Springettsbury Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Springettsbury Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Springettsbury Township
Would make data centers conditional uses in industrial and business districts, subject to proposed standards for design, noise, lighting, equipment screening, and water impacts.Proposed Springettsbury Township zoning ordinance amendment, § 325-217 (Data Centers)

What this means

The draft would make data centers conditional uses in industrial and business zones, adding an approval step and standards for design, noise, lighting, and water impacts (conditional-use standards for design, noise and water impacts). These requirements could add cost and delay, but the source describes no outright ban or incentives.

People behind it

  • Proposed treating data centers as conditional uses in industrial and business districts, with related standards.

Restrictions & requirementsHide restrictions & requirements2
  • Data centers would require conditional-use approval in industrial and business districts, adding a permitting step beyond uses allowed by right. conditional uses in industrial and business zones

  • Conditional-use standards would address building facades, screening equipment, lighting, noise, and water studies. standards on facades, equipment screening, lighting, noise and water studies

Benefits & exceptionsHide benefits & exceptions1
  • The draft would allow data centers as conditional uses in industrial and business districts, subject to standards for design, noise, and water impacts. Conditional uses in industrial and business districts.

Sources

pending · Springettsbury Township
The township posted the proposed update with tracked changes in October 2026 and is accepting written comments through November 30, 2026, with a public hearing scheduled for December 10, 2026 at 6:00 p.m., and until the update is adopted the current zoning, which does not address data centers, still applies.Springettsbury Township, York County — proposed data-center ordinance (None Adopted (Draft Under Review))

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements19
  • Conditional use heard and decided by the Board of Supervisors; no lapse of the conditional use approval, §§ 325-200(B) and 325-252

  • 100 ft side or rear setback and 100 ft use separation from residential districts and uses, § 325-97(D)(1) and Chart 325-97

  • 50 ft district limit for all structures; rooftop items wider than 3 ft count in the height, and rooftop equipment must be screened, §§ 325-97(C) and 325-217(B)

  • Residential limit of 55 dBA, 50 dBA from 9:00 p.m. to 7:00 a.m., with an ANSI measurement method, applied by § 325-217(J); the base limits are above 50 and 45 dBA, § 325-190(D), (E), and (I)

  • Octave-band limits at 31.5, 63, and 125 Hz (70, 69, and 64 dB residential), Chart 325-190, applied by § 325-217(J)

  • Noise study by an independent expert paid by the applicant with the application; no method or post-opening study, § 325-217(J)

  • § 325-191 sets peak particle velocity limits for uses in employment districts generally but is not stated to apply to data centers

  • Water feasibility study with safe yield and well impact analysis; public supply not required and no pump test, § 325-217(H)

  • Projected water needs must be calculated; no cooling method required, § 325-217(H)(1)

  • Projected water use disclosed and SRBC approval above withdrawal thresholds; no metering, reporting, or drought plan, § 325-217(H)(1) and (9)

  • Study must identify how water will be recycled or released to water bodies; no approvals required before the zoning permit, § 325-217(H)(7)

  • Year-round vegetative screen at least 6 ft high with 80% opacity next to residential uses; no buffer width or plant replacement, §§ 325-217(G) and 325-119(D)(3)

  • Facades facing public roads must use at least two of four design elements; articulation, materials, and color are not all required, § 325-217(A)

  • Ground and rooftop mechanical equipment screened by a visually solid screen, with a Zoning Officer exemption; no height or acoustic standard, § 325-217(B)

  • Hazardous material tanks set back 50 ft from property lines and 100 ft from residential property; no containment or spill plan, § 325-217(F)

  • Site must adjoin or be reasonably near an arterial or collector street; no secondary emergency access, § 325-97(H)

  • Outdoor construction equipment barred from 9:00 p.m. to 7:00 a.m. and before 9:00 a.m. on Sundays and holidays; no haul routes or road bonding, §§ 325-190(A)(2) and 325-217(J)

  • General enforcement notice, civil penalties, and permit revocation for misrepresentation; no data center revocation grounds, §§ 325-245(G), 325-247, and 325-252(E)

  • Noise study by an independent expert paid by the applicant; no municipal consultant review of studies, § 325-217(J)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed conditional use in the B-I and G-I districts