Tilden Township

Anti-Data Center Policies

Tilden Township’s enacted measure gives local officials a protected period to address zoning gaps, potentially delaying challenges by developers but not banning every data-center project.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Tilden Township
The Board of Supervisors adopted Resolution 2026-11 declaring a municipal curative amendment and sent a sample data center ordinance to the Planning Commission.Tilden Township, Berks County — data-center resolution 2026-11

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

pending · Tilden Township
Declares Tilden Township’s zoning ordinance invalid for not allowing data centers and directs officials to prepare a corrective amendment and new data-center rules.No data-center-specific law or ban identified in Tilden Township

People behind it

  • Proposed legislation to impose a three-year moratorium on data-center development. Her legislation would place a three-year moratorium

  • Proposed a bill to promote Pennsylvania as a destination for data centers and establish a regulatory sandbox. Another bill by Greg Rothman

  • Declared the township zoning ordinance invalid for not providing for data-center use and authorized preparation of a curative resolution and draft zoning amendment. authorize the Township Solicitor to prepare a draft zoning ordinance amendment

Show 6 more peopleShow fewer people
  • Tilden Township Solicitor authorized by the Board to prepare a curative resolution and draft data-center zoning amendment. authorize the Township Solicitor to prepare a resolution

  • Began developing rules to address data centers and discussed possible ordinance requirements. begin the process of establishing rules

  • Advanced a draft data-center ordinance for advertising. became the first municipality in Berks to advance a data center ordinance

  • Was developing new rules to regulate data-center development. aims to advertise new data-center rules

  • Was working through a draft data-center ordinance. working its way through a data center draft ordinance

  • Was developing guidance for municipalities seeking to regulate data-center development. in the process of establishing guidelines

Restrictions & requirementsHide restrictions & requirements14
  • A proposed three-year statewide moratorium would pause data-center development to give municipalities time to write rules. three-year moratorium on data center development

  • A state bill passed by the House would require data centers to pay the full cost of grid upgrades, transmission, and reliability needs. cover the full cost of grid upgrades

  • The same state bill would require data centers to use renewable energy resources and contribute to energy-assistance and clean-energy funds. use renewable resources

  • Cumru Township’s draft ordinance would limit data centers to an area around the former Titus Station. limiting data center development to an area

  • Cumru’s draft would require screening and berms to reduce visual and noise impacts. Requiring screening and berms

  • Cumru’s draft would limit buildings to 50 feet, or 80 feet with commissioners’ approval. maximum height of 50 feet, or 80 feet

  • Cumru’s draft would set daytime and nighttime noise limits and require sound studies to verify compliance. decibel limits for day and nighttime hours

  • Cumru’s draft would make developers pay for water, electric, or sewer use that exceeds existing system capacity. cover the cost of any water, electric or sewer usage

  • Cumru’s draft would require developers to show that utility use would not affect water supplies, cause outages, or otherwise harm public health and safety. prove that their utility usage won’t affect water supplies

  • Cumru’s draft would require an environmental impact study, adequate emergency access, and a plan for handling and disposing of batteries and other hazardous materials. environmental impact study, adequate emergency access

  • Cumru’s draft would require a facility to be decommissioned within one year after it stops operating as a data center. decommission the facility within a year

  • South Heidelberg’s proposed rules would permit and regulate data centers only in its I-3 industrial district. in the I-3 industrial district

  • South Heidelberg’s proposed rules would require landscape buffers along property lines and an environmental and community impact study. landscape buffers along property lines

  • South Heidelberg’s proposed rules would require developers to explain how they would meet a data center’s water and electricity needs. how they plan to meet their data center’s water and electricity needs

Benefits & exceptionsHide benefits & exceptions1
  • A proposed bill would create a “regulatory sandbox” for industry leaders to work with state agencies to remove regulations considered unnecessary or outdated for AI and data centers. The source does not specify which regulations could be removed or any conditions for doing so. The bill’s proposed regulatory sandbox

Sources

pending · Tilden Township
The township provided the draft through an October 28, 2026 Right-to-Know grant, and the Board of Supervisors has advertised a public hearing for November 12, 2026 at 7:00 p.m., after which it may vote on enactment.Tilden Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements34
  • Special exception by the Zoning Hearing Board, expiring after one year unless a complete land development plan is filed, draft Section 2.A and 2.B

  • Allowed only in the L-2 Industrial District, and agricultural land is a sensitive receptor with a 500-foot setback; preserved farmland and prime soils not addressed, draft Sections 1, 2.A and 3.A.3

  • 35-foot maximum height for a data center; rooftop equipment not counted in the height, though it must be enclosed and screened, draft Section 3.A.2 and 3.C

  • 200-ft setback from wetlands and watercourses and an environmental impact assessment; no added width on steep slopes, draft Section 3.A.3.c and 3.H

  • Any building expansion or increase in equipment requires a new special exception; no electrical demand trigger or like-for-like exemption, draft Section 2.C

  • LEQ limits of 50 dB day, 45 dB evening and 45 dB night at residential and sensitive receptor properties, with log-average method and ANSI Type 1 or 2 meters, draft Section 3.D.3 and 3.D.6

  • Pure tone limits by octave band from 16 Hz through 8,000 Hz (Table 2) and a violation when dBC exceeds dBA by 15 dB, draft Section 3.D.3.e and 3.D.4

  • Sound modeling study by ISO 9613-2 with the application and as-built studies six months after occupancy and every five years; full operating load not specified, draft Section 3.D.8

  • Testing may exceed limits only in daytime hours, weekends included, for up to one cumulative hour per seven days, draft Section 3.D.5.e and 3.F.1.b.v

  • 200 micrometers per second RMS in any one-third octave band under ISO 2631-2, with a sound and vibration study, draft Section 3.D.7 and 3.D.8

  • Wells require a hydrogeologic report with an aquifer test above 10,000 gpd; public water not required, draft Section 3.E.5

  • 100 percent closed-loop cooling required, and open-loop, once-through and evaporative cooling barred for routine operations, draft Section 3.E.1.b

  • Quarterly metered withdrawal reports and real-time water telemetry; no drought plan tied to drought declarations, draft Sections 3.E.5.d.iv and 3.F.1.d

  • Description of water recycled or discharged and blowdown management to the treatment works; no DEP or sewer approvals before the zoning permit, draft Sections 3.E.1.d and 3.I.7

  • Generator fuel spill containment, 110 percent secondary containment for tanks, and contaminated stormwater routed through oil and water separators, draft Sections 3.F.4.c, 3.I.6 and 3.I.7

  • Backup generators must meet EPA Tier 4; no annual emissions testing or reports, draft Section 3.F.4.a

  • CFD temperature modeling within 500 ft of property lines, 2 degree F limit at the boundary, and a waste heat reuse feasibility assessment, draft Section 3.F.1.b.iv

  • Electronic waste plan naming licensed recycling and disposal providers; no requirement to keep a disposal contract in effect, draft Section 3.J

  • PJM studies and an executed Interconnection Service Agreement filed with the special exception application, draft Section 3.F.1.a and b.i

  • Peak megawatt draw and PUE projections required; no annual use by phase or on-site renewable requirement or incentive, draft Section 3.F.1.b.ii and iv

  • Generation for normal operations is a separate use under its own zoning rules and behind-the-meter fossil plants are barred; no equal noise and emission standards stated, draft Section 3.F.1.b.v and 3.F.2

  • Setbacks and screening apply to dedicated substations and transformers; no side or rear placement or buried lines, draft Section 3.A.3.d

  • BESS must meet NFPA 855, be inside enclosed buildings, and have containment; no setbacks from homes and wells or hazard mitigation analysis, draft Section 3.I.2 to 3.I.4

  • Notarized certification that the applicant funds 100 percent of grid upgrades and annual cost verification reports; no disclosure of tariff terms, draft Section 3.F.1.b.v and 3.F.1.c

  • 75-ft landscape buffer with a four-season screen and replacement of dead plants within 150 days, draft Section 3.B

  • Ground and roof equipment, including generators, fully enclosed and screened from view, with noise controls such as berms and attenuation, draft Section 3.C and 3.D.1

  • Emergency response and fire protection plans accepted by the fire department and updated every five years; no annual update or responder walk-through, draft Section 3.I.1

  • Spill prevention plan with 110 percent secondary containment filed in review; no storage setbacks from property lines, wells or streams, draft Section 3.I.6

  • Annual fire safety inspections by a qualified professional for the data center; no report to the fire official or correction deadline, draft Section 3.I.1.e

  • Engineering and traffic study of township streets only when water is trucked in; pre- and post-construction street condition studies otherwise, draft Sections 3.A.4.b and 3.E.2.b

  • Construction noise limited to daytime hours, street condition studies, and an excess maintenance agreement for water hauling routes; no general haul route or bond, draft Sections 3.A.4.b, 3.D.5.f and 3.E.2.b

  • Security of 125 percent of cost with no salvage credit before the zoning permit, but removal begins within one year and ends within 18 months, draft Sections 3.M and 4.A

  • As-built sound studies every five years, quarterly water reports, real-time power and water telemetry, and annual reports, draft Sections 3.D.8.b, 3.E.5.d.iv, 3.F.1.c and d

  • Parent company guarantee and notice of any change in owner or operating entity; end user not required, draft Section 4.A.3 and 4.A.4

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: special exception in the L-2 Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data