Pocopson Township

Anti-Data Center Policies

Pocopson Township’s enacted ordinance requires data centers to meet setbacks, minimum site sizes, and cooling and water-use rules. Approval remains possible, but these limits narrow where and how projects can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Pocopson Township
The current rules are in Ordinance No. 1 of 2026, which the Board of Supervisors adopted on July 27, 2026.Pocopson Township, Chester County — data-center ordinance (No. 1-2026)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements27
  • LI Limited Industrial district only, § 250-43.B(10)

  • Conditional use before Board of Supervisors; no approval expiration, § 250-49.D

  • Base height limit with rooftop equipment included; accessory 20 ft, § 250-49.D(6).

  • 55 dBA day, 45 dBA night at residential receptors, Table 2

  • Section 250-49.D, Table 6, treats an increase of 3 dBA or more above the baseline ambient level documented before construction as a violation, measured with a Type 1 or Type 2 ANSI meter, but the baseline is not defined as L90 and no floor is set below which the cap does not apply.

  • 70 dBC day, 60 dBC night, Table 3

  • Studies with application and within 180 days of operation, § 250-49.D(11)

  • 65 VdB human perception limit, with study, § 250-49.D(11)(c)

  • Public water required; no groundwater or surface water for cooling, § 250-49.D(12)

  • Section 250-49.D(12)(e) requires air-cooled or closed-loop water circulation systems and Section 250-49.D(12)(d) bars groundwater and surface withdrawals for cooling, but evaporative systems are not expressly barred or limited to a stated water-use rate shown to meet the noise limits.

  • Usage estimates and drought response plan; no cap or reporting, § 250-49.D(12)

  • Cooling discharge analysis with application; no discharge to streams, § 250-49.D(13).

  • EPA Tier 4 diesel generators with annual testing reports, § 250-49.D(14)(g)

  • Electronic waste plan for servers, batteries, hazardous materials, § 250-49.D(18).

  • Energy usage plan; solar only suggested, § 250-49.D(10)

  • On-site generation a separate principal use with own approval, § 250-49.D(14)(a).

  • Substations at side or rear and screened; lines 34.5 kV and below buried, § 250-49.D(14)

  • 100-ft buffer yard next to Sensitive Receptors and residential districts, § 250-49.D(9)(c).

  • Equipment screened on all sides; no height or acoustic standard, § 250-49.D(7)

  • Elevations and renderings required, § 250-49.D(8)

  • Plan accepted by fire department, 24-hour signage, radio coverage; no annual update, § 250-49.D(15)

  • Annual fire safety inspections, § 250-49.D(15)(a)

  • Section 250-49.D(16) requires a traffic impact study with every conditional use application covering access, road capacities, and off-site flow on the Township network and surrounding areas, but it does not cover construction traffic or set a study area reaching the nearest arterial or interchange.

  • Construction plan for times and access; no road bond, § 250-49.D(17)

  • Security for full cost, closure notice, completion within 18 months, § 250-49.D(19)

  • One post-construction noise study; annual generator reports, § 250-49.D(11), (14)

  • Traffic consultant chosen from Township list; cost not assigned, § 250-49.D(16)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the LI Limited Industrial district