Ransom Township
Anti-Data Center Policies
Ransom Township’s enacted ordinance sets setbacks, minimum site sizes, and cooling and water-use limits for data centers. Projects can still receive approval, but these requirements narrow where and how they can operate.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Ransom TownshipThe Board of Supervisors enacted it as Ordinance No. 3 of 2026 on October 5, 2026, according to the signed copy posted on the township's Local Ordinances page.Ransom Township, Lackawanna County — data-center ordinance (No. 3 of 2026)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements29
Conditional use; no approval expiration
Section 4.2.B caps all data center buildings and accessory uses at 40 feet including rooftop mechanical, cooling, and ventilation equipment, but the height limit for other principal buildings in the district is not in the ordinance text.
100-ft riparian buffer each side, wider on slopes and at wetlands
Article VIII requires a new conditional use approval for added building area, computing capacity, electrical demand, water use, generators, cooling, battery storage, substations, or material operational changes, but it does not exempt like-for-like replacement.
55 dBA day and 45 dBA night at residential receptors
70 dBC day and 60 dBC night limits
Study with application and verification within 180 days of opening
Numeric vibration standards with study; not a property line bar
Public water required where available; no pump tests
Air-cooled, closed-loop, or equivalent water-conserving cooling
Section 4.4 requires a Water Resource Assessment with estimated daily and annual demand and drought response measures, and Section 7.1.B lets the Township require annual compliance reports and water usage verification, but the drought measures are not tied to state, basin commission, or supplier declarations and reporting is not required to be metered.
Cooling wastewater analysis and sewer capacity certification before approval
General removal and disposal of hazardous materials at decommissioning
Utility capacity confirmation; no third-party electrical inspection.
Energy usage plan; renewables not required
Substations at side or rear and screened; lines of 34.5 kV or less buried
Section 4.4 requires documentation from the utility addressing available capacity, transmission and distribution impacts, and required infrastructure improvements, and makes the applicant responsible for their cost, but no cost estimate, tariff terms, or executed service agreement before the zoning permit is required.
Continuous vegetative buffer; no 100-ft width
Section 4.1.B requires buildings visible from public roads or Sensitive Receptor properties to vary building materials, color, texture, articulation, and facade treatment, but sets no measurable standard such as a maximum wall length or offset depth.
Equipment screened on all sides; no 12-ft or acoustic standard
Building elevations required; no visual impact study
Emergency plan reviewed by fire departments; no radio coverage rule
Fuel storage setbacks and secondary containment.
Periodic inspections; no annual fire or third-party electrical inspection
Construction hours, routes, and road protection; no road bond
110% security and notice; removal within 12 months, not 6
Section 9.1.E(2) requires the decommissioning estimate to be updated after the first year of operation and every 5 years, and Section 9.1.F(3) requires the 110% security to be adjusted whenever an updated estimate shows more is needed.
Annual compliance reports with noise and water verification
Section 5.2.B lets the Township have its selected consultants review any submitted study at the applicant's expense, but this review is part of the conditional use application, not land development review.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the M-1 and M-2 districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data