Solebury Township

Anti-Data Center Policies

Solebury Township requires studies and utility checks, noise limits and sound testing, and setbacks from homes and other protected places. Data centers can still be approved, but these rules add costs and review requirements.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Solebury Township
The rules are in Ordinance 2026-003, which the Board of Supervisors adopted on June 16, 2026.Solebury Township, Bucks County — data-center ordinance (No. 2026-003)

What this means

The measure imposes technical studies and utility checks, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements24
  • Conditional use, § 27-1702; no approval expiration

  • 150 ft buffer only, no setback, WW(2)

  • 40 ft, up to 55 ft with added setback, WW(1)(a)

  • Environmental Impact Assessment required, WW(13)

  • 55 dBA day, 45 dBA night at residential districts, § 27-2512.5.B

  • Section 27-2602.1.WW(12)(a)1) limits noise to 3 dBA above a 30-day baseline that uses the quietest night hour, but the baseline is not defined as L90, no measurement method beyond the study is stated, and no floor applies.

  • 65 dBC cap at residential lines, WW(12)(a)3)

  • Baseline before approval, audits after opening, WW(12)(a)5)

  • Public water required, no private wells, WW(14)(a)

  • Anticipated water usage disclosed, WW(14)(a)

  • Section 27-2602.1.WW(14)(b) requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, and Section WW(14)(a) requires public sewer, so the route is identified and the approval is shown in the conditional use review before any zoning permit.

  • EPA Tier 4 Final, no emissions reports, WW(12)(c)

  • Thermal Impact Mitigation Plan with waste heat reuse, WW(12)(b).

  • Energy Use Analysis and Solar Feasibility Study, WW(15)(b)

  • Section 27-2602.1.WW(15)(b)3) requires the Energy Use Analysis to estimate impacts on electric rates and power availability and, where capacity is insufficient, the system improvements the applicant must provide, with a provider capacity letter under WW(15)(b)4).

  • 150 ft Type 1 buffer next to residential uses, WW(2)(a).

  • Rooftop HVAC screened near residential districts, WW(9)(f)

  • Architectural elevations required, WW(9)(g)

  • ERP must ensure responder training, WW(17)(a)4)

  • Annual fire safety inspections, WW(17)(a)5)

  • Section 27-2602.1.WW(5)(a) requires a traffic study in all cases covering ingress, egress, and turning movements, but construction traffic and a study area reaching the nearest arterial or interchange are not required.

  • Agreement with notice and 18-month removal, no security, WW(20)

  • Annual certified report and quarterly summary, WW(12)(a)5)c)

  • Section 27-2602.1.WW(12)(a)1) has the Township hire the acoustics consultant for the noise assessment with the applicant reimbursing fees before approval of the conditional use, so the review occurs at the zoning stage rather than in land development review.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Light Industrial District