Thornhurst Township
Anti-Data Center Policies
Thornhurst Township’s enacted ordinance limits noise and building height and requires sound testing and setbacks from homes and other protected places, increasing costs while still allowing data centers to be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Thornhurst TownshipThe Board of Supervisors held its public hearing on Ordinance 48 on October 8, 2026, and the signed copy posted on the township website on October 25, 2026 states that the ordinance was resolved on October 8, 2026.Thornhurst Township, Lackawanna County — data-center ordinance (No. 48)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements21
Water feasibility study for nonpublic sources only; no riparian buffer or general environmental assessment, Section 27-403.4.E(7)(b)
67 dBA day and 57 dBA night and weekend at the property line, Section 27-403.4.E(6)(a)
Tonal penalty from a narrow band analysis only; no dBC limit or low-frequency study, Section 27-403.4.E(6)(b)
Section 27-403.4.E(6)(a) requires preliminary, interim, and as-built sound studies using ANSI S1.4-2014 sound level meters, with the as-built study six months after the certificate of occupancy, but the as-built study is not required at full operating load.
Water feasibility study for nonpublic sources and public supplier certification; no limit on well use for cooling, Section 27-403.4.E(7)(a)-(b)
Cooling method not regulated or required to be disclosed
Projected water demand and use by purpose disclosed in the feasibility study; no cap or reporting, Section 27-403.4.E(7)(b)
Disposal of wastewater used for cooling must be approved by the Sewage Enforcement Officer or DEP before approval, Section 27-403.4.E(7)(d)
Utility certification that capacity is available; no third-party electrical inspection, Section 27-403.4.E(8)(a).
Section 27-403.4.E(8)(b) makes energy generation systems serving the data center a separate use, and Section 27-403.4.F permits them only by conditional use in the R-C district subject to the data center dimensional, buffer, screening, and noise and vibration standards, but no emission standards are applied.
Utility lines buried and power equipment near roads and lot lines enclosed or screened; substation placement not addressed, Section 27-403.4.E(5)(a) and (10)(c)
Known impacts on electric rates must be noted; upgrade costs not assigned, Section 27-403.4.E(8)(a)
50-ft landscape buffer, Section 27-403.4.E(4)(a)
Equipment within 300 ft of a road or lot line enclosed or fully screened; no height or acoustic standard, Section 27-403.4.E(5)(a)
Emergency Response Plan reviewed by the fire department; no annual updates, radio coverage, or posted contacts, Section 27-403.4.E(9)(a)
Plan must ensure first responders receive system-specific training; no funding, Section 27-403.4.E(9)(a)4)
Annual fire safety inspections, Section 27-403.4.E(9)(a)5)
Financial guarantee in an amount set by the Supervisors and removal within 1 year of abandonment; no 110% security or closure notice, Section 27-403.4.E(12)
One as-built sound study six months after occupancy, Section 27-403.4.E(6)(a)3)
Noise violation treated as a violation of the ordinance, and the township may remove abandoned structures and file a lien, Section 27-403.4.E(6)(a)3) and (12)
Water study professional must be preapproved by the Board, but no township review at applicant cost, Section 27-403.4.E(7)(b)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the R-C Zoning District