Borough of Three Springs

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Borough of Three Springs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Three Springs Borough
Proposes data-center-specific rules for site size and setbacks, landscaping, noise, water use, emergency planning, and cleanup when a facility is abandoned.Three Springs Data Center Ordinance Proposal (pending)

What this means

The draft would make data centers significantly harder and costlier to build and operate, with 10-acre minimum lots and 150-foot setbacks and extensive noise, water, emergency-planning, and decommissioning requirements. It is not a ban, but the studies, ongoing monitoring, and required protections could delay projects or make some impractical.

People behind it

  • The ordinance states that the Council desires to add the provisions and that it enacts them. The Council desires to add provisions

Restrictions & requirementsHide restrictions & requirements17
  • A data center must be on a lot of at least 10 acres. Its building height is limited to 45 feet, with up to 15 additional feet for roof-mounted equipment; accessory uses cannot exceed the principal building’s height, excluding roof equipment. Setbacks of at least 150 feet are required from adjoining property lines and road rights-of-way. minimum lot area shall be 10 acres

  • A landscape buffer is required between data centers or accessory uses and sensitive receptors or public roads. It must be at least 25 feet wide, meet detailed native planting and screening specifications, and be maintained and replaced by the property owner. A performance guarantee covering installation costs must be posted and cannot be released until after the second growing season. Roadside fencing cannot be chain-link or have barbed wire or similar visible deterrents unless fully screened. at least 25 feet in width

  • Cooling, ventilation, and backup-generation equipment within 300 feet of a public road or sensitive-receptor lot line must be fully enclosed. If the manufacturer’s specifications make enclosure mechanically infeasible, the equipment must instead be fully screened by an approved method. within 300 feet of a public roadway

  • Data centers and their accessory uses must meet sound limits at receiving properties: equivalent continuous levels may not exceed 50 dB during daytime hours or 45 dB during evening and nighttime hours; maximum and peak levels and pure tones have additional limits. Exceptions include emergency generator use and construction during daytime hours with reasonable noise controls. Routine generator testing may exceed the limits by no more than 20 dBA for up to one cumulative hour per seven-day period, and only during specified daytime testing hours. 50 dB 45 dB 45 dB

  • Ground-borne or structural vibration from a data center cannot exceed the ISO 2631-2 Residential Day criteria or 200 μm/s RMS in any one-third octave band. shall not exceed 200 μm/s RMS

  • Applicants must submit a professional acoustical sound-modeling study with the land-development application. An as-built sound study is required six months after the certificate of occupancy and before final escrow release for a development phase; the Borough may also require later studies. submitted with the land development application

  • Approval requires demonstration of an adequate water supply without adverse effects on nearby groundwater or surface waters. Public-water users must provide supply-authority certification. For nonpublic sources in the Susquehanna River Basin, withdrawals averaging at least 100,000 gallons per day over 30 days, or consumptive use averaging at least 20,000 gallons per day, require River Basin Commission review and approval. A feasibility study is required for nonpublic groundwater withdrawals of at least 10,000 gallons per day over any consecutive 30-day period, or for surface-water withdrawals; groundwater studies require a licensed geologist’s hydrogeologic report and aquifer testing. No Data Center shall be approved unless

  • Surface-water withdrawals must meet specified streamflow and flood-flow standards and maintain minimum passby flows while withdrawing. The standards include limited or no permitted changes to monthly flows, with passby-flow thresholds varying by drainage area from P70 for streams of 10 square miles or less to P95 for streams of at least 5,000 square miles. Withdrawals may be exempt from the table’s standards if they meet the defined de minimis limits; streams with drainage areas under 10 square miles have no de minimis exemption. Minimum passby flows must be maintained at all times

  • If a project relies on nonpublic groundwater and will withdraw or discharge at least 25,000 gallons per day over any consecutive 30-day period, the applicant must notify affected property owners within 3,000 feet or the production well’s cone of depression, whichever is greater, and offer baseline well and water-quality testing. The applicant pays for testing if an owner accepts the offer, and notices must be sent by certified mail before the aquifer test. 25,000 gallons per day

  • Groundwater users must submit a monitoring plan covering the area of influence, including specified upgradient and downgradient monitoring wells and pre-withdrawal benchmark data. The operator must inspect monitoring wells at least monthly and submit quarterly reports on withdrawals, groundwater levels, precipitation, and other required information. quarterly reports

  • A data center cannot adversely affect others’ water rights or water supplies. For impacts to wells within the area of influence occurring within 60 months after a production well reaches full production, the operator is presumed responsible unless it proves otherwise. If the Borough finds the operator responsible, it must remedy the impact at no cost to affected owners, using measures such as deepening or replacing a well or connecting the property to public water. shall alleviate the adverse impact, at no expense

  • At land-development approval, the applicant must post financial security equal to $10,000 multiplied by the number of other groundwater wells in the hydrologic environment. The Borough returns it after 60 months of full production upon written request, except for security needed for unresolved claims. multiplying $10,000.00 by the number

  • Applicants must provide a lease or similar evidence with a decommissioning clause and a clause binding successors and assigns. The data center owner must notify the Borough when operations cease or the facility is abandoned; it is presumed abandoned after 12 consecutive months of nonoperation without remedial action. Removal must occur within 18 months of cessation or abandonment, or the Borough may do the work at the property owner’s expense. The owner must restore the site, provide updated decommissioning-cost estimates every five years, and post revised surety equal to 100% of the approved estimate. not operational for a period of twelve (12) consecutive months

  • If connecting to the electric grid, the applicant must provide the service provider’s certification that sufficient capacity is available and that it will serve the data center, and must note known project-attributable impacts on electric rates or availability for other uses. necessary capacity is available

  • Applicants must submit an emergency response plan prepared by a qualified professional, reviewed and accepted by the local fire department and emergency-management services. It must address fire response, evacuation, emergency access, first-responder training, and annual fire-safety inspections. Projects with battery or other energy storage must demonstrate compliance with NFPA 855 or similar standards and include battery-specific fire suppression systems. reviewed and accepted by the local fire department

  • A data-center or accessory-use façade facing a road must incorporate at least two specified design elements every 150 horizontal feet, such as changes in materials, pattern, texture, color, or height, or qualifying step-backs or recesses. at least two of the following design elements every 150 horizontal feet

  • Parking must be provided at the lesser of one space per 8,000 square feet of floor area regularly accessible to employees or one space per employee on the largest shift. whichever is lesser

Benefits & exceptionsHide benefits & exceptions10
  • A public-water route requires certification from the public authority that it will supply the needed water; the study requirements for nonpublic sources do not apply to this route. public water supply

  • For nonpublic water sources, qualifying withdrawals or consumptive use reviewed and approved by the Susquehanna River Basin Commission do not require an additional water feasibility study. shall not be required to provide an additional water feasibility study

  • A surface-water withdrawal demonstrated to be de minimis is exempt from the ordinance’s surface-water withdrawal standards. The exemption is limited by stream drainage area and monthly flow thresholds; streams under 10 square miles cannot qualify. de minimis withdrawals

  • Existing topography or vegetation that meets the buffer’s intent may count for all or part of the required buffer yard. existing topography and/or vegetation

  • The principal data-center building may be up to 45 feet tall, with up to 15 additional feet allowed for specified roof-mounted equipment, including cooling and ventilation equipment. up to 15 additional feet

  • Fencing that would otherwise be subject to the roadway design restriction need not comply if it is fully screened from view by an allowed screening method. fully screened from view

  • Emergency standby generators are exempt from the sound limits while being used in an emergency. Routine generator tests may exceed the limits by up to 20 dBA (or 20 dB for peak level) for a cumulative hour per seven-day period, if conducted within the specified daytime hours. Emergency standby generators during emergency use

  • Construction noise is exempt from the sound limits when construction occurs during daytime hours and reasonable noise controls are used. provided that such construction occurs during Daytime Hours

  • The Borough must return posted water-impact financial security 60 months after the operator’s wells reach full production, except security needed for unresolved claims. return to the Applicant all financial security

  • Required parking is the lesser of one space per 8,000 square feet of regularly employee-accessible floor area or one space per employee on the largest shift. whichever is lesser

Sources

pending · Three Springs Borough
The draft is posted on the borough website, and Borough Council listed it for adoption at its October 5, 2026 meeting, but whether it was adopted is not yet confirmed.Three Springs Borough, Huntingdon County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose money set aside for eventual removal, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements24
  • Land development approval under the SALDO; no conditional use or special exception

  • 150-ft setback from all adjoining property lines, Sec. 2.A.4

  • 150-ft property line setback only; no separate sensitive-use distance, Sec. 2.A.4

  • Section 2.D.3 sets LAeq limits of 50 dB day and 45 dB evening and night at the receiving property, and Section 2.D.5 requires ANSI S1 and S12 practices with a calibrated ANSI Type 1 or Type 2 integrating sound level meter, a 10 dB signal-to-noise ratio, and windscreens.

  • Pure-tone limits by octave band down to 16 Hz; no dBC limit, Sec. 2.D.3.e. Version 2.0 gives full credit to octave-band limits at 31.5, 63, and 125 Hz, which the stated range of bands covers, so the limits earn 2 points.

  • Modeling with the application and as-built study after occupancy; no building permit study, Sec. 2.D.7

  • Testing may exceed limits only in daytime hours, up to 1 hour per week, Sec. 2.D.4.e

  • ISO 2631-2 residential vibration standard with a study, Sec. 2.D.6 and 2.D.7.

  • Water feasibility study and pump-tested hydrogeologic report; no bar on wells for cooling, Sec. 2.E

  • Cooling method not regulated

  • Quarterly withdrawal reports; no drought plan, Sec. 2.G.4

  • Discharge amount, means, and temperature described in the water study, Sec. 2.E.4.d

  • Utility certification of capacity and service; no electrical inspection, Sec. 2.L.1.

  • Substations counted as accessory uses and equipment screened, Sec. 1 and Sec. 2.C

  • Known impacts on electric rates must be noted, Sec. 2.L.1

  • 25-ft planted buffer, Sec. 2.B.1

  • Equipment within 300 ft of roads or sensitive receptors enclosed or screened, Sec. 2.C

  • Emergency plan accepted by the fire department; no updates, radio, or contacts, Sec. 2.M.1

  • Plan must ensure responder training; no funding, Sec. 2.M.1.d

  • Annual fire safety inspections, Sec. 2.M.1.e

  • Construction noise allowed only in daytime hours, Sec. 2.D.4.f

  • Quarterly water and groundwater reports, Sec. 2.G.4

  • Security drawdown and injunction; no specific penalties, Sec. 2.I

  • Operator not required to be named

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data