Rockefeller Township

Anti-Data Center Policies

Rockefeller Township requires data centers to meet setbacks, minimum site sizes, and noise limits with sound testing, which can sharply restrict suitable sites and project designs despite an approval route.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Rockefeller Township
The Board of Supervisors adopted Ordinance 2026-01, effective on adoption, on June 23, 2026, and the township secretary provided a signed copy by email on October 19, 2026.Rockefeller Township, Northumberland County — data-center ordinance (No. 2026-01)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements25
  • Special exception; no approval expiration, § 27-403.M use table and (2)(a)

  • 50 ft maximum building height; rooftop equipment not addressed, (1)(e)

  • 1,000 ft from any stream, wetland, or floodplain and environmental impact study; no steep slope standard, (1)(c) and (14)

  • Subsection (2)(d) requires a new sound study and a new special exception for any addition or alteration to the data center or its accessory uses, including any change or upgrade of the cooling system or generators, but no electrical demand trigger is stated and like-for-like replacement is not exempt.

  • Subsection (2) sets 45 dBA on weekday days and 40 dBA at night and on weekends at the property line, measured with ANSI S1.4 sound level meters and generally accepted methodology.

  • Subsection (2)(a) to (c) require preliminary, interim, and as-built sound studies using ANSI S1.4 meters, with the as-built study six months after occupancy, but the as-built study measures normal operations and is not required at full operating load.

  • Water feasibility study for nonpublic water and river basin commission approval above thresholds; no pump test or well limit, (5)

  • Type of cooling system must be described in the environmental impact study, (14)(a)

  • Projected water demand disclosed in the water feasibility study, (5)(a)

  • Subsection (6) requires the applicant to show that disposal of domestic and cooling or industrial wastewater has been provided and approved by the wastewater service provider and regulatory authority, but it does not state that the approval must be in hand before the zoning permit.

  • Stormwater impacts evaluated in the environmental impact study only; base standards not stated as applying, (14)(c)

  • Decommissioning plan covers disposal or recycling of materials, and batteries, fuel, and refrigerants disposed of under state and federal law, (16)(a) and (e)

  • Utility capacity certification and interconnection agreements with the special exception application; no electrical inspection, (7).

  • Fire suppression must comply with NFPA standards; no battery-specific standard, (12)

  • Analysis of ratepayer impacts required, (7)

  • 50-ft planted buffer with fencing around the perimeter, (10)

  • Lighting study with a 0.1 footcandle limit at residential property and full-cutoff fixtures, (4)

  • 10-ft fence and dense evergreen screen around the data center; no acoustic screening, (10)

  • Emergency response plan reviewed and accepted by the fire department; no annual updates, radio coverage, or contact signage, (8)

  • Annual fire safety inspections paid for by the operator, (8)(e)

  • Traffic impacts evaluated in the environmental impact study for every application; no formal traffic impact study, (14)(c)

  • Financial security for the full cost, completion within 18 months after decommissioning begins; no closure notice, (16)(b)-(c)

  • Security reviewed and adjusted bi-annually; no first-year update stated, (16)(b)

  • One as-built sound study six months after occupancy, (2)(c)

  • Noise exceedance is a violation of the zoning ordinance, (2)(c)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Special exception in the CI district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data