Borough of Throop

Anti-Data Center Policies

Throop borough’s enacted rules limit data centers to eligible sites, including a designated 351-acre area, and impose setbacks and added review that can restrict projects and increase costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Throop Borough
Borough Council adopted the rules as Ordinance No. 3 of 2026 on July 23, 2026; a further amendment updating the overlay regulations, which the county reviewed and returned on October 8, 2026, is pending with no Council hearing found, and the October 27, 2026 Council agenda referred to a validity appeal of the overlay amendment filed by Protectors of Water, Wildlife, Environment and Resources (POWER).Throop Borough, Lackawanna County — data-center ordinance (No. 3 Of 2026)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements32
  • Section 404 (DC-O District, Intent) applies the overlay only to the parcels shown on the Official Zoning Map as Exhibit A and states that a Data Center shall only be permitted as a conditional use within the DC-O Overlay.

  • Barred on land under farmland preservation easements; agricultural security areas not addressed, Section 4.F.1

  • 500-ft principal building and 400-ft accessory setbacks from the tract boundary, Section 4.E.3

  • 500-ft tract setbacks protect all neighboring uses; below 1,000 ft, Section 4.E.3

  • Phased development allowed under one approval; no phasing plan or new approval

  • 55 dBA day and 45 dBA night at the tract boundary, Section 4.L.B(d)

  • Where ambient already exceeds the limits, operations may not materially increase it; no 10 dBA cap, Section 4.L.B(c)

  • Low-frequency modeling and octave band analysis required and infrasound capped at 80 dBZ; no dBC limit, Section 4.L.B

  • Section 4.L.B(g) requires a predictive study with worst-case assumptions with the application, an updated study at building permit, and an as-built test measured as LAeq with ANSI S1.4 Type 1 or Type 2 meters, but the as-built test is taken at a time representative of normal operations rather than full operating load.

  • Non-essential maintenance limited to weekday daytime hours; no hours cap, Section 4.G

  • Vibration study showing none perceptible past the tract boundary, Section 4.M.

  • Section 4.O.3 bars groundwater consumption for cooling and allows nonpublic cooling water to be trucked in, and Section 4.O.5 requires a water feasibility study with drawdown and recovery testing of wells, but cooling water is not required to come from available public water.

  • Section 4.O.1 and O.3 require closed-loop non-evaporative, dry air-cooled, or closed-loop chilled water or glycol systems and prohibit open-loop water cooling, so evaporative cooling is not allowed.

  • Section 4.O.9 requires an annual report to the Borough of water consumed, but the Section 4.O.7 Drought Contingency Plan is triggered only by a Borough water shortage declaration, not by state, basin commission, or supplier drought declarations.

  • Section 4.O.3 requires DEP approval for disposal of cooling water and Section 4.O.8 requires process wastewater to go to facilities approved by the Sewage Enforcement Officer or DEP, but neither approval is required before the zoning permit.

  • Generators must meet federal and state air quality rules, Section 4.C.B

  • Decommissioning plan covers disposal or recycling and lawful disposal of batteries and refrigerants, Section 4.S

  • Utility documentation of service feasibility; no electrical inspection, Section 4.P.1.

  • Projected annual electricity use required; renewables encouraged and roofs solar ready only, Section 4.P

  • Generation for normal operations is a separate principal use with its own approvals, Section 4.P.2.

  • Substations screened by 8-ft opaque landscaping or wall, Section 4.P.3

  • NFPA 855 with technology-specific suppression and monitoring, Section 4.Q.2.

  • Rate and availability impacts must be noted; upgrade costs not assigned, Section 4.P.1

  • 100-ft planted buffer along residential districts and uses, Section 4.H.

  • Equipment within 500 ft enclosed or fully screened; no 12-ft standard, Section 4.I

  • Elevations of all sides of each building required, Section 4.K.5

  • Emergency plan reviewed by the fire department; no annual update, radio, or 24-hour contacts, Section 4.Q.1

  • Annual fire and life-safety inspections, Section 4.Q.1.E

  • Full-cost financial security with completion within 18 months; not 110% or 6 months, Section 4.S

  • Security reviewed and adjusted every two years, Section 4.S.2

  • Annual reports on water and electricity use, Section 4.O.9 and P.7

  • Borough may order third-party noise testing, paid by the operator only when an exceedance is confirmed, Section 4.L.B(h)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Data Center Overlay (DC-O) District

Sources

current law · Throop Borough
Would limit data centers to conditional-use approval on a 351-acre site in Throop and impose rules on noise, water use, backup generators, and eventual decommissioning.Throop Borough Data Center Zoning Amendment

What this means

The proposal would allow data centers as conditional uses on a designated 351-acre site, creating a path to build there, but approval would involve extra review and requirements for noise, water, power feasibility, and site cleanup. Those requirements could add meaningful cost and delay, so the overall effect is negative but not a ban (limited to a 351-acre overlay; proposed performance standards).

Timing

Ends
at the end of the six-month pause

The article describes the pause as a quasi-moratorium, but does not specify its start date or an exact expiration date.

People behind it

  • Worked on researching and preparing Throop’s proposed data center zoning ordinance.

  • Worked with Andy Hegedus on researching and preparing the proposed ordinance.

Restrictions & requirementsHide restrictions & requirements13
  • Data centers would be allowed only as conditional uses on a designated 351-acre overlay east of the Casey Highway, restricting where they could be built in Throop. The proposed zoning overlay

  • Each project would require a conditional-use hearing, where the applicant must show compliance with borough regulations and face cross-examination; the council would then vote to approve or deny it. The conditional-use hearing process

  • Data centers would be limited to 65 feet tall, including roof-mounted equipment. The height limit

  • Applicants would have to approach the borough with a community benefits agreement. The community-benefits requirement

  • On-site power generation would not be permitted as part of a data-center use; an energy-generation system would require a separate application. The separate-application requirement

  • Backup generators would be limited to diesel, natural gas, or propane. The permitted generator fuels

  • Applicants would need a preconstruction noise study establishing baseline sound, measured in late fall or winter when leaves are off the trees; the study would need updating when the site plan and equipment are clarified and again within 90 days after an occupancy permit. The required noise-study stages and timing

  • The ordinance would set sound limits for both standard decibel levels and lower-frequency sounds. Backup generators would be exempt from noise restrictions during emergencies and outages. The sound limits and emergency exception

  • A qualified professional would have to conduct a vibration study demonstrating that vibrations would not be perceptible beyond the property line. The vibration-study requirement

  • Cooling systems would have to use closed-loop technology rather than evaporative cooling. The closed-loop cooling requirement

  • Applicants would have to submit a water-feasibility study and a drought-contingency plan. The required water documentation

  • Applicants would have to provide documentation from an electric utility showing that the project is feasible. The utility-feasibility documentation

  • A project would need a decommissioning plan, backed by a letter of credit or other financial security sufficient to cover the full cost of decommissioning and restoring the site. The decommissioning and financial-security requirement

Benefits & exceptionsHide benefits & exceptions2
  • The draft would allow data centers as conditional uses on a designated 351-acre overlay east of the Casey Highway, creating a zoning pathway to seek approval there. The proposed legislation would limit data centers as conditional uses on a 351-acre overlay.

  • Backup generators would be exempt from noise restrictions during emergencies and outages, allowing them to operate without those limits in those circumstances. The ordinance exempts data centers’ backup generators from noise restrictions during emergencies and outages.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data