Salisbury Township
Anti-Data Center Policies
Salisbury Township’s enacted ordinance sets setbacks, minimum site sizes, and cooling and water-use limits for data centers. Projects can still seek approval, but these rules narrow where and how they can operate.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Salisbury TownshipThe current rules are in Ordinance No. 08-2026-686, which the Board of Commissioners adopted on August 27, 2026.Salisbury Township, Lehigh County — data-center ordinance (No. 08-2026-686)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements16
Section 27-402.1.TTT(5) bars a data center within 1,000 ft of any residence measured structure to structure, but the ordinance does not define structure or say that generators, cooling equipment, or substations are included.
Environmental impact study with conditional use application, § 27-402.1.TTT(3)
Must meet § 27-507 limits of 65 dBA day and 55 dBA night at homes, § 27-402.1.TTT(9)
Sound study with application and quarterly readings after opening; no building permit study
All water must come from a public water utility, so wells are not used, § 27-402.1.TTT(7)
Closed-loop cooling required; evaporative cooling not expressly restricted, § 27-402.1.TTT(11)
Annual water use reporting; no drought plan, § 27-402.1.TTT(14)
Impact study must address stormwater rate, flow, and quality, § 27-402.1.TTT(3)(a)
Power company will serve letter with application; no third-party inspection, § 27-402.1.TTT(6).
On-site and backup power facilities must be disclosed, § 27-402.1.TTT(3)(d)
Must not impair public power delivery; upgrade costs not assigned
50-ft buffer yard with evergreen screening, § 27-402.1.TTT(2)
Emergency preparedness plan filed and updated annually, § 27-402.1.TTT(12)
Must show no substantial risk to first responders; no training requirement
Parking study only; no traffic study
Annual reports on water, wastewater, and power, with quarterly sound readings, § 27-402.1.TTT(14)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Industrial district
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data