Borough of Tatamy
Anti-Data Center Policies
Tatamy borough allows only micro and mini data centers in two districts, with special approval, and imposes strict energy, water, noise, setback and lot-size requirements that raise costs and limit development.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Borough of TatamyRestricts data centers to small facilities that require special approval and meet strict limits on noise, energy and water use, screening, setbacks, and construction.Tatamy data center-specific laws and bans
What this means
It would allow only micro and mini data centers in two districts, and only with special-exception approval (“solely via Special Exception”). The strict energy, water, noise, setback, and lot-size rules would make building and operating one substantially harder, though they do not expressly ban every small facility (“100% of its normal and peak electricity consumption”).
People behind it
- Council Pro-Temp Rob Wagner
Moved to advertise the data center ordinance.
- Councilwoman Holly Pierfy
Seconded the motion to advertise the data center ordinance.
Restrictions & requirementsHide restrictions & requirements14
Data centers are not permitted by right in any zoning district. Micro and mini data centers may be considered only by special exception in the Main Street Commercial District or Business Overlay District, requiring approval from the Zoning Hearing Board. Special Exception
Facilities exceeding 10,000 square feet are explicitly prohibited. The ordinance also sets a 40-acre minimum for full-scale data centers and states that qualifying vacant parcels do not currently exist in the eligible districts, effectively limiting data center development to micro and mini facilities. 40 acres
A micro or mini data center must be on a parcel of at least 1.5 acres; micro facilities must be under 2,500 square feet, and mini facilities must be 2,501 to 10,000 square feet. minimum lot size of 1.5 acres
Facilities must meet design and screening requirements: commercial-style facades, no exposed industrial container walls, and complete screening of equipment from public view with evergreen landscaping and acoustic panels. exposed industrial shipping container walls are prohibited
Noise is limited to 45 dBA by day and 40 dBA at night at the property line, with an additional 5 dBA reduction for tonal noise. Applicants must provide acoustic modeling, install sound attenuation, and submit semi-annual noise compliance reports. 45 dBA during daytime hours
Facilities must supply 100% of normal and peak electricity through dedicated on-site or directly connected clean generation; public-grid power is limited to emergency or backup safety systems. Battery storage must meet NFPA Standard 855 and receive Fire Chief approval. 100% of its normal and peak electricity consumption
Cooling systems must use closed-loop water recycling. Facilities may not use public tap water or local aquifers for primary continuous cooling, and water losses must be offset with on-site rainwater, cistern water, or purchased trucked-in non-potable water. prohibited from drawing public municipal tap water
General and secondary contractors must be prequalified and certified; the general contractor must show at least five consecutive years of relevant experience. The developer must post a performance and infrastructure protection bond equal to 110% of estimated construction costs. 110% of the total estimated construction cost
Where a facility is adjacent to residential zoning or a residential property boundary, including the Eighth Street corridor, mechanical equipment, structures, and cooling towers must be set back at least 150 feet. A 50-foot evergreen buffer and an STC-32 sound barrier around exterior chillers and transformer yards are also required. minimum of one hundred and fifty (150) feet
Before receiving a final Certificate of Occupancy or beginning network operations, the applicant must obtain independent engineering load testing and file certified results showing no specified ground-transmission effects beyond the parcel. Prior to receiving a final Certificate of Occupancy
Operators must install at least four groundwater monitoring wells, establish baseline measurements, conduct quarterly testing after construction, and submit results to the Borough Manager. They must also file an annual hydrologic budget, signed by a licensed hydrogeologist, by January 31. minimum network of four (4)
Cooling wastewater and administrative graywater must connect to the municipal sanitary sewer. Applicants must show the discharge meets treatment requirements and will not overtax or damage sewer infrastructure; on-lot disposal of industrial process wastewater is prohibited. must explicitly interconnect directly
Parking is limited to one space per 1,500 square feet of regularly accessible gross floor area, plus two contractor/service spaces and one space per peak-shift employee. At least one enclosed or heavily screened off-street loading berth is required. one (1) off-street parking space per 1,500 square feet
The ordinance takes effect five days after final adoption and enactment. five (5) days after its final adoption
Benefits & exceptionsHide benefits & exceptions2
Micro and mini data centers are allowed in the Main Street Commercial and Business Overlay districts through special-exception approval, rather than being prohibited. They are not permitted as-of-right and must meet the ordinance’s conditions. Allowed use solely via Special Exception
The ordinance sets a specific parking ratio of one off-street space per 1,500 square feet of regularly accessible floor area. It also requires two spaces for IT contractors and one space per employee present during peak maintenance operations. One off-street parking space per 1,500 square feet
Sources
current law · Tatamy BoroughCouncil voted on July 6, 2026 to advertise it and adopted it unanimously on September 8, 2026, according to the posted Council minutes, although the posted text carries a typed adoption date of September 7, 2026.Tatamy Borough, Northampton County — data-center ordinance (Ordinance 314-2026)
What this means
The measure imposes cooling and water-use rules, noise limits and sound testing and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements12
Section 3.B(1) sets 45 dBA in the day and 40 dBA at night at the property line, but no metric, meter class, or measurement procedure is stated.
Tonal penalty only; no dBC limit or low-frequency study, Section 3.B(2)
Predictive study before construction, monitoring after, Section 3.B(4)
Closed-loop required, but evaporative recirculation allowed, Section 3.D(1)
Quarterly well tests and annual hydrologic budget; no drought plan, Section 3.I
Section 3.J requires cooling bleed-off and other process wastewater to discharge to the municipal sewer and the applicant to prove compliance to the Sewer Authority Engineer, but it does not say when that approval must be obtained.
100% on-site clean generation; no energy usage plan, Section 3.C
50-ft evergreen buffer, Section 3.G(2)
All equipment screened with evergreen and acoustic panels, Section 3.A(3), G
Engineering inspections before operation, Section 3.E(3), H(2)
110% infrastructure protection bond; no hours or routes, Section 3.E(3)
Semiannual noise reports, quarterly wells, annual hydrologic budget, Section 3.B, I
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the Main Street Commercial and Business Overlay districts