Rapho Township’s enacted rules require cooling and water-use controls, noise limits and testing, and setbacks from homes and other protected places; data centers may still be approved, but compliance and review can add costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Rapho Township
The rules are in Ordinance 2026-4, which the Board of Supervisors adopted on July 16, 2026, and which is codified in Section 350-605B of the zoning ordinance.Rapho Township, Lancaster County — data-center ordinance (No. 2026-4)

What this means

The measure imposes cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements20
  • Same 200-ft and 300-ft setbacks from community uses; below 1,000 ft, § 350-605B(8)

  • Floodplain exclusion only; no riparian buffer or impact assessment, § 350-605B(4)

  • Section 350-605B(1) requires a conditional use application to establish or expand a data center, but it lists no expansion triggers such as added building area, generators, cooling, battery, substation capacity, or electrical demand, and does not exempt like-for-like replacement.

  • 60 dBA day and 50 dBA night at residential, agricultural, and mixed-use lot lines, § 350-605B(6)

  • Generator mufflers may be required; no testing limits, § 350-605B(6)(b)

  • Public water required and wells barred for consumption and cooling, § 350-605B(14)(a)

  • Water cooling must be closed loop and cooling type disclosed; evaporative cooling not restricted, § 350-605B(1)(b) and (14)(b)

  • Projected daily water demand disclosed, § 350-605B(1)(b)

  • Discharge volumes and locations disclosed and public sewer required, § 350-605B(1)(b) and (13)

  • EPA Tier 4 generators with annual testing and reports, § 350-605B(2)

  • Thermal impact mitigation plan including waste heat recovery, § 350-605B(1)(g).

  • Electronic waste plan for servers, batteries, and hazardous materials; refrigerants not named, § 350-605B(1)(f)

  • Public water capacity documentation only; no electric utility confirmation

  • Energy management plan; renewable energy encouraged but not required, § 350-605B(1)(c) and (3)

  • Accessory substations screened, § 350-605B(11)

  • Energy storage must meet fire safety standards, § 350-605B(5)

  • 100-ft buffer with landscaping next to residential and agricultural uses, § 350-605B(10).

  • Ground equipment enclosed or noise-absorbing screening and rooftop equipment screened on all sides; no 12-ft standard, § 350-605B(11)

  • Emergency plan sent to emergency providers, an emergency contact designated, and annual consultation; no annual update or radio coverage, § 350-605B(1)(d) and (5)

  • Annual generator emissions reports only

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial Zone