Loading map…

City of Scranton

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for City of Scranton.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · City of Scranton
Would require data centers to receive city approval as conditional uses and meet limits and safeguards for size, noise, water use, environmental impacts, emergency response, and transparency.Proposed Scranton zoning ordinance amendment regulating data centers (introduced March 17, 2026; pending ordinance)

Timing

Ends
At the end of this year if not acted upon by the administration and Council

The source says the pending ordinances helped stop the clock on speculative data center projects and will expire under that condition. It does not give a specific calendar date or separately describe a formal moratorium.

People behind it

  • Proposed the tentative zoning changes related to data centers.

  • Introduced the proposed zoning changes.

Restrictions & requirementsHide restrictions & requirements11
  • Data centers would require conditional-use approval from the City; they would not be permitted as of right. Conditional use, not a right

  • The proposals would limit data centers’ size and scope to prevent hyperscale facilities, including limits on floor area. No numerical thresholds are specified in the source. Limited in size and scope

  • The proposals would restrict building heights; the source gives no specific height limits. Restricted building heights

  • The proposals would require minimum setbacks from existing homes, residential districts, parks, and other locations; no setback distances are specified. Minimum setbacks

  • The proposals would set maximum noise levels, with no numerical limits specified in the source. Maximum noise levels

  • The proposals would regulate supporting equipment, including generators and battery storage. Generators and battery storage

  • The proposals would require a minimum level of renewable energy; the source does not specify the level. Minimum renewable energy requirements

  • The proposals would require water-conservation techniques. Water conservation techniques

  • The proposals would require specialized training for the Scranton Fire Department and other personnel to respond to emergencies at data center sites. Specialized training

  • A data center proposal would have to include a decommissioning plan, an environmental and community impact analysis, a stormwater management site plan, and other reports and impact studies. Required plans and impact studies

  • The proposals would prohibit non-disclosure agreements and require transparency from both the developer and end-user. Non-disclosure agreements will be prohibited

Benefits & exceptionsHide benefits & exceptions1
  • Data centers may be proposed as conditional uses, subject to City approval; they are not allowed as a matter of right. “permitted as a conditional use, not a right”

Sources

pending · City of Scranton
Proposes creating a Technology and Energy Overlay district for data centers, with boundaries and site, design, power, safety, and permitting requirements to be set by the zoning amendments.Proposed Scranton zoning map amendment establishing a Technology and Energy Overlay District for data centers (introduced March 17, 2026; pending ordinance)

What this means

The measure would add meaningful review steps and requirements, including impact studies, operating plans, and rules for power systems, which could increase costs and delay projects (requirements listed in the proposal). The overlay’s exact boundaries are still undetermined, and the sources don’t show enough detail to conclude the rules would block most projects.

People behind it

  • The ordinances were proposed by her administration.

  • Introduced the two ordinances.

Restrictions & requirementsHide restrictions & requirements6
  • Data centers would be subject to conditional-use or special-exception review, rather than being allowed solely as an ordinary permitted use. conditional uses and uses by special exception

  • The measure requires standards for lot and building dimensions, as well as building location and orientation, architectural design, signs, screening, buffering, and landscaping. The provided sources do not state specific dimensional limits. lot and building dimensions

  • Applicants must submit letters, studies, reports, and operational plans, including required impact studies; the sources do not specify the studies’ scope or any thresholds. submissions of letters, studies, reports and operational plans

  • The measure sets requirements concerning deployment of operational and backup electric systems and power sources. The provided sources do not specify allowed sources, technical limits, or exceptions. deployment of operational and backup electric systems

  • Data centers must meet emergency-management requirements, including emergency protocols; the sources do not provide specific procedures or thresholds. emergency management protocols

  • The measure includes administration, enforcement, and permit-submission requirements, creating an additional regulatory process; the provided sources do not detail permit types, fees, or review timelines. submissions for permits

Benefits & exceptionsHide benefits & exceptions2
  • Creates a Technology and Energy Overlay district for data centers, establishing a zoning framework for them. The map says the overlay boundary is still to be determined, so it does not identify specific eligible sites. The overlay district’s boundaries are to be determined.

  • Provides for data-center zoning rules involving conditional uses and uses by special exception, creating formal application and review routes. The sources do not specify which locations or data-center types qualify, or guarantee approval. regulations for conditional uses and uses by special exception.

Sources

pending · Scranton City
City Council introduced both ordinances on March 17, 2026 and tabled them until a public hearing can be held, and they remained tabled on October 20, 2026, so the posted drafts, which list the amended sections without the full standards, have not been rated.Scranton City, Lackawanna County — proposed data-center ordinance (Proposed)

What this means

A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data