Snow Shoe Township
Anti-Data Center Policies
Snow Shoe Township’s enacted ordinance allows data centers to seek approval but limits where and how they can operate, including setbacks from homes and other protected places, noise limits, and sound testing.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Snow Shoe TownshipThe standards were set by Ordinance No. 2026-05 (Chapter 104), which the Board of Supervisors enacted on July 7, 2026, according to the signed copy.Snow Shoe Township, Centre County — data-center ordinance (No. 2026-05)
What this means
The measure imposes setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements22
Section 104-2B requires a 1,000 ft buffer yard where structures border a non-forest district or residence and bars only buildings and parking areas from it, so outdoor equipment is not kept out of the buffer.
Maximum building height of 45 ft; rooftop equipment not addressed, Section 104-2A
Water study maps streams and pollution sources but no environmental assessment or riparian buffer, Section 104-2D
Phased energization may be a condition, but no phasing plan or new approval for expansion, Section 104-2E(1)(a)
Appendix A, Section 5 states a method (ANSI S1 and S12 practices with a calibrated Type 1 or Type 2 integrating meter), but the 50 dB day and 45 dB night Leq limits apply at residences, while the limits at the data center property line are 65, 60, and 55 dB (Appendix A, E(3), Table 1).
Octave-band pure tone limits from 16 Hz to 8,000 Hz; no dBC limit, Appendix A, E(3)(e), Table 2. Version 2.0 gives full credit to octave-band limits at 31.5, 63, and 125 Hz, which the stated range of bands covers, so the limits earn 2 points.
Sound modeling study with the application and as-built study six months after occupancy; none at building permit, Appendix A, E(7)
Routine testing may exceed limits by up to 20 dBA only in daytime hours, for one cumulative hour per seven days, Appendix A, E(4)(e)
ISO 2631-2 residential day criteria and 200 micrometers per second limit, with a vibration study; not a no-perceptible-vibration standard, Appendix A, E(6) to E(7).
Water feasibility study with safe yield and effects on wells within one mile; no limit on well use for cooling, Section 104-2D(2) to D(4)
Cooling method not required to be disclosed
Project water needs disclosed; users over 50,000 gallons per day must consider reuse water, Section 104-2D(1) and D(4)(a)
Study must identify how water will be recycled or released to water bodies, Section 104-2D(4)(g)
Utility documentation of available capacity and required upgrades; no electrical inspection, Section 104-2E(1).
Energy generation systems for normal operations included as an accessory use; on-site generation may be required as a condition, definitions and Section 104-2E(1)(c)
Required upgrades must be identified; a development agreement on cost responsibility may be required, Section 104-2E(1)
1,000-ft buffer yard, screening may use existing vegetation or a fence; planting not required, Section 104-2B and C
Screening required by existing vegetation, planting, or an opaque fence or wall, Section 104-2C
Construction noise exempt only during daytime hours with noise controls; no haul routes or road bond, Appendix A, E(4)(f)
As-built sound study six months after occupancy, with later studies at the township's option, Appendix A, E(7)(b)
As-built noise violation is a violation of the ordinance, Appendix A, E(7)(b)
Sound study by the applicant's acoustical expert; no township review stated
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Forest (F) District