Summit Township
Anti-Data Center Policies
Summit Township allows data centers only in industrial areas, with special approval and extensive studies and plans. Cooling, utility, setback, and decommissioning requirements add costs and hurdles, but do not ban development.
current law · Summit TownshipThis proposed Summit Township zoning amendment would specifically regulate data centers by limiting where they may be located, with the reported draft restricting them to industrial districts.Summit Township Data Center Zoning Amendment (2026)
What this means
Data centers would be allowed only in industrial areas and would need special approval, studies, and plans. Cooling, water, setback, and decommissioning rules would add significant costs and hurdles, but would not ban development.
People behind it
- Summit Township Board of Supervisors
Governing body that enacted and adopted the zoning ordinance and is authorized to introduce or consider amendments.
- Summit Township Planning Commission
Planning body that may propose zoning amendments and provide recommendations on them.
- Zoning Officer
Township official responsible for administering and enforcing the zoning ordinance.
Show 5 more peopleShow fewer people
- Supervisor Lee
Moved to approve Ordinance #2026-02 concerning data centers and data center accessory uses.
- Supervisor Welka
Seconded the motion to approve Ordinance #2026-02.
- Chris Lynch
Moved the motion recommending approval of the Lake Erie Premiere Properties, LLC minor subdivision plan.
- Christopher Friday
Seconded the motion recommending approval of the Lake Erie Premiere Properties, LLC minor subdivision plan.
- Lake Erie Premiere Properties, LLC.
Applicant and plan proponent for the minor subdivision plan.
Restrictions & requirementsHide restrictions & requirements42
Data centers and data-center accessory uses are allowed only in the Industrial (IND) District by special exception, not by right, requiring approval from the Zoning Hearing Board.
Special-exception applicants must demonstrate consistency with the comprehensive plan and district purpose, avoid substantial changes to neighborhood character, protect public health and safety, and comply with applicable regulations; the Zoning Hearing Board may impose additional conditions and safeguards.
Before the special-exception hearing, applicants must submit preliminary noise and vibration studies and an approved emergency-response plan.
Before the special-exception hearing, applicants must submit an environmental and community impact analysis addressing operations, employees, vehicle trips, stored materials, site resources, disposal, emergency services, water, sewage, solid waste, schools, municipal finances, and environmental impacts.
A qualified professional must prepare an environmental impact assessment addressing air pollution, truck emissions, nuisance impacts, alternatives, mitigation, and impacts on floodplains, streams, wetlands, riparian buffers, mature vegetation, and aquifer areas.
Data centers must comply with industrial performance standards limiting impacts including noise, vibration, smoke, odors, air pollution, glare, erosion, water pollution, dust, exhaust, heat, and humidity; these impacts may not be perceptible at or beyond the property line.
Applicants must submit a professional Noise Mitigation Plan and acoustic study, conduct a pre-construction baseline noise study, and complete a post-construction noise study at least one month but no more than twelve months after the first certificate of occupancy.
A qualified professional must prepare a vibration study demonstrating that vibration from the data center, accessory uses, and related equipment will not be perceptible beyond the property line.
Backup generators must meet EPA Tier 4 emissions standards or an equivalent standard and applicable state and federal requirements; annual testing and performance or emissions reporting are required.
Applicants must submit a professional-engineer-certified Energy Management Plan describing electricity demand, energy sources, storage capacity, and good-faith efforts to use renewable or clean energy.
A proposed grid connection requires documentation from the electric provider confirming available capacity and service, including known impacts on electric rates or availability for other users.
Energy-generation systems intended to supply a data center during normal operations are treated as separate uses and require separate zoning and applicable federal and state approvals.
Applicants must demonstrate adequate water supply and submit a professional-engineer-certified Water Utilization Report covering intake, sources, discharges, cooling technology, efficiency, and stormwater compliance.
Water withdrawals may not exceed the source's safe yield or adversely affect neighboring users, groundwater, wetlands, streams, or public water supplies.
Applicants must provide water-service documentation confirming available capacity and service, including known impacts on water rates or availability for other users.
Connection to public water and public sewer is mandatory, and domestic, cooling, and industrial wastewater disposal must be approved by the Summit Township Sewer Authority and/or the Pennsylvania Department of Environmental Protection.
Data centers must comply with township stormwater requirements and evaluate impacts of impervious surfaces and changed runoff on groundwater recharge.
An Electronic Waste Plan is required for removal, recycling, or disposal of servers, hazardous materials, batteries, electronic waste, and related products during upgrades or decommissioning.
New data centers and qualifying expansions must use closed-loop cooling for server racks and IT equipment; open evaporative cooling towers are prohibited unless the Township grants a conditional exemption after clear and convincing evidence that closed-loop technology is infeasible.
A cooling exemption request must include licensed-professional-engineer documentation of infeasibility and proposed alternatives meeting the ordinance's water-use, noise, and environmental standards.
Data centers may not be designed to rely on private potable wells for primary cooling make-up water.
A professional-engineer-certified Thermal Impact Mitigation Plan is required to address waste-heat reuse or dissipation and measures to reduce heat-island effects.
Hazardous antifreeze or heat-transfer fluids require spill prevention, full-system secondary containment, a hazardous-materials response plan, routine leak testing, and annual containment certification.
Data centers are prohibited in both 100-year and 500-year floodplains shown on the most recent FEMA flood maps.
A single-story data-center principal building must be at least 30 feet high, while the maximum height, including rooftop equipment, is 60 feet; accessory structures may not exceed the principal building's height.
Data-center lot coverage may not exceed 40 percent.
Data centers must provide one parking space per two guests plus one space per employee on the largest shift, and at least one off-street loading space; loading spaces may be located on only one facade of the principal building.
For residential or community property or zoning, data centers and accessory uses require a 200-foot front setback and 500-foot side and rear setbacks.
For nonresidential property or zoning, data centers and accessory uses require a 100-foot front setback and 500-foot side and rear setbacks.
Ground-mounted cooling, ventilation, heat, or power equipment requires 200-foot front and 500-foot side and rear setbacks from residential or community property or zoning.
Ground-mounted cooling, ventilation, heat, or power equipment requires 200-foot front, 300-foot side, and 300-foot rear setbacks from nonresidential property or zoning.
Native-species buffers are required along property lines, including a 50-foot public-street buffer, a 100-foot buffer beside residential or community property, and a 50-foot buffer beside nonresidential uses.
Cooling, ventilation, generator, electrical-substation, and other operating equipment must be screened to reduce noise and visual impacts; ground equipment must be enclosed when technically feasible, and rooftop equipment must be screened on all four sides.
Fencing must use durable security-grade materials, may not use barbed or razor wire, and may not exceed 10 feet in height.
A detailed emergency-response plan is required, covering flood, fire, explosion, catastrophic weather, fire suppression, containment, ventilation, evacuation, emergency access, hydrants, responder training, and annual fire-safety inspections.
The emergency-response plan must be reviewed and accepted during the special-exception process by the Perry Highway Hose Company and the Erie County Department of Public Safety, Emergency Management Division.
Battery storage and other energy-storage systems must comply with NFPA 855 or similar standards and include fire-suppression systems designed for battery storage.
A visible 24-hour emergency-contact sign with operator and local power-company information must be posted at the access entrance.
A decommissioning plan is required at application and must address equipment inventories, removal, recycling or disposal, hazardous materials, timelines, and site restoration; decommissioning must begin within one year after discontinuation or abandonment and finish within eighteen months unless the Township grants a written extension.
Before construction approval, the owner must provide financial security equal to 110 percent of estimated decommissioning costs, update the estimate every five years, and submit increased security within 30 days after Township approval of an increased estimate.
The owner must pay the Township's administrative, legal, and engineering costs for reviewing decommissioning-security estimates.
Construction, installation, occupancy, use, or a change of use requires the applicable zoning permit and Summit Township Occupancy/Use Permit; occupancy or use is prohibited until the Township issues the Occupancy/Use Permit.
Benefits & exceptionsHide benefits & exceptions12
Data centers and accessory uses are expressly allowed in the Industrial (IND) District through the special-exception process, providing a defined zoning approval pathway. Data Centers and Data Center Accessory Uses
A data center may include accessory infrastructure on the same tract or an adjacent unified development, including backup generators, electrical substations, utility lines, cooling systems, water and wastewater facilities, water-holding facilities, pump stations, and security structures. including but not limited to
A data-center electrical substation may serve users on the same or adjacent site, or on a site immediately across a road right-of-way, allowing related electrical infrastructure to be coordinated across nearby parcels. Data Center Electrical Substation
Energy-generation systems intended to supply a data center during normal operations are treated as a separate use rather than as part of the data-center use, allowing them to be pursued under separate applicable permits. shall be considered a separate use
Data-center buildings may be up to 60 feet high, including roof-mounted cooling and ventilation equipment, and may cover up to 40 percent of the lot. maximum building height shall be sixty (60) feet and maximum lot coverage shall be no greater than forty percent (40%)
Parking is set at one space per two guests plus one space per employee on the largest shift, with no maximum parking ratio specified. 1 parking space per 2 guests
New data centers and qualifying expansions must use closed-loop cooling, but the Township may grant an exemption if the applicant proves closed-loop technology is infeasible and proposes alternative technology meeting the ordinance's standards. an exemption may be granted
Special-exception proceedings have deadlines: a hearing generally must occur within 60 days of the request, and the Zoning Hearing Board must issue a written decision within 45 days after the last hearing; failure to meet required deadlines can result in approval being deemed granted. shall be deemed to have been rendered in favor of the applicant
A use approved through the special-exception process is deemed a conforming use, preventing it from being treated as nonconforming solely because it required special-exception approval. Any use for which a special exception is granted shall be deemed a conforming use
A lawful data-center use that later becomes prohibited because of an ordinance amendment may generally continue as a nonconforming use, subject to limits on expansion and abandonment; the protection ends if the use ceases for more than 12 months. such use may be continued so long as it remains otherwise lawful
After required special-exception approval, construction or development applications that conform to the zoning ordinance must be approved, while nonconforming applications must be denied. All applications for construction/development that conform to zoning ordinances shall be approved
An approved zoning permit generally remains valid for two years and may receive a one-year renewal, giving the project additional time to begin construction. valid for a period of 2 years, with a one-year renewal
Sources
current law · Summit TownshipRequires data centers in the Industrial District to obtain special-exception approval and meet detailed requirements for environmental impacts, water and energy use, cooling, safety, setbacks, screening, and decommissioning.Summit Township Zoning Ordinance § 401.41, “Data Centers and Data Center Accessory Uses” (Ordinance No. 2026-02)
What this means
The measure allows data centers in the Industrial district, but only with special-exception approval and extensive studies and plans (special-exception requirements). Strict rules on cooling, water, public utilities, and large setbacks add substantial costs and make suitable sites harder to find (cooling and setback requirements).
Restrictions & requirementsHide restrictions & requirements28
Data centers and their accessory uses are listed as special-exception uses in the Industrial District, so they require approval from the Zoning Hearing Board rather than being permitted by right. Special exceptions are subject to a hearing process and general approval criteria. Data Centers and Data Center Accessory Uses
Before the special-exception hearing can begin, the applicant must provide a preliminary noise and vibration study and an approved emergency response plan. Prior to the commencement
Applicants must submit an environmental and community impact analysis covering site conditions, operations, materials, and potential effects on emergency services, water, sewage, waste disposal, schools, and municipal finances, with evidence that impacts meet applicable standards and proposed mitigation. Environmental and Community Impact Analysis
A separate environmental impact assessment by a qualified professional must examine likely environmental effects, alternatives, unavoidable impacts, mitigation, and sensitive areas such as wetlands, streams, floodplains, and aquifer recharge areas. An Environmental Impact Assessment shall be performed
A noise mitigation plan certified by a professional acoustical engineer is required, including a pre-construction baseline study. The applicant must also arrange a post-construction study submitted 1 to 12 months after the first certificate of occupancy. Noise Mitigation Plan
A qualified professional must prepare a vibration study demonstrating that vibration from the data center and related equipment will not be perceptible to people beyond the property line. Vibration Study
Backup power equipment must meet applicable emissions laws; backup generators must meet EPA Tier 4 standards or an equivalent. Annual testing and reports to the Township and relevant agencies are also required. EPA Tier 4 emissions standards
Applicants must make good-faith efforts to maximize renewable or clean energy and submit an Energy Management Plan certified by a professional engineer. For grid connections, they must document available capacity and service, and provide known project-related effects on electricity rates or availability. Energy Management Plan
Applicants must demonstrate adequate water supply and that withdrawals will not exceed the source’s safe yield or adversely affect nearby water users, groundwater, wetlands, streams, or public water. A professional-engineer-certified Water Utilization Report and water-provider capacity documentation are required; known effects on water rates or availability must also be provided. Water Utilization Report
Applicants must demonstrate approved and adequate disposal for domestic wastewater and wastewater used for cooling or industrial purposes, including approval from the Summit Township Sewer Authority and/or Pennsylvania DEP. adequate means of wastewater disposal
The project must comply with Township stormwater requirements and identify effects of impervious surfaces and changed runoff on local groundwater recharge and stormwater characteristics. impacts of proposed impervious surfaces
An Electronic Waste Plan must describe safe removal, recycling, or disposal of server infrastructure, hazardous materials, batteries, and related products when equipment is updated or the facility is decommissioned; Township review may require supplemental or amended reports. Electronic Waste Plan
New data centers and qualifying expansions must use closed-loop cooling for server racks and IT equipment. Open evaporative cooling towers are prohibited unless the applicant proves closed-loop technology infeasible by clear and convincing evidence and obtains a conditional exemption and required state permits. Data centers may not rely on private potable wells for primary cooling makeup water. Closed-Loop Required
A professional-engineer-certified Thermal Impact Mitigation Plan is required, addressing waste-heat reuse or dissipation and measures such as vegetation, green roofs, or site design to offset heat-island effects. Thermal Impact Mitigation Plan
Cooling-loop antifreeze and heat-transfer fluids must be non-hazardous where feasible. If hazardous materials are used, spill prevention, secondary containment sized for the full system volume, a response plan, routine leak testing, and annual containment certification are required. secondary containment
Data centers are barred from locations within either a 100-year or 500-year floodplain shown on FEMA’s most recent flood maps for the Township. No data center shall be located
Dimensional limits include a 30-foot minimum height for a single-story data center, a 60-foot maximum building height including rooftop equipment, accessory-use structures no taller than the principal building, and maximum lot coverage of 40%. maximum building height
Data centers must provide one parking space per two guests plus one per employee on the largest shift, and at least one loading space. Loading spaces or bays may be on only one façade of the principal data center building. Parking Requirements
Building and accessory-use setbacks vary by adjoining land use: beside residential or community property, buildings require 200 feet in front and 500 feet at the sides and rear; beside non-residential property, they require 100 feet in front and 500 feet at the sides and rear. Ground-mounted cooling, ventilation, heat, or power equipment has separate setback rules, including up to 500 feet at residential/community side and rear boundaries and 300 feet at non-residential side and rear boundaries. Setback Requirements
Data center security fences must use specified durable, visually appealing materials, may be no more than 10 feet high, and may not use barbed or razor wire. barbed wire and razor wire are prohibited
Buffer yards with native plantings are required: 50 feet along public-street frontages, 100 feet along boundaries adjoining residential or community uses or residentially zoned property, and 50 feet along boundaries adjoining non-residential uses. minimum fifty (50) foot-wide buffer yard
Cooling, ventilation, and power equipment must be screened to reduce noise and visual effects. Ground equipment must be enclosed when technically feasible or screened by a visually solid barrier; rooftop equipment must be screened on all four sides, with visible equipment set back from the parapet by at least its height. Ground-mounted facilities and equipment
Air, dust, smoke, glare, exhaust, heat, and humidity generated by the use must not be perceptible at or beyond the property line. not perceptible at or beyond the property line
Connection to both public water and public sewer is required. Connection to public water and public sewer is required
A detailed emergency response plan must address emergencies including flood, fire, explosion, and severe weather; be reviewed and accepted by the local fire department and county emergency management services; include responder training and annual fire-safety inspections; and show adequate fire suppression, access, and evacuation measures. reviewed and accepted by the local fire department
Battery or other energy-storage systems must demonstrate compliance with NFPA Standard 855 or similar standards, including fire-suppression systems designed for battery storage. Data centers must also post 24-hour emergency contact signage at the access entrance. NFPA Standard 855
A decommissioning plan is required at application. Decommissioning must begin within one year after discontinuation or operator abandonment and be completed within 18 months after that, unless the Township grants an extension in writing. Decommissioning must begin within one (1) year
The facility owner must provide Township-approved financial security equal to 110% of estimated decommissioning costs. The estimate and security are updated every five years; increased security is due within 30 days after approval of the revised estimate, and the owner pays the Township’s review costs. financial security of 110%
Benefits & exceptionsHide benefits & exceptions3
Data centers and their accessory uses are expressly eligible for approval by special exception in the Industrial (IND) district, subject to the ordinance’s requirements and Zoning Hearing Board approval. The measure does not establish a special-exception route for data centers in other districts.
The ordinance recognizes a broad set of data-center accessory uses—including backup generators, electrical substations, utility lines, cooling and wastewater facilities, and security buildings—when located on the same tract or adjacent parcels developed as a unified data-center project.
A data center may seek a conditional exemption from the requirement to use closed-loop cooling if it demonstrates that the technology is infeasible for the project, proposes an alternative technology meeting the ordinance’s standards, and obtains the required state permits. The Township may impose conditions.
Sources
current law · Summit TownshipRequires data centers and related uses in the Industrial District to obtain special-exception approval and meet requirements for environmental impacts, noise, energy and water use, cooling, setbacks, emergency response, and decommissioning.Summit Township Zoning Ordinance § 401.41, “Data Centers and Data Center Accessory Uses”
What this means
The ordinance allows data centers in the industrial district but requires special-exception approval and extensive impact studies, and generally requires closed-loop cooling instead of open cooling towers. Large setbacks, public water and sewer connections, and financial security for decommissioning add substantial costs and hurdles, so development is harder but not banned.
People behind it
- Township Board of Supervisors
Enacted and adopted the zoning ordinance.
- Zoning Officer
Administers and enforces the ordinance.
Restrictions & requirementsHide restrictions & requirements21
Data centers are listed in the Industrial (IND) district as a special-exception use, not a use permitted by right, so approval from the Zoning Hearing Board is required. The Board must apply the ordinance’s general special-exception criteria. Data Centers and Data Center Accessory Uses.
Before the special-exception hearing begins, the applicant must provide a preliminary noise and vibration study and an approved emergency response plan. Prior to the commencement of the Special Exception hearing.
Before the hearing, applicants must submit an environmental and community impact analysis covering facility operations, nearby natural and cultural features, waste disposal, and effects on emergency services, water, sewage, schools, and municipal finances. Environmental and Community Impact Analysis.
A separate environmental impact assessment must be prepared by a qualified professional and examine existing conditions, likely environmental effects, alternatives, unavoidable impacts, mitigation, and sensitive areas. An Environmental Impact Assessment shall be performed.
Applicants must submit a noise mitigation plan and a professional acoustic study, agree to a baseline study during the special-exception process, and provide a post-construction noise study 1 to 12 months after the first occupancy certificate. A qualified professional must also show that vibration will not be perceptible beyond the property line. A Noise Mitigation Plan shall be submitted.
Backup power equipment must meet applicable emissions laws, and backup generators must meet EPA Tier 4 standards or equivalent. Annual testing and reports to the Township and relevant agencies are required. EPA Tier 4 emissions standards.
Applicants must make good-faith efforts to maximize renewable or clean energy use and submit a professional-engineer-certified Energy Management Plan. If connecting to the grid, they must document available capacity and service, and disclose known project-related effects on electric rates or availability. An Energy Management Plan shall be submitted.
Approval requires proof of adequate water supply and that withdrawals will not exceed the source’s safe yield or adversely affect nearby water users or water resources. A professional-engineer-certified Water Utilization Report and water-provider capacity and service documentation are required. A Water Utilization Report shall be submitted.
Applicants must demonstrate approved, adequate wastewater disposal, including domestic and cooling or industrial wastewater, and connect to public water and public sewer. Connection to public water and public sewer is required.
All new data centers and qualifying expansions must use closed-loop cooling for server racks and IT equipment. Open evaporative cooling towers are prohibited unless the Township grants a conditional exemption based on clear and convincing evidence of infeasibility and the applicant obtains applicable state permits. Data centers may not rely on private potable wells for primary cooling make-up water. Closed-Loop Required.
Applicants must submit a stormwater plan addressing impacts on groundwater recharge and runoff, an Electronic Waste Plan for removal and recycling or disposal, and a professional-engineer-certified Thermal Impact Mitigation Plan. A Thermal Impact Mitigation Plan shall be submitted.
Hazardous anti-freeze or heat-transfer fluids require spill prevention, secondary containment sized for the full system volume, and a hazardous-materials response plan. Routine leak testing and annual certification of containment integrity are also required. secondary containment.
Data centers are barred from locations in either a 100-year or 500-year floodplain shown on the most recent FEMA maps for the Township. No data center shall be located within a 100-year or 500-year floodplain.
A single-story data center must be at least 30 feet tall; the maximum building height, including rooftop equipment, is 60 feet. Lot coverage may not exceed 40 percent. The maximum building height shall be sixty (60) feet.
The ordinance requires one parking space per two guests plus one per employee on the largest shift, at least one loading space, and limits loading bays to one façade of the principal building. One (1) parking space per two (2) guests.
Setbacks from residential or community-use or -zoned properties must be at least 200 feet in the front and 500 feet at the sides and rear for data-center uses; corresponding setbacks from non-residential properties are 100 feet front and 500 feet sides and rear. Ground-mounted cooling, ventilation, heat, or power equipment has separate setbacks, including up to 500 feet at sides and rear. Five Hundred (500) feet side and rear yard setback.
Data-center operations must provide native-species buffer yards: at least 50 feet along public-street frontage, 100 feet beside residential or community-use or -zoned property, and 50 feet beside non-residential uses. The ordinance also requires screening of operating equipment and limits fencing to 10 feet, prohibiting barbed and razor wire. A minimum fifty (50) foot-wide buffer yard.
Air, dust, smoke, glare, exhaust, heat, and humidity generated by the use must not be perceptible at or beyond the property line. Structures must also be arranged and designed to be harmonious and compatible with the site and surrounding properties. not perceptible at or beyond the property line.
The emergency response plan must be prepared by a qualified professional and reviewed and accepted by the local fire department and county emergency management services. It must cover emergency procedures, site access and hydrants, responder training, and annual fire-safety inspections; energy storage must meet NFPA 855 or similar standards and include battery-specific fire suppression. reviewed and accepted by the local fire department.
A decommissioning plan is required at application. Decommissioning must start within one year after discontinuation or abandonment and finish within 18 months unless extended in writing. The owner must provide financial security equal to 110 percent of estimated decommissioning costs, update the estimate every five years, and pay Township review costs. financial security of 110% of the estimated cost of decommissioning.
In the Industrial Park (IP) district, uses not specifically listed as permitted are prohibited, and data centers are not listed among the IP permitted uses. All those uses not specifically stated as permitted uses.
Benefits & exceptionsHide benefits & exceptions4
Data centers and their accessory uses may seek special-exception approval in the Industrial (IND) district. Approval is not automatic and is subject to the ordinance’s special-exception criteria and data-center requirements. Listed as a special-exception use
The ordinance expressly allows a data center’s accessory infrastructure—including backup generators, electrical substations, utility lines, cooling equipment, and water and wastewater facilities—when located on the same tract or on adjacent parcels developed as a unified project. Accessory uses do not include energy-generation systems intended to supply the center during normal operations. Data Center Accessory Use
A data-center electrical substation is defined to allow service to data-center users on the same or an adjacent site, or on a site immediately across a road right-of-way. same or adjacent site
A lawful data-center use that becomes nonconforming after a zoning change may generally continue, but the ordinance limits enlargement or expansion and generally ends that protection after the use ceases for more than 12 months. may be continued so long as it remains otherwise lawful
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data