Shrewsbury Township
Anti-Data Center Policies
Shrewsbury Township requires money to be set aside for eventual removal, noise limits and testing, and setbacks from homes and other protected places; data centers may still be approved, but these rules add costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Shrewsbury TownshipThe rules are in Ordinance No. 2026-05, which the Board of Supervisors adopted after a public hearing on August 5, 2026, amending Chapter 27, Zoning, of the township code.Shrewsbury Township, York County — data-center ordinance (No. 2026-05)
What this means
The measure imposes money set aside for eventual removal, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements32
Conditional use heard and decided by the Board of Supervisors, and approval expires if the use is not established or substantially completed within one year, § 27-2201.4.F and § 27-2204
Allowed only in the I district, which excludes the A district; no preserved farmland or agricultural security area bar, Appendix A
Base district height limit of § 27-1203.1, and accessory structures no taller than the principal building, § 27-1404 Data Center B
Environmental Impact Assessment required, and the Part 13 Critical Environmental Area and riparian buffer rules stated as applying, § 27-1404 Data Center R and X
Section 27-2201.4 requires another conditional use approval for any change not reflected on the approved site plan, other than minor changes, but it lists no specific triggers such as added generators, cooling, battery, or electrical demand and states no exemption for like-for-like replacement.
Single CNEL limit of 60 dBA at sensitive receptor properties and 70 dBA at other developed properties, § 27-1404 Data Center S.1
Peak particle velocity limit of 0.2 inches per second at the property line, with pre- and post-construction vibration studies within 1,000 ft of homes or sensitive receptors; not a no-perceptible standard, § 27-1404 Data Center T
Public water connection required with certification of supply and Susquehanna River Basin Commission approval; no explicit bar on wells or pump tests, § 27-1404 Data Center A.4
Reclaimed water for cooling encouraged only, § 27-1404 Data Center V.2
Water supply impacts must be evaluated in the impact analysis; no cap, reporting, or drought plan, § 27-1404 Data Center O.4
Section 27-1404 Data Center A.4(b) requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, as part of the conditional use showing that precedes the zoning permit (Section 27-2201.4).
Stormwater management plan required under base standards, § 27-1404 Data Center R.3
Air pollutant sources identified in the assessment; no generator emission standard, § 27-1404 Data Center R.1
Heat must not be perceptible beyond the property line and heat islands disclosed; no thermal plan, § 27-1404 Data Center F and O.5
Disposal of materials must comply with state and federal rules, § 27-1404 Data Center O.3
Utility capacity verification and a third-party final electrical inspection before occupancy; capacity not confirmed before approval, § 27-1404 Data Center H
Solar-ready roofs required and renewable energy encouraged; no energy usage plan, § 27-1404 Data Center V, W, and Y
Generation for normal operations excluded from accessory uses and backup generators addressed, § 27-202
Substations screened, placed to the side or rear, and all power lines buried, § 27-1404 Data Center K
Known impacts on electric rates or availability must be noted in the utility verification; no cost assignment, § 27-1404 Data Center H.1
Buffer yards along all property lines under the Chapter 12 landscaping rules, § 27-1404 Data Center N
Substations screened by an 8-ft wall or landscaping and service areas screened; no 12-ft or acoustic screening, § 27-1404 Data Center K.1 and N.1
Line-of-sight study for screening and site plan elevations; no renderings or study from historic sites, § 27-1404 Data Center A.2 and N.1, § 27-2201.1.B
Emergency Response Plan accepted by the fire department, in-building radio coverage, and 24-hour contact signage; no annual plan updates, § 27-1404 Data Center L and Q.1
Types and storage duration of materials must be disclosed; no storage setbacks or containment, § 27-1404 Data Center O.1
Section 27-1404 Data Center Q.1.F requires the emergency response plan to provide for annual fire safety inspections by a qualified professional, and H.5 requires a third-party final electrical inspection before occupancy, but no report to the municipal fire official and no deadline to correct deficiencies are stated.
Vehicle trips described only; no traffic study, § 27-1404 Data Center O.1
Construction vibration limited; no work hours, haul routes, or road bond, § 27-1404 Data Center T.1
Security of 110% of removal cost, but no closure notice or 6-month removal deadline, § 27-1404 Data Center Z.4
Plan and security updated every 5 years or at ownership change; no first-year update, § 27-1404 Data Center Z.3 and Z.4.C
One post-construction vibration study; noise monitors read by the Township at least annually, § 27-1404 Data Center S.4 and T.2
Application names the applicant and landowner, and the decommissioning plan names the responsible party; no end user, § 27-2201.1 and § 27-1404 Data Center Z.2.C(7)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial district
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data