Loading map…

Robeson Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Robeson Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Robeson Township
The current draft is dated September 22, 2026 and has no ordinance number, and the October 5, 2026 Planning Commission agenda listed the ordinance for final review.Robeson Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements29
  • Allowed only in the GI district, so not in agricultural districts; preserved farmland and agricultural security areas not addressed, § 732

  • 50 ft maximum building height, § 732.A(1)(g)

  • Environmental and Community Impact Analysis covering floodplains, riparian buffers, streams, wetlands, and steep slopes; no buffer width set, § 732.B(1)

  • Any increase in noise, more than 10% added peak electrical demand, more water use, or a larger building footprint requires an amended conditional use with a new hearing, Section 5.

  • 55 dBA day and 52 dBA night at sensitive receptor lot lines and 57 dBA at other lot lines, § 732.B(8)(a)(iii)

  • Section 732.B(8)(a)(i) bars sound more than 3 dBA above the pre-construction ambient level from a 30-day baseline study that uses the quietest night hour, but the baseline is not an L90 measure and no floor is set below which the cap does not apply.

  • Single limit of 65 dBC at residential lot lines, § 732.B(8)(c)

  • 30-day baseline study before approval and as-built audits at 30 days and 6 months after opening; no building permit study, § 732.B(8)(e)

  • Section 732.B(5)(b)(ii) limits routine generator testing to 1 hour per generator per month or as otherwise required by law, and Section 732.B(8)(a)(iiii) limits testing to 10:00 a.m. to 4:00 p.m. Monday through Friday.

  • Groundwater, wells, and surface water barred as a water source and public water required with a supplier letter, § 732.B(7)(a) and (b)

  • Supplier must certify capacity for projected water demands; no cap, reporting, or drought plan, § 732.B(7)(b)

  • Detailed wastewater discharge plan with volume and treatment; cooling discharge not specified, § 732.B(7)(c)

  • Stormwater management plan showing compliance with the township stormwater ordinance, § 732.B(1)(b)

  • EPA Tier 4 Final generators with SCR and particulate filters; no annual emissions testing or reports, § 732.B(5)(b)(iii) and § 732.B(20)(g)

  • Decommissioning plan for equipment removal and disposal or recycling, with batteries and refrigerants disposed under state and federal law; servers not named, § 732.C(1) and (4)

  • Utility impact report on energy supply, and the applicant should provide an interconnection agreement showing capacity; no third-party electrical inspection, § 732.B(5)(b) and § 732.B(6)

  • Utility impact report on energy supply and alternative energy options, and solar-ready roofs; on-site renewable generation not required, § 732.B(5)

  • Substations integrated into the architecture or concealed by landscaping where visible from residences, and utility services underground unless the utility requires otherwise, § 732.A(6) and § 732.B(6)

  • 60-ft-wide, 8-ft-high earthen berm or preserved natural buffer, with width subject to Board approval, § 732.B(17)

  • Substations concealed where visible from residences and generators in sound-attenuated enclosures; no height standard for all equipment, § 732.B(6) and § 732.B(5)(b)(iii)

  • Impact analysis must address visual obstacles; no renderings or viewpoints required, § 732.B(1)(a)

  • Records of materials stored and hazardous waste disposal required; no storage setbacks or containment, § 732.B(3) and (10)

  • Section 732.B(4) requires a Traffic Impact Study for every data center, with the study area set by the Township Engineer and Zoning Officer, but the study covers trip generation for all hours of operation and does not cover construction traffic.

  • Secondary emergency access required; road classification not addressed, § 732.B(18)

  • Security of at least 125% of decommissioning costs and removal within 6 months after end of useful life; no required notice of closure, § 732.C(2) and (3)

  • Section 732.C(3) requires the decommissioning cost estimate to be submitted after the first year of operation and every fifth year thereafter, and requires the owner to post and maintain Decommissioning Funds equal to the Net Decommissioning Costs, so the security follows each updated estimate.

  • Annual third-party noise compliance report and quarterly summaries posted on the township website, § 732.B(8)(e)(iii)

  • Noncompliant equipment deactivated when hard caps are exceeded by more than 5 dB, with a mitigation plan due within 48 hours, § 732.B(8)(e)(ii).

  • Section 732.B(8)(g) has a Township-appointed independent expert funded from the applicant's escrow resolve conflicting noise measurements, but the ordinance does not require the applicant to pay for consultant review of its studies in land development review.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the GI District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data