South Londonderry Township
Anti-Data Center Policies
South Londonderry Township’s enacted ordinance limits noise, requires sound testing and setbacks from homes and other protected places, and sets minimum site sizes. Data centers may still be approved, but these requirements add costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · South Londonderry TownshipThe current rules are in Ordinance No. 234, which the supervisors adopted on June 9, 2026.South Londonderry Township, Lebanon County — data-center ordinance (No. 234)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements22
Conditional use before the supervisors; no approval expiration, § 427.B
150-ft setback when abutting a residential zone or use, § 427.C
60-ft maximum height, § 427.D
Single 55 dBA continuous limit at any property line, plus a 70 dB study limit, § 427.F
Section 427.F.3 limits backup generator testing to weekdays between 8:00 a.m. and 6:00 p.m., at no more than one hour per week per unit, with no allowance for longer tests required by code.
Water feasibility study for nonpublic sources; no pump tests or cooling-well bar, § 427.I
Closed-loop or water-efficient cooling where water is used; Energy and Cooling Management Plan, §§ 427.H, 427.I
Projected water needs must be calculated and disclosed, § 427.I
Cooling discharge must meet PA DEP standards; no approved discharge plan, § 427.I
Must meet the Air Pollution Control Act and federal hazardous air standards, § 427.M
Utility verification of capacity; no third-party electrical inspection, § 427.I.
Energy and Cooling Management Plan; renewables only where feasible, § 427.H
On-site generation subject to Township review and a safety plan, § 427.I
Section 427.I.2.A and B and I.5 require a showing of adequate electrical capacity, say the applicant should provide an interconnection agreement from the electric provider, require a utility capacity assessment, and make the applicant pay for system improvements.
50-ft landscaped buffer abutting residential, § 427.C
Full cut-off fixtures with a 0.5 footcandle limit at the boundary, § 427.G
Accessory uses screened from public view, § 427.D
Emergency Operations Plan to the Township and emergency services, § 427.L
Plan covers hazardous material incidents; no storage or disclosure rule
Annual site inspection tied to the on-site generation safety plan, § 427.I
Traffic impact evaluated under § 319, § 427.J
Decommissioning plan without financial security, § 427.N
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Light Industrial (LI) zone
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data