Spring Brook Township
Anti-Data Center Policies
Spring Brook Township allows data centers only through conditional approval in the M-1 district, with large setbacks, noise limits and testing, and extensive required studies and plans. These restrictions make projects harder but do not ban them.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Spring Brook TownshipAllows data centers only with special approval in the M-1 district and requires setbacks, noise and vibration limits, water and power studies, and emergency-safety plans.None found
What this means
It would allow data centers only as conditional uses in the M-1 district, with large setbacks from property lines and sensitive places such as homes and schools (conditional use and setback rules). Applicants would also need costly studies and plans covering noise, water, power, wastewater, vibration, and emergency response, creating significant barriers even though development is not banned (required studies and plans).
People behind it
- Spring Brook Township Board of Supervisors
Ordained and enacted Ordinance No. 2026-2.
Restrictions & requirementsHide restrictions & requirements17
Data centers and their accessory uses may be built only in the M-1 district and require conditional-use approval. Conditional Uses in the M-1 zoning district
Data center buildings must be at least 300 feet from property lines; accessory uses must be at least 250 feet away. Data centers must also be 500 feet from listed sensitive uses and locations, including residences, residential zoning districts, schools, childcare facilities, places of worship, and outdoor recreation facilities. setback of three hundred feet
Data center and accessory-use buildings may not exceed 40 feet in height, including roof-mounted cooling and ventilation equipment. shall not exceed forty feet
The site must be enclosed by screening, buffering, and landscaping, which the owner must maintain and replace when damaged, removed, or failing to grow. completely enclosed by screening
A professional acoustical expert must prepare sound studies for conditional-use review, building-permit review, and six months after occupancy. Normal-operation sound is capped at 65 dB(A) weekdays from 9 a.m. to 5 p.m. and 55 dB(A) at other times, measured at the property line; required noise controls must be incorporated into construction plans, and an as-built violation counts as an ordinance violation. maximum daytime
The sound limits do not apply during power outages, but studies must report anticipated sound with emergency generators running. Generator testing is limited to weekdays from 9 a.m. to 5 p.m., excluding federal holidays; the testing schedule and duration require Township review and approval, and testing requires a detailed impact statement addressing matters such as noise, emissions, and vibration. Periodic testing of standby generators
A qualified professional must provide a vibration study demonstrating that vibration from the data center and associated equipment will not be perceptible to people beyond the property line. no vibration
For public water, the applicant must document that the supplier will provide the needed water. For nonpublic water, a feasibility study must show adequate supply and that withdrawals and discharges will not harm nearby water resources; the ordinance requires specified information about demand, sources, wells, surface waters, and impacts. water feasibility study
Projects must provide proof of Susquehanna River Basin Commission review and approval if withdrawals reach 100,000 gallons per day averaged over 30 days, or consumptive use reaches 20,000 gallons per day averaged over 30 days. 100,000 gallons per day
The applicant must demonstrate adequate wastewater disposal for domestic, cooling, and industrial wastewater, with approval by the Township, Sewage Enforcement Officer, and/or Pennsylvania DEP. adequate means of wastewater disposal
For a grid connection, the applicant must provide electric-provider documentation and an interconnection agreement confirming available capacity and service, and disclose known project impacts on electric rates or availability. Any costs to Township residential customers caused by the project must be paid by the data center owner. costs to residential customers
Energy-generation systems intended to power a data center during normal operations are not treated as data center accessory uses; they are separate uses and require approval under the zoning rules applicable to them. An SMR must be licensed and permitted by the NRC and may be considered only after conditional-use approval; reactors similar to Three Mile Island and Susquehanna are expressly excluded from the SMR definition and prohibited in M-1. shall not be considered part of the Data Center use
The applicant must submit an emergency response plan for conditional-use review and obtain acceptance from the local fire department and emergency management services. The plan must address fire response, containment, ventilation, evacuation, emergency access, and responder training, and provide for annual professional fire-safety inspections. reviewed and accepted by the local fire department
Battery storage and other energy-storage devices must comply with NFPA Standard 855 or similar standards and include fire-suppression systems designed specifically for battery storage. NFPA Standard 855
Approval requires a showing that fire-suppression, containment, ventilation, and evacuation procedures sufficiently protect public health, safety, and welfare. No Data Center shall be approved unless
Standby-generator fuel storage and emissions must comply with applicable federal, state, and local rules; proof of compliance and required permits and renewals must be provided to the Township. Proof of compliance, necessary permits and renewals
Data centers must also comply with the ordinance’s dimensional and stormwater rules and with off-street parking and loading requirements applicable to warehouse and distribution facilities. Storm Water Management Regulations
Benefits & exceptionsHide benefits & exceptions3
Data centers and data center accessory uses are listed as conditional uses in the M-1 district, giving them an approval pathway there subject to conditional-use review and the ordinance’s requirements. Conditional uses in the M-1 zoning district
The ordinance recognizes a range of supporting facilities as data center accessory uses, including substations, utility lines, cooling and water facilities, and generators for temporary use during a main-power interruption. They must be on the same tract or adjacent parcels developed as a unified project; normal-operation power generation is excluded from this accessory-use category. Examples of data center accessory uses
A small modular reactor may be considered as a conditional use in M-1, providing a potential power option for a data center. It must have a design licensed and permitted by the Nuclear Regulatory Commission; larger reactors like Three Mile Island and Susquehanna are expressly excluded. An SMR may only be considered after approval as a Conditional Use
Sources
current law · Spring Brook TownshipThe current rules are in Zoning Ordinance Amendment No. 2026-2, which the Board of Supervisors enacted on August 11, 2026 after a public hearing on August 4, 2026, according to the signed copy posted on the township's Ordinances page.Spring Brook Township, Lackawanna County — data-center ordinance (No. 2026-2)
What this means
The measure imposes setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements19
Section 738A.A.1 limits data centers and accessory uses to 40 ft inclusive of roof-mounted cooling, ventilation, and HVAC equipment, but the amendment does not include the M-1 district height limit for other principal buildings, so the comparison cannot be confirmed.
65 dBA day and 55 dBA night at the property line, § 738A.A.3
Section 738A.A.3 requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but the as-built study is not required at full operating load.
Generator testing on weekdays from 9 a.m. to 5 p.m. with a schedule approved by the Township; no hours cap, § 738A.A.4
Vibration study showing none perceptible past the property line, § 738A.A.5.
Water feasibility study when nonpublic water is used; no bar on wells for cooling, § 738A.A.6
Projected water demand disclosed, § 738A.A.6
Section 738A.A.7 requires the applicant to demonstrate that adequate means of disposal for domestic wastewater and wastewater used for cooling or industrial purposes have been provided and approved by the Township, Sewage Enforcement Officer, and/or DEP.
Generator emissions must meet federal, state, and local rules with proof of permits, § 738A.A.12
Utility certification and interconnection agreement; no electrical inspection, § 738A.A.8.
Generation for normal operations is a separate use with its own approval, § 738A.A.8.
Screening, buffering, and landscaping under §§ 806 and 808; no 100-ft planted buffer, § 738A.A.2
Use completely enclosed by screening; no 12-ft or acoustic standard, § 738A.A.2
Emergency plan accepted by the fire department; no annual update, radio, or 24-hour contacts, § 738A.A.9
Plan must ensure responder training; no funding, § 738A.A.9.d
Generator fuel storage must meet hazardous materials rules with proof of permits; no setbacks or containment, § 738A.A.12
Annual fire safety inspections, § 738A.A.9.e
One as-built sound study after opening, § 738A.A.3.c
Failed as-built study is a violation; no specific penalties, § 738A.A.3.c
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the M-1 district
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data