Plumstead Township

Anti-Data Center Policies

Plumstead Township’s enacted ordinance requires data centers to meet noise limits, undergo sound testing, observe setbacks, and meet minimum site-size requirements, increasing costs while still allowing approval.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Plumstead Township
The rules are in Ordinance 2026-02, which the Board of Supervisors adopted on June 10, 2026 and sent back to the township and county planning commissions to fine-tune, and no revised amendment had been adopted or advertised as of the August 26, 2026 Board minutes.Plumstead Township, Bucks County — data-center ordinance (No. 2026-02)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements13
  • Conditional use, Art. III; no approval expiration

  • 200 ft building setback from all property lines, H20.C

  • Use H20.I limits data centers to 35 ft with roof projections such as heating and cooling units counted in the height, but the district height limit for other principal buildings is not in the amendment text read.

  • Site plan required for each phase, H20.N and O

  • Section 27-2310 applied, single 46 dBA limit at residential lines, H20.D

  • Testing and emergency sound exempt, no hours limits, H20.D

  • Projected water consumption assessed, H20.F.a

  • Only third-party NPDES permit copies, H20.O

  • On-site generation needs Fire Marshal approval and safety plan, H20.M

  • Use H20.F requires a capacity assessment for electricity and water and, where it identifies a detrimental impact or threshold of insufficient capacity, the system improvements the applicant must provide at its own expense.

  • Safety plan for on-site generation, recertified annually, H20.M

  • Annual Fire Marshal site inspection, H20.M

  • Second emergency access required, H20.H

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the LI Light Industrial and Q Quarry districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data