St. Thomas Township

Anti-Data Center Policies

St. Thomas Township’s enacted ordinance sets cooling and water-use rules, noise limits and testing, and setbacks from homes and other protected places; data centers remain eligible for approval, but face added costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · St. Thomas Township
Thomas Township regulates data centers and battery energy storage systems through Chapter 39 of its township code, which sets no district limits but requires a 60-acre minimum site, a 300-foot setback from all property lines, a 400-foot separation from properties with homes, schools, and parks, a 100-foot planted screen, noise limits of 55 dBA by day and 45 dBA at night at the property line, closed-loop water cooling, and on-site power with no grid connection.St. Thomas Township, Franklin County — data-center ordinance (No. 186 Of 2026)

What this means

The measure imposes cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements28
  • Code chapter applies townshipwide with no district limits, § 39-2

  • Limits on Class I and II soils (25% and 40%) but no bar on preserved farmland or agricultural districts, § 39-2 Farmland Preservation.

  • Barred on properties with threatened, endangered or rare species found in a PNDI review; no riparian buffer for data centers, § 39-2(2)(e)

  • 55 dBA day and 45 dBA night at the property line, above the 50 dBA day standard, § 39-2 Noise Control

  • Section 39-2 Noise Control bars noise more than 10 dBA above pre-development ambient levels, with ceilings of 55 dBA day and 45 dBA night, measured with ANSI S1.4-2014 meters.

  • Octave band frequency analysis required in sound studies; no dBC limit, § 39-2 Noise Control(a)

  • Preliminary study before preliminary approval and as-built study 6 months after occupancy; building permit study only at township discretion, § 39-2 Noise Control(a)-(c)

  • Vibration study must show no vibration past the property line, § 39-2 Vibration Study.

  • Water feasibility study, and hydrogeologic study with pump tests for any well; wells not barred where public water is available, § 39-2 water supply

  • Closed-loop cooling required for water cooling systems; evaporative cooling not restricted, § 39-2 Wastewater Management

  • At least 90% of cooling water reused and peak demand calculated; no cap, reporting or drought plan, § 39-2 Wastewater Management and water supply

  • Section 39-2 Wastewater Management requires the applicant to demonstrate that domestic, cooling, and industrial wastewater disposal has been provided for and approved by the Sewage Enforcement Officer or PA DEP.

  • BESS decommissioning must follow hazardous waste and recycling rules; no plan for servers or refrigerants, § 39-2 Safety (BESS)

  • Grid connection prohibited; no utility letter or electrical inspection, § 39-2 Power consumption

  • Engineer-prepared power generation proposal showing adequate supply, and LEED certification required; no on-site renewable requirement, § 39-2 Power consumption and Safety(b)

  • All power must be self-generated on site under a township-approved plan; not a separate use, § 39-2 Power consumption

  • Section 39-2(2)(d) requires a 100-foot screening buffer that is 75 percent evergreen, and requires dead plants and trees to be removed and replaced within six months of notice from the Township.

  • Principal facades must use at least two design elements, § 39-2(3).

  • Equipment in a fully enclosed building unless infeasible, and rooftop equipment behind noise-absorbing screens; no 12-ft standard, § 39-2(2)(f)-(g)

  • ERP reviewed by the fire department with annual fire safety inspections and 24-hour contact signage; no annual plan updates or radio coverage, § 39-2 Safety

  • Section 39-2 Safety requires the applicant to pay for specialized responder training at least annually and for fire department equipment for as long as the facility exists, and to fund initial and annual training for battery systems.

  • Hazardous material tanks 200 ft from property lines with required spill containment, § 39-2(6).

  • Annual fire safety inspections; no third-party electrical inspection, § 39-2 Safety

  • Section 39-2 requires a traffic impact study addressing daily operational traffic and emergency access, with construction routes handled in a separate construction transportation plan.

  • Construction transportation plan with routes and a road repair bond; no work hours, § 39-2 traffic

  • Notice within 24 hours of cessation and security of 125% of cost, but removal within 12 months after a 6-month abandonment period and 90-day notice, § 39-2 Decommissioning

  • Security reviewed every 5 years; no update after the first year, § 39-2 Decommissioning

  • One as-built sound study 6 months after occupancy, § 39-2 Noise Control(c)