Ross Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Ross Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Ross TownshipAt its October 5, 2026 committee meeting the Board of Commissioners discussed possible additions to the draft, including sensitive receptor setbacks, grid impact studies, and diesel generator rules, and agreed to continue reviewing it, and as of October 19, 2026 the draft had not been formally introduced and no hearing date had been set.Ross Township, Allegheny County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements20
67 dBA day and 57 dBA night at the property line, 906.5.M(5)(a)
Section 906.5.M(5)(a) requires preliminary, interim, and as-built sound studies using ANSI S1.4 meters, but the as-built study six months after occupancy is not required at full operating load.
Generator noise evaluated; no testing limits, 906.5.M(5)(b)
Vibration study showing none perceptible past the property line, 906.5.M(5)(c).
Water feasibility study for nonpublic sources; no well bar, 906.5.M(6)(b)
Projected average and peak demand in feasibility study, 906.5.M(6)(b)
Section 906.5.M(6)(d) requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by DEP, as part of the conditional use showing that precedes the zoning permit.
Disposal of electronic waste, batteries, and cooling fluids at decommissioning; no recycling, 906.5.M(8)(b)
Utility certification of capacity; no electrical inspection, 906.5.M(7)(a).
Generation for normal operations is a separate use with its own approval, 906.5.M(7)(b).
Known electric rate impacts must be noted; no cost assignment, 906.5.M(7)(a)
100-ft setback only; no planted buffer
Plan accepted by fire and EMS chiefs; no annual update, radio, or contacts, 906.5.M(3)(a)
Plan must ensure responder training; no funding, 906.5.M(3)(a)
Annual fire safety inspections, 906.5.M(3)(a)
Access roads evaluated in plan only
Bond of cost plus 15%, but removal within 18 months, 906.5.M(8)
Bond reviewed at least every 5 years; no first-year update, 906.5.M(8)(c)
Sound studies every two years and semi-annual water testing, 906.5.M(5)(a) and (6)(e)
Section 906.5.M(5)(a) lets the Township order an independent sound study by an acoustic expert of its choosing at the applicant's cost during the conditional use and building permit stages, not in land development review.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed conditional use in the I-1 district