiber-optic, storage, security, power-generation, energy-storage, substation, utility-line, cooling, water, wastewater, and environmental-control facilities when located on the same tract or on adjacent parcels developed as a unified project.
Accessory renewable-energy systems, including battery storage and on-site solar generation serving the data center, are expressly permitted.
The dimensional standards allow a data-center building to be up to 35 feet high, plus up to 10 additional feet for roof-mounted cooling, ventilation, HVAC, and similar equipment.
The ordinance establishes a minimum data-center lot size of 2 acres, providing a defined path for projects on sites meeting that threshold.
Data-center electric substations may serve users on the same or adjacent site, or on a site immediately across a road right-of-way, and an on-site substation may be placed beside or behind the principal building without an internal buffer between the building and substation.
On-site or behind-the-meter generation using natural gas, renewable fuels, or other clean sources is permitted when used to improve reliability, efficiency, or sustainability, subject to environmental, safety, and utility-interconnection standards.
The parking requirement is limited to one space per 8,000 square feet of employee-accessible floor area or one space per employee during the largest shift, whichever is less.
Existing topography or vegetation may satisfy all or part of the required landscape buffer, reducing the amount of new buffering that must be installed.
The required sound limits do not apply to emergency standby generators during emergency use, and generator testing during specified daytime hours may exceed the normal limits by up to 20 dBA or 20 dB for up to one cumulative hour per seven-day period.
The long-term site master-plan process allows an applicant to identify current and future data centers, accessory uses, substations, generation systems, cooling equipment, water systems, and other infrastructure on a unified plan, providing a framework for planned expansion subject to a later conditional-use application for added or removed parcels.
Sources
current law · Tinicum TownshipAllows data centers and related uses only with conditional-use approval in designated districts, subject to requirements for setbacks, noise, water use, utilities, emergency planning, and community impacts.Tinicum Township Zoning Ordinance proposed amendment to address data centers (ZA-43-8283-26)
What this means
The measure would allow data centers only through conditional-use approval in two designated areas, with 1,000-foot setbacks that could sharply limit suitable sites. Applicants would also face extensive noise, water, traffic, and other studies and operating requirements, making development and operation substantially harder, though not banning them outright.
People behind it
- Tinicum Township Board of Commissioners
The ordinance identifies the Board as seeking to add the data-center zoning provisions; it was scheduled to consider adopting the ordinance.
Restrictions & requirementsHide restrictions & requirements28
Data centers and accessory uses may be permitted only by conditional use in the Special Use District or, where the overlay applies, the HI District; they are not permitted in any other zoning district. only permitted by Conditional Use
A data center site must have at least 2 acres. Data center buildings are limited to 35 feet, with up to 10 additional feet for specified roof equipment; accessory uses cannot exceed the principal building’s height, excluding roof equipment. minimum lot area shall be 2 acres
Data centers and accessory uses must generally be set back at least 1,000 feet from residential uses or districts, sensitive receptors, other adjoining property lines, and road rights-of-way. set back a minimum of 1,000 feet
A landscape buffer at least 50 feet wide is required next to residential uses or districts, sensitive receptors, or public roads. The ordinance specifies planting quantities, sizes, species mix, ongoing maintenance, replacement of dead or damaged plants, and a performance guarantee held until after the second growing season. at least 50 feet in width
Cooling, ventilation, and operating equipment, including backup generators, within 1,000 feet of a road, residential use or district, or sensitive-receptor lot line must be fully enclosed; if that is not mechanically feasible, it must be screened by an approved method. must be fully enclosed
Operations must meet the ordinance’s sound limits at receiving properties, which vary by zoning and time of day; separate limits also apply to maximum, peak, and pure-tone sound. shall not exceed the following values
Applicants must submit a sound-modeling study with the application, and an as-built sound study is due six months after the certificate of occupancy and before final escrow release for a land-development phase. The Township may require later studies, and a demonstrated violation is an ordinance violation. six months after issuance
Mechanical or acoustically induced vibration may not exceed the ISO 2631-2 Residential Day criteria; the stated limit is 200 μm/s RMS in any one-third-octave band. shall not exceed 200
Approval requires proof of adequate water supply and that withdrawals and discharges will not adversely affect nearby groundwater or surface water. Public-water users need certification from the public authority; nonpublic groundwater or surface-water users generally need a water-feasibility study and supporting technical analysis. For qualifying nonpublic withdrawals of at least 100,000 gallons per day, or consumptive use of at least 20,000 gallons per day, averaged over 30 days, the applicant must provide Delaware River Basin Commission approval instead of an additional feasibility study. No Data Center shall be approved unless
For a nonpublic groundwater source with withdrawals or discharges of at least 50,000 gallons per day over any consecutive 30-day period, the applicant must notify owners within 3,000 feet or the production wells’ cone of depression, whichever is greater, and offer baseline well testing. The applicant pays for testing if the owner permits it, including when the owner chooses their own qualified testers. 50,000 gallons per day
Groundwater users must provide a monitoring plan, maintain monitoring wells, and submit quarterly reports covering withdrawals, groundwater levels, precipitation, and other specified information. Monitoring wells generally must be inspected at least monthly, with damaged wells restored within two weeks unless an extension or weather exception applies. quarterly reports
For certain nearby well impacts occurring within 60 months after production begins, the operator is presumed responsible unless it proves otherwise. If the Township determines the data center caused an adverse water impact, the operator must remedy it at no cost to affected owners; financial security is required at land-development approval at $10,000 per other groundwater well, subject to release after 60 months except for pending claims. presumed to be responsible
Applicants connecting to the electric grid must provide the service provider’s certification that capacity is available and service will be provided, and disclose known project impacts on electric rates or availability for other users. Power-generation systems supplying a data center during normal operations are treated as a separate use and need approval under the zoning rules for that use. necessary capacity is available
Applicants must submit an emergency response plan reviewed and accepted by local fire and emergency-management services. It must address matters including fire response, evacuation, responder access and training; battery storage must meet NFPA 855 or similar standards and include battery-specific fire suppression. Annual fire-safety inspections are also required. reviewed and accepted by the local fire department
Building façades facing a road, residential district, or existing residential use must include at least two specified design elements every 150 horizontal feet. at least two
Parking must be provided at one space per 8,000 square feet of regularly employee-accessible floor area or one space per employee on the largest shift, whichever number is lower. whichever is lesser
Data-center substations have specified setbacks, including 1,000 feet from adjoining properties and public road rights-of-way, 1,000 feet from residential structures or sensitive receptors, 50 feet from on-site parking lots, and 200 feet from waterbodies, streams, or wetlands. They also require year-round opaque screening at least eight feet high; on-site substations must be placed to the side or rear, and specified power lines must be underground when technically possible. 200 feet to any body of water
A conditional-use application must include a traffic impact study covering nearby roads and intersections, projected traffic and parking, and proposed mitigation; identified hazards or congestion must be avoided or mitigated to the Commissioners’ satisfaction. submit a Traffic Impact Study
Applicants must submit an economic-impact study estimating Township-related costs and revenues for the Township, school district, and county. economic impact study
Conditional-use approval is conditioned on the applicant entering into one or more written community-benefit agreements to the Commissioners’ satisfaction; the listed possible terms include infrastructure, environmental, emergency-response, and other community measures or fees in lieu. As a condition of approval
Applicants must submit a long-term site master-plan sketch identifying intended parcels and specified proposed uses and infrastructure. Parcels may be added to or removed from the plan only through a subsequent conditional-use application. only be added or removed
A development agreement is required to address community impacts, including potential fire-company equipment and training needs and power-grid upgrades. A Development Agreement shall be required
Cooling must use closed-loop, air-cooled chiller technology; open-loop or once-through evaporative chilling is prohibited. Open-loop or once-through
Power generation may be used when the utility provider indicates grid vulnerability; regular unnecessary use is prohibited. regular unnecessary use is prohibited
The final land-development application must include utility no-impact/will-serve confirmation letters. On-site water recycling and wastewater pretreatment before sewer discharge, specifically for PFAS, are also required. on-site water recycling
Applicants must provide an executed utility-curtailment agreement requiring automatic reduction to maintenance-only operation, capped at 10% of normal capacity, during a grid emergency, peak-demand event, or voltage reduction. not to exceed 10%
Applicants must provide decommissioning or upgrade guidelines, details for removal and disposal of obsolete electronic materials, and upfront bonding to cover potential site-abandonment or decommissioning burdens. Upfront bonding
Operators must provide an annual compliance report with monthly utility-use information and analysis, including explanations of generator use, efficiency declines, and spikes in energy or water use. annual report detailing
Benefits & exceptionsHide benefits & exceptions5
Data centers and their accessory uses are eligible for conditional-use approval in the Special Use District and, where the overlay applies, the HI District. They are not permitted in other zoning districts. permitted by CONDITIONAL USE
The ordinance recognizes a broad range of on-site accessory facilities—including generators, energy storage, substations, utility lines, cooling systems, and water and wastewater facilities—as data center accessory uses, provided they are on the same tract or adjacent parcels developed as a unified project. including but not limited to
Accessory renewable-energy systems, including battery storage and on-site solar serving the data center, are permitted. Accessory renewable energy systems
Parking may be calculated using the lesser of one space per 8,000 square feet of regularly accessible floor area or one space per employee on the largest shift. whichever is lesser
Emergency standby generators are exempt from the sound limits during emergency use. Routine testing may exceed those limits by up to 20 dBA (or 20 dB for peak sound) for up to one cumulative hour per seven-day period, but only during specified daytime hours. Emergency standby generators during emergency use
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data