Smith Township

Anti-Data Center Policies

Smith Township has enacted data-center rules requiring setbacks from homes or other protected places and minimum site sizes, increasing costs while still allowing approval. Available information is insufficient to assess the overall impact.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Smith Township
The rules were first adopted in Ordinance No. 2024-5 on November 12, 2024, and amended by Ordinance No. 2025-2 on August 18, 2025, and are codified in § 27-1103.11A of the township zoning code.Smith Township, Washington County — data-center ordinance / amendment 2025-2

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements18
  • Conditional use; no approval expiration, § 27-401.B, § 27-901.B

  • 75-ft height limit, § 27-1103.11A.A

  • 60 dBA at the property line under § 27-1201.B, applied by § 27-1103.11A.B

  • Pre-construction study and study 6 months after occupancy, § 27-1103.11A.B

  • Water will-serve letter and needs analysis; well impact study for water-cooled systems, § 27-1103.11A.B

  • Annual water usage reports; drought conservation measures but no drought plan, § 27-1103.11A.B

  • E-waste to approved disposal site; hazardous materials plan covers batteries and coolants, § 27-1103.11A.C

  • Documentation of adequate electric supply; no electrical inspection, § 27-1103.11A.B

  • Backup generators addressed, § 27-1103.11A.B

  • Utility connections underground; substations not screened, § 27-1103.11A.B

  • 50-ft buffer yard next to residential and agricultural lots, § 27-1103.11A.A

  • Ground equipment screened to 12 ft, roof to 10 ft; no acoustic screening, § 27-1103.11A.A

  • Emergency plan approved by fire department and coordinator, § 27-1103.11A.B

  • Hazardous materials plan; no storage setbacks or containment, § 27-1103.11A.C

  • Construction traffic coordination with schools only

  • 125% security and 180-day removal; no closure notice, § 27-1103.11A.E

  • Security updated every 3 years or at transfer, § 27-1103.11A.E

  • Annual water usage reports, § 27-1103.11A.B

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the C-D and I-1 districts

Sources

current law · Smith Township
The Board of Supervisors adopted Ordinance No. 2024-5, adding data center definitions and standards to the zoning chapter.Smith Township, Washington County — data-center ordinance / amendment 2024-5 (2024-11-12)

What this means

A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data