Ryan Township’s enacted rules require cooling and water-use measures, technical studies, utility checks and noise testing for data centers, increasing review and compliance costs while still allowing approval.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Ryan TownshipThe rules are in Ordinance No. 2026-3, which the signed copy dates to February 2026 and which the Shenandoah Sentinel reported as adopted on February 9, 2026.Ryan Township, Schuylkill County — data-center ordinance (No. 2026-3)
What this means
The measure imposes cooling and water-use rules, technical studies and utility checks and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements19
Scale must be described; no cap, § 6.1003.k
Barred on parcels adjoining residential parcels in the R-1, R-2, and R-3 districts, but no setback distance, Section 2
Environmental impacts and mitigation measures must be described, § 6.1003.r
75 dBA weekday daytime and 57 dBA night and weekend at the property line, § 6.1003.n
Sound study with the application and as-built study six months after occupancy; none at building permit, § 6.1003.n and o
Exempt generator testing limited to monthly daytime hours; no hours cap, § 6.1003.n
Water feasibility study for on-site wells unless air or closed-loop cooled; no pump tests, § 6.1003.s
Type of cooling system must be described, § 6.1003.l
Analysis of water quantity and frequency required unless air or closed-loop cooled, § 6.1003.s.i
Description of wastewater impacts and how water will be disposed of or released, § 6.1003.r and s.iii
Interconnection or other agreement from the electric provider showing capacity; no third-party inspection, § 6.1003.m.
Substations counted as accessory facilities and screened by the buffer yard when visible, § 3.222.2 and § 6.1001
50-ft planted buffer yard where accessory facilities, parking, or loading are visible, § 6.1001
Visible accessory facilities screened by the buffer yard and a 5-ft berm within 250 ft; no acoustic screening, § 6.1001 and § 6.1002
Fire lanes subject to fire marshal review; no emergency plan, § 6.1003.b
Applicant must provide training to the fire department on request, § 6.1003.c
Section 6.1003.q requires a traffic study by a professional traffic engineer in every case but states no scope, so construction traffic and the study area are not addressed.
One as-built sound study after occupancy, § 6.1003.o
Sound study by an independent acoustical expert, but no township review at applicant cost, § 6.1003.n
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the I-1 and I-2 districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data