Rice Township

Anti-Data Center Policies

Rice Township’s enacted ordinance requires setbacks from homes and other protected places, minimum site sizes, and cooling and water-use rules, substantially limiting workable sites and project designs despite an approval route.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Rice Township
The rules are in Ordinance 1-2026, which the Board of Supervisors adopted on March 3, 2026.Rice Township, Luzerne County — data-center ordinance (No. 1-2026)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements26
  • Section 508.5(a).D measures the 1,000 ft residential setback from data centers, BESS, and accessory structures, but Section 508.5(a).E allows substations at 500 ft and Section 508.5(a).F allows loading areas at 500 ft.

  • Environmental Impact Statement required, Supplemental J

  • Section 508.5(a).G requires one mile between data centers on adjoining properties, and the Section 3 definition treats accessory uses on contiguous lots under common ownership or control as part of one data center, with Section 508.5(a).A counting commonly owned tracts as one site and Supplemental O applying the noise limit to all data centers on the property combined.

  • Phases under the master plan need no further approval; major modifications need new review, Supplemental H and I

  • 65 dBA day and 55 dBA night at the property line, Supplemental O

  • Sound study before the final certificate of occupancy, updated after occupancy; none before construction, Supplemental O

  • Backup generators may not run 8 p.m. to 8 a.m. except emergencies; no hours cap, Supplemental Q.c

  • Vibration study showing none past the property boundary, Supplemental J.c.e.

  • Water provider letter certifying capacity; no well study, Supplemental J.c.a

  • Closed-loop cooling required; evaporative cooling not expressly restricted, Supplemental M

  • Supplemental N requires the applicant to show that disposal of domestic and cooling wastewater has been provided for and approved by the SEO or DEP, and Supplemental E requires third-party permits only before the building permit.

  • Tier IV diesel generators; no annual emissions testing, Supplemental Q.c

  • Utility letters certifying capacity with the land development application; no electrical inspection, Supplemental J.c.

  • Substations 500 ft from homes and all new lines underground; substations not screened or placed, Sections 508.5(a).E and Supplemental Q

  • Needed substation and infrastructure expansion must be disclosed, Supplemental J.c.d

  • Dense planted buffer yard within the setback; width not stated, Supplemental F.e

  • Supplemental F.a requires two of five facade elements every 150 horizontal feet and F.c requires 30 percent fenestration, but changes in material and color are only options among the elements and the standard is not tied to walls visible from roads or homes.

  • Ground and rooftop equipment screened with noise-absorbing screens; no 12-ft height, Supplemental F.d

  • Emergency response plan accepted by the fire department with posted contacts and quarterly drills; no annual update or radio coverage, Supplemental G

  • Plan must ensure responder training; no funding, Supplemental G.a.e

  • Fuel storage must meet fire codes only, Supplemental Q.d

  • Annual fire safety inspections; no electrical inspection, Supplemental G.a.h

  • Supplemental B.a requires a traffic impact study with every land development application covering daily operational traffic and emergency access.

  • Annual renewable energy reporting and drain tile inspections every three years, Supplemental L and Q.b

  • Supplemental R.c requires the Township to rescind the zoning permit for radiation violations consistent with applicable law, and Section 7 assigns enforcement to the Zoning Officer.

  • Supplemental R.a and R.b let the Township obtain radiological surveys at the applicant's expense, and Supplemental O.c lets it retain its own sound study without assigning the cost.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-1 Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data