Loading map…

Slocum Township

Anti-Data Center Policies

Slocum Township’s enacted ordinance limits data-center noise, requires sound testing and setbacks from homes and other protected places, and sets water-supply requirements. Data centers may still be approved, but these rules add construction, review, and compliance costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Slocum Township
The current rules are in Ordinance No. 07-23-26, which the Board of Supervisors enacted on July 23, 2026.Slocum Township, Luzerne County — data-center ordinance (No. 07-23-26)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements23
  • I-1 limit of 35 ft or 2.5 stories; rooftop equipment not addressed, Section 4.06.5G

  • Noise study required for any proposed expansion; no stated triggers, Section 6.19C(4)

  • 50 dBA 24-hour average, with maximums of 65 dBA day and 55 dBA night at the property line, measured by a township-approved acoustical engineer in leaf-off season; limits above 50 and 45 dBA, Section 6.19C(1)-(3)

  • Noise study with the application and an as-built noise study after construction; no stated measurement method or full-load condition, Section 6.19C(4) and C(6)

  • Generator testing only 9:00 a.m. to 5:00 p.m. Monday to Friday, excluding federal holidays; no hours cap, Section 6.19E(1)

  • Generator vibration must be described in a statement of impact; no vibration standard, Section 6.19E(1)

  • Water feasibility study with hydrogeologic map, well inventory within 3,000 ft and safe yield for on-site sources; public water not required and no pump test, Section 6.19D(1)-(5)

  • Projected water quantity must be disclosed; cooling method not required, Section 6.19D(1)

  • Quarterly third-party reporting that water use is at or below the stated needs; no drought plan, Section 6.19D(7)

  • Study must identify how water will be recycled or released and its impact, for on-site sources, Section 6.19D(3)(ix)-(x)

  • Generator emissions must comply with federal, state and local rules, with DEP permits provided, Section 6.19E(3)-(4)

  • Batteries, fuel and refrigerants disposed of under state and federal law at decommissioning, Section 6.20D(2)

  • Will-serve letter from the public utility required; timing before a zoning permit not stated, Section 6.19G(1)

  • On-site generation limited to use when utility power is unavailable and to no more than 30 days, Section 6.19G(1)

  • Substations defined, approved as a conditional use, set back 300 ft and within the 50 ft screening buffer; undergrounding of lines only at township discretion, Sections 6.19A, B and G(2)

  • Applicant must show lines will not burden existing supply; no disclosure of upgrades or costs, Section 6.19G(2)

  • 50 ft continuous evergreen and deciduous buffer with year-round screening along all property lines, Section 6.19B

  • Only noise attenuation construction required; no facade standards, Section 6.19C(5)

  • Emergency response plan approved by the Supervisors and designated authorities, with 24-hour contacts; no annual update or walk-through, Section 6.19F(1)-(2)

  • Fuel tanks as accessory structures set back 250 ft from property lines and fuel storage must meet applicable law; no spill plan filed, Sections 6.19A and E(2)

  • Decommissioning plan with financial security for the full cost; removal begins within 1 year and ends within 18 months; security not at least 110 percent and no 6-month equipment removal, Section 6.20

  • Quarterly water use reports by a third party, Section 6.19D(7)

  • Water study by a firm chosen by the township and noise compliance by a township-approved engineer, both at the applicant's expense, Sections 6.19C(3) and D(5)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-1 Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data