South Hanover Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for South Hanover Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Township of South Hanover
Would establish a data center zoning overlay on specified parcels in South Hanover Township and require conditional-use approval, large residential buffers, noise limits, water and environmental studies, and decommissioning bonds.Ordinance No. 2026-1 (proposed Data Center Overlay District ordinance)

What this means

The proposal would allow data centers on designated overlay land, but only with conditional-use approval. It creates significant hurdles, including a 400-foot buffer, strict water and noise rules, and a bond worth 125% of estimated decommissioning costs.

People behind it

  • The public notice identifies the Board as the body that would consider enacting the proposed ordinance. consider the enactment of a proposed ordinance

Restrictions & requirementsHide restrictions & requirements26
  • Data centers and accessory uses in the overlay require conditional-use review and approval in the applicable base zoning district. subject to review and approval as a conditional use

  • Data center use is limited to the defined overlay area, which the measure maps to five specified county parcels. authorized solely within the defined overlay area

  • A lot must contain at least 20 contiguous acres and be at least 200 feet wide at the right-of-way or building setback line. minimum lot area shall not be less than 20 contiguous acres

  • Once any data center building is developed, the entire mapped overall tract must be reserved exclusively for data center and accessory uses; industrial-park conditional uses are barred there until the data center uses are abandoned or cease. Agricultural crops may continue on undeveloped portions. entirety of such overall tract area

  • Required yards are 100 feet front, 75 feet side, and 75 feet rear; most accessory uses cannot occupy those setbacks, except stormwater-management facilities. Front Yard: 100 feet

  • No part of a data center or accessory use may be within 400 feet of residentially zoned property abutting the overall tract perimeter. setback of 400 feet

  • Along the specified residential property lines, the buffer must be at least 400 feet deep and include a berm at least 25 feet high, with specified slope, flat-top, and evergreen planting requirements. Existing trees or berms may substitute if the Board finds them equally or more effective; a soundwall may substitute or supplement where natural features interfere, subject to stated height and location conditions. minimum of 25 feet above grade

  • Coverage may not exceed 75% of lot area, including parking, and at least 20% must remain green or open space, excluding stormwater facilities. Coverage shall not be more than 75%

  • Principal buildings and structures are limited to 55 feet; accessory structures and uses to 40 feet, except public utility structures or facilities; roof-mounted mechanical or accessory equipment is limited to 15 feet above the roof. Facades must meet design-consistency requirements and include at least two specified features to avoid a monolithic appearance. shall not exceed 55 feet in height

  • Residential-district sound limits are 55 dBA/dBC by day and 45 dBA/dBC at night, with daytime defined as 7 a.m.–7 p.m. and nighttime as 7 p.m.–7 a.m. Generator testing is excepted only on weekdays from 7 a.m.–7 p.m. EST, for at most two hours per day and once per week, and must stay within 70 dBA and 80 dBC measured within 30 feet of the generators. Daytime Maximum dbA

  • Applicants must submit pre- and post-construction sound reports with a land-development plan. Within three months after occupancy, the Township may require an owner-funded third-party noise study; if limits are exceeded, the owner must correct the problem within 60 days. Within 3 months after issuance

  • Exterior lighting requires a photometric plan and may not exceed 0.25 foot-candles at neighboring properties, abutting lot lines, or rights-of-way. Fixtures are limited to 38 feet and must be fully shielded or cutoff to direct light downward and inward. not more than .25 foot-candles

  • Substations are not by-right accessory uses; they must be contained within the overall tract, comply with the ordinance, and may require additional planning submission if not included in the application. Substations are not considered by-right

  • Energy generation intended to power a data center during normal operations is a separate conditional use, not an accessory use. Backup generators may be used when utility power fails but cannot augment the primary system for increased processing capacity or normal operations. separate conditional use

  • Cooling must use a closed-loop system, and water from a well drilled within the overlay or from other parcels may not be used for data-center or accessory-use cooling or heat mitigation. If public water is not selected for equipment cooling, public water serving sanitary facilities cannot augment the primary cooling source to increase processing capacity. heat mitigation cooling system shall be a closed loop system

  • Cooling-source and water-needs materials must be submitted for Supervisors’ review within 30 days of a development-plan submission. A water feasibility study is required; groundwater withdrawals require a report by a Pennsylvania-licensed geologist with aquifer testing, sustainable-yield analysis, and assessment of impacts and mitigation for neighboring wells. Where required by state or federal law, SRBC review and approval is required for projects consuming at least 20,000 gallons per day. 20,000 gpd or more

  • For quarry-water cooling, the applicant must provide a thermal study and submit a groundwater-monitoring program for approval; if approved, it must be implemented, with baseline conditions established and adverse effects on residential wells documented and addressed by the owner. groundwater monitoring program

  • Applicants must notify property owners within 3,000 feet of the overlay perimeter and offer, at their expense, baseline testing of nearby wells for water quality, static level, depth, and yield. They must also post Township-determined well-protection security based on the number of nearby wells, maintained for at least ten years after operations begin. minimum of ten (10) years

  • Use of river water for cooling must comply with federal and state permitting requirements, and the area and components must be fenced at least six feet high. Applicants must also provide wastewater information and use public water and sewer for sanitary facilities. fencing of at least 6 feet in height

  • Long-term lithium-ion storage systems are prohibited. Lithium-ion storage systems for long-term storage is prohibited

  • Permitted generators must be Tier 4 or above. Tier 4 or above

  • Applicants must provide energy-demand and source reports, assess proposed renewables, plan and estimate decommissioning costs for onsite solar or wind with proposed bonding, and submit utility-feasibility and power/fiber-routing materials, including relevant Commonwealth-agency documents. estimated electrical energy needs and use

  • A land-development submission must include a decommissioning plan for hazardous materials and electronic waste and explain how the site will be returned to a neutral state. The owner must post financial security equal to 125% of the estimated decommissioning costs, subject to Township approval; estimates and security are reviewed every five years, and the security remains until decommissioning and removal or remediation are complete. one hundred twenty-five percent (125%)

  • Applicants must submit an emergency-situations analysis and response plans. After occupancy, an annual report is due by January 1 and must address fire suppression, evacuation, onsite hazardous materials, access routes, and hydrant locations. annual report shall be submitted by January 1st

  • Applicants must submit a study showing the geological impact of the proposed data-center use. study showing the geological impact

  • Each principal building must provide 1.5 off-street parking spaces per onsite employee on the largest shift and loading spaces equal to the greater of one per 125,000 square feet of gross floor area or two spaces. 1.5 off-street parking spaces per on-site employee

Benefits & exceptionsHide benefits & exceptions8
  • The overlay designates specified parcels for data-center use, and says that use is authorized within the overlay regardless of the underlying zoning district. “authorized solely within the defined overlay area”

  • For overlay parcels, the DCO standards generally replace the underlying district’s use, bulk, and area standards, and prevail over conflicting zoning provisions, subject to the floodplain rules. “standards of Article XXII shall supersede”

  • Data centers and their accessory uses are expressly eligible for approval through the conditional-use process in the overlay’s base zoning districts; approval is required, so this is not by-right permission. “subject to review and approval as a conditional use”

  • The ordinance recognizes a broad range of supporting facilities as accessory uses, including offices, utilities, cooling equipment, backup generators and fuel storage, communications connections, security facilities, roads, and parking, when located on the same tract or unified development. Substations are excluded from accessory-use status and may require additional planning submission. “Those uses and structures customarily incidental to a Data Center”

  • Once a data-center building is developed, the entire identified tract is reserved exclusively for data-center conditional and accessory uses, rather than industrial-park conditional uses, until the data-center uses are abandoned or cease. Agricultural crops may still be grown on undeveloped portions. “reserved exclusively for data center conditional and accessory uses”

  • The principal-building height limit excludes mechanical and accessory equipment, screen walls, and parapets from the height calculation; roof-mounted equipment may extend up to 15 feet above the roof. “exclude any mechanical or accessory equipment”

  • The noise limits allow weekday generator testing between 7 a.m. and 7 p.m., up to two hours per day and once per week, subject to specified sound caps; backup generators may also operate when utility power fails. Generators cannot be used to augment normal operations or increase processing capacity. “may be used when the utility supplied power system fails”

  • The ordinance provides that emergency-management reports are excluded from public records and Right-to-Know access to the extent permitted by Pennsylvania law, citing security risks. “shall be excluded from the public record”

Sources

pending · South Hanover Township
The township manager confirmed on October 21, 2026 that the ordinance has not been adopted and that this unnumbered draft is the most current version, and the township gave no date for a hearing or adoption vote.South Hanover Township, Dauphin County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements26
  • 55-ft building height and 15-ft rooftop equipment, § 2205.1

  • Floodplain District standards stated as prevailing, and a geological impact study, § 2201.3 and § 2210.8

  • 55 dBA day and 45 dBA night; daytime limit above 50 dBA, § 2207.2

  • 55 dBC day and 45 dBC night, § 2207.2

  • Pre- and post-construction sound report with the land development plan; post-occupancy study at Township option, § 2207.1 and .5

  • Section 2207.4.A limits generator testing to weekdays from 7:00 a.m. to 7:00 p.m., two hours per day, once per week, with no allowance for longer tests required by code such as the NFPA 110 annual test.

  • Section 2210.1.A and 11 bar well water for cooling and Section 2210.1.D requires a hydrogeologic report with aquifer testing for groundwater withdrawals, but cooling water may come from quarry or riverine sources and is not required to come from available public water.

  • Closed-loop cooling required, but heat rejection through cooling towers is allowed, § 2210.1.B-C

  • Water needs and usage analysis disclosed; no cap, reporting, or drought plan, § 2210.1.A and D

  • General wastewater report, § 2210.1.I

  • Tier 4 generators required; no annual emissions testing or reports, § 2210.9

  • Plan showing any heat recapture and a thermal study if quarry water is used; no reuse review, § 2210.1.B and .10

  • Decommissioning plan covers e-waste and hazardous material; servers, batteries, and refrigerants not named, § 2210.5

  • Proof that anticipated utility use is feasible; no electrical inspection, § 2210.6

  • Energy use report required; renewables analyzed only if proposed, § 2210.5

  • Substations kept within the tract and subject to all ordinance provisions; no screening or buried-line rule, Section 1

  • Section 2206.2 requires a 400-foot buffer yard with a 25-foot berm and two staggered rows of evergreens next to residentially zoned property, but the ordinance text does not require replacement of dead plants.

  • Fully shielded fixtures with a 0.25 footcandle limit at neighboring lot lines, § 2208

  • Facade consistency and at least two articulation elements required, § 2205.2.

  • Berm or soundwall only; equipment screening not required

  • Emergency report with response plans and an annual update; no fire company review, radio coverage, or posted contacts, § 2210.7

  • Annual emergency report addresses on-site hazardous materials, § 2210.7

  • 125% security for e-waste and hazardous material removal; no closure notice or removal deadline, § 2212

  • Post-occupancy noise study at Township discretion only, § 2207.5

  • Noise fixes within 60 days only; no enforcement provision, § 2207.5

  • Section 2207.5 lets the Township engage its own sound expert at the owner's expense for a post-occupancy noise study, and Section 2212 has the Township approve decommissioning estimates, but no applicant-paid consultant review of studies in land development review is stated.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in a Data Center Overlay District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data