Somerset Township’s enacted ordinance requires setbacks, noise limits and testing, and funds set aside for eventual removal, substantially narrowing where and how data centers can be built despite an approval route.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Somerset TownshipThe copy the township planning office sent is Ordinance No. 9-2026, dated as enacted by the Board of Supervisors on October 14, 2026 and effective on adoption, but its signature lines are blank and the vote has not been confirmed in approved minutes.Somerset Township, Washington County — data-center ordinance (No. 9-2026)
What this means
The measure imposes setbacks from homes or other protected places, noise limits and sound testing and money set aside for eventual removal. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements22
Conditional use; no approval expiration, Section 3
Surface waters within 1,000 ft mapped only for nonpublic water; no impact assessment, Water and Sewer Requirements (j)
Single limit of 57 dBA at the property line, Noise and Vibration Studies
Preliminary study in the conditional use process and as-built study six months after CO; none at building permit, Noise and Vibration Studies
Vibration study showing no vibration perceptible beyond the property line, Noise and Vibration Studies.
Water feasibility study with wells within 1,000 ft for nonpublic sources; no well restriction or pump test, Water and Sewer Requirements (b)-(k)
Projected water demands disclosed, Water and Sewer Requirements (d)
Water and Sewer Requirements (l) requires an applicant served by public sewer to demonstrate adequate disposal of domestic and cooling wastewater and to provide written approval from the applicable regulatory authorities, as a conditional use standard.
Removal of servers, batteries, refrigerants and electronic waste at decommissioning, Decommissioning of Facilities.
Utility documentation of capacity and service; no electrical inspection, Power Supply Requirements.
Transmission cables underground to the maximum extent practicable; substation screening not addressed, Section 3(i)
Only rate and availability impacts disclosed, Power Supply Requirements
100 ft planted buffer next to residential uses and roads, Landscape Buffer (b)-(c).
Equipment within 300 ft of roads or homes fully enclosed and 8 ft solid screening; no acoustic or 12 ft standard, Landscape Buffer (e)-(f)
Emergency plan reviewed and accepted by the fire department with annual inspections; no annual update, radio coverage or posted contacts, Emergency Plan
Operator must provide annual first responder site orientation at its sole cost, Emergency Plan.
Hazardous materials response plan with spill prevention and secondary containment; no storage setbacks, Emergency Plan (e)
Annual fire safety inspections, Emergency Plan (d)
Security of 115% and notice on cessation, but removal allowed within 12 months, Decommissioning of Facilities
Estimate and security updated every 5 years; no first-year update, Decommissioning of Facilities
One as-built sound study after opening, Noise and Vibration Studies
Affidavit of the property owner and data center facility owner, and a power purchase agreement with an end user when applicable, Section 3(g) and Decommissioning of Facilities
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the M-1 Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data