Plains Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Plains Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Plains TownshipProposes limiting data centers to conditional-use approval in Plains Township’s industrial zone and requiring measures for noise, water use, emergency response, screening, and decommissioning.Plains Township data center zoning amendment (proposed; conditional use in Industrial Zone)
What this means
The proposal creates a path for data centers in the existing Industrial Zone, by conditional use only. But a 10-acre minimum, large setbacks, and required noise, water, and emergency plans would make projects harder and costlier (draft standards). Overall, it modestly enables development while imposing substantial conditions.
People behind it
- Plains Township Board of Commissioners
The draft ordinance identifies the Board as seeking to adopt the zoning amendment; the article says the Board would draft and advertise a revised data-center amendment.
Restrictions & requirementsHide restrictions & requirements17
The draft allows data centers only in the I-1 Industrial District, and only by conditional use; it does not permit them by right. The article reports that the earlier overlay proposal was rejected and a revised amendment was planned. Conditional-use-only zoning Revised amendment plan
A data center lot must be at least 10 acres. Minimum lot area
Structures generally must be at least 500 feet from residential or conservation-zoned lots and sensitive receptors, and 100 feet from other lot lines. Data-center substations and BESS have the same 500-foot and 100-foot separation requirements; loading and similar areas must be 100 feet from residential or conservation-zoned lots or sensitive receptors. Setback requirements
Projects must provide a landscape buffer at least 25 feet wide, with specified native plantings, and screen mechanical equipment near residential or conservation-zoned lots or sensitive receptors. Buffer and screening standards
A conditional-use application must include a broad set of materials, including site plans, an energy usage plan, emergency plans, utility approval, sound and visual-impact studies, transportation and hazardous-materials plans, a heat-mitigation plan, an operations manual, and a decommissioning plan. The application is not complete until required materials are submitted. Application documents
Applicants must submit a professional-engineer-certified energy usage plan describing expected electrical demand, supply sources, backup power, cooling, and considered efficiency and renewable-energy options; the Township may require supplemental studies or amended plans. Energy usage plan
Noise is limited to 60 dBA on weekdays from 8 a.m. to 5 p.m. and 50 dBA during weekday evenings and nights, weekends, and holidays; noise also may not exceed ambient levels by more than 10 dBA. Sound studies are required at application, building-permit review, six months after occupancy, and annually thereafter. Noise limits and study schedule
Unless non-water-reliant technology is used, cooling must use a closed-loop system with water-conservation measures. The project must have public water service, document that adequate service is available, and obtain approval for wastewater disposal; a drought contingency plan is required if the Township declares a drought-related water shortage. Water and cooling requirements
Generators must have mufflers and enclosures, meet noise limits, and be Tier IV or higher diesel-certified. Portable or backup generators generally may not run from 5 p.m. to 8 a.m., except during declared emergencies or when deemed essential for safety and security. Generator standards and operating hours
New on-site electric transmission and distribution lines generally must be underground; lines rated at 249 kV or less must be underground, with a written waiver request allowed if underground installation is technically infeasible. Underground power-line requirement
Applicants must provide an emergency response plan for review by the Township Fire Department, EMS, and mutual-aid municipalities, and address responder training and access to specialized emergency equipment. Radio coverage for responders and a security plan prepared in consultation with police are also required. Emergency-plan requirements
The draft requires an environmental impact statement with the conditional-use application and compliance with specified environmental, lighting, and building-performance standards. Building facades facing roads or residences must incorporate at least two design elements every 150 horizontal feet, and fluorescent or metallic exterior wall colors are prohibited. Environmental and facade standards
Before occupancy, the owner must provide financial security for decommissioning of at least 110% of its estimated cost. The estimate and security must be updated every five years and after a substantial equipment change or tenancy change, with increased security required if costs rise. Decommissioning security
The draft also requires financial security sufficient to cover certain costs or liabilities incurred by the Township if the applicant fails to provide required documentation, reports, studies, or improvements. General financial security
A change in tenant or occupancy that alters approved operating characteristics requires Township review before the new tenant starts operating; the Township may require additional permits, approvals, or plan amendments. Tenant occupancy review
The applicant must submit an affidavit acknowledging that a Host Community Agreement will be included during land development. The Township may require a Community Benefits Package affidavit as part of conditional-use approval, and the agreement may address operational commitments beyond the ordinance. Host-community and community-benefit provisions
Parking is capped at 1.5 spaces per peak-hour employee. Parking limit
Benefits & exceptionsHide benefits & exceptions6
Data centers may be proposed as conditional uses in the Industrial (I-1) District, subject to approval and the ordinance’s requirements. Data Center
Data-center accessory uses may be located on the same lot or lots as the center; listed examples include generators, substations, utility lines, cooling and water facilities, and security structures. Data Center Accessory Use
Energy-generation systems serving only the data center during normal operations are treated as accessory uses and reviewed with the data-center application. Battery storage may also be proposed as an accessory use, with safety measures and operational protocols included in the energy plan. Generation for off-site users or the grid remains a separate principal use subject to applicable zoning requirements. Energy generation systems
The ordinance provides for electric substations serving data centers, including on-site substations subject to location, screening, and setback rules: generally 500 feet from residential or conservation-zoned lots and sensitive receptors, and 100 feet from other lot lines. Substations serving a Data Center
Rooftop solar and on-site windmills are encouraged to reduce data-center power consumption; windmills must be under 120 feet and outside required setbacks. Renewable energy sources
The ordinance allows generators as data-center equipment and accessory uses for backup power, subject to noise requirements and Tier IV or greater diesel certification; portable or backup generators generally may not run from 5 p.m. to 8 a.m., except in specified emergencies or when deemed essential for safety and security. All generators
Sources
pending · Plains TownshipThe Board of Commissioners rejected the earlier Energy and Technology Overlay at an October 22, 2026 special meeting and the township then posted this text as a pending ordinance, with no ordinance number, hearing date, or adoption yet recorded.Plains Township, Luzerne County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements38
Conditional use (Section 508.3.I and Section 716); the only start deadline, one year after approval, applies to battery storage under Section 717.9.A, so there is no lapse provision for data centers.
Schools, day care centers, hospitals, and parks are sensitive receptors protected by the 500-ft structure setback, Section 202 and Section 706.2.A(1), which is less than 1,000 ft.
The 65-ft limit of the September 9, 2026 draft is gone; Section 706.2.A applies the I-1 dimensional rules of Section 508.4 (not reproduced in the draft), accessory structures may not exceed the principal building, and rooftop equipment must be screened to its own height, Section 716.1.A, but rooftop equipment is neither counted in height nor limited to 10 ft above the roof.
Environmental Impact Statement required with the conditional use application, Section 706.1.I(4)[b]; wetlands, floodplains, and steep slopes avoided only to the maximum extent practicable, with no riparian buffer width, Section 706.1.I(1)[a].
Data center campus defined as two or more data centers on one parcel planned and operated as an integrated facility, Section 202; no separation distance between campuses or combined performance rule.
Section 706.1.L(2) requires re-application when an occupancy changes electrical or water demand, backup power, cooling, traffic, noise, or hazardous materials, and Section 716.1.F requires a new conditional use for an increase in the approved power rating, but the Township decides case by case whether new approval is needed and there is no exemption for like-for-like replacement.
60 dBA weekdays 8 a.m. to 5 p.m. and 50 dBA at night, weekends, and holidays at the lot line, with ANSI S1.4-2014 meters, Section 706.1.D(1) and D(2); both limits are above 50 and 45 dBA.
Low-frequency limit of 15 dB above the applicable dBA limit, which is 75 dBC day and 65 dBC night, Section 706.1.D(1)[b].
Preliminary study with the conditional use application, interim study at building permit, as-built study six months after occupancy, and annual monitoring, all under the Section 706.1.D(2) method, Section 706.1.D(3), but no study is required at full operating load.
Backup generators may not run between 5:00 p.m. and 8:00 a.m. except in declared emergencies, Section 716.1.B(6); testing is not limited to weekdays and there is no hours cap.
Vibration study with each sound study showing vibration not perceptible beyond the lot line, Section 706.1.D(5); no numeric limit or measurement method.
Public water service required with the provider's certification of adequate service, Section 706.1.E(2)[a]; no rule for on-site wells or hydrogeologic study.
Closed-loop cooling with water conservation measures unless non-water cooling is used, Section 706.1.E(1); evaporative systems are not limited to a stated water-use rate or tied to the noise limits.
Drought contingency plan required only if the Township declares a water shortage, Section 706.1.E(2)[d]; no metered use reporting.
Wastewater disposal, including cooling water, must be shown as provided and approved by the Sewage Enforcement Officer or DEP, Section 706.1.E(2)[c], and documentation of off-site disposal of industrial wastewater is a required submission, Section 706.2.B(1)h, but the text does not require the approvals to be in hand before the zoning permit.
Township erosion, sedimentation, and water pollution standards stated as applying, Section 706.1.I(5); fuel storage designed to prevent spills only where applicable and green roofs encouraged, Section 706.1.I(2)[e] and I(3); no added treatment or containment for runoff from fuel, generator, or transformer areas.
All generators must be Tier IV or greater diesel certified, Section 716.1.B(5); no annual emissions testing or reports.
Heat Mitigation Plan is a required conditional use document, Section 716.2, but the draft states its contents only for battery storage (Section 717.7.E) and requires no modeled property line temperature effects.
Hazardous Materials and Electronic Waste Plan required, Section 716.2, and batteries, fuel, and refrigerants disposed of under state and federal law at decommissioning, Section 706.1.M(2); no on-site storage plan or disposal contract.
A PUC certificate, utility will-serve letter, or federal letter of interconnection must be filed with the application, which is not complete without it, Section 706.2.B(1)i and B(3), and Section 716.2, so written utility confirmation precedes conditional use approval and the zoning permit.
Engineer-certified Energy Usage Plan stating annual and peak demand, supply sources, storage, backup power, and cooling energy, with an evaluation of efficiency and renewable options, Section 716.1.B(2); peak demand is not stated by phase and rooftop solar is only encouraged, Section 716.1.B(7).
Section 716.1.B(1) treats generation serving only the data center as an accessory use reviewed with the data center application, while Section 719 calls a power generation facility serving another principal use a separate principal use; the two provisions conflict and no generation-specific noise or emission standards are set.
Substations placed to the side or rear of the principal building, 500 ft from residential and conservation district lots and sensitive receptors, and screened by year-round opaque landscaping or an 8-ft wall, Section 716.1.B(3); on-site lines of 249 kV or less buried, Section 716.1.B(4).
NFPA 855 compliance with fire suppression and thermal runaway mitigation, Section 706.1.H(2), and BESS set back 500 ft from residential and conservation district lots and sensitive receptors, Section 716.1.A; no setback from wells, large-scale fire test data, or hazard mitigation analysis.
Minimum 25-ft landscape buffer with native plantings at stated densities, Section 716.1.A and Section 706.1.A, and replacement of credited vegetation, Section 706.1.C(2)[c][iv]; less than 100 ft.
Rooftop equipment screened on all four sides to at least its own height, Section 716.1.A and Section 716.1.C(2), and sound attenuation where a sound study recommends it, Section 706.1.D(3)[b], but ground equipment must be enclosed or screened only within 500 ft of residential lots and sensitive receptors or 100 ft of other lot lines, Section 706.1.C(1).
Visual Impact Study and Typical Building Elevations required, Section 716.2; no renderings and no stated viewpoints from roads or historic sites.
Emergency Response Plan reviewed and accepted by the township fire department and EMS, with 24-hour contacts posted at the entrance, Section 706.1.F; no annual update or annual walk-through.
Emergency Response Plan must include procedures for training township responders before operation and thereafter as necessary, Section 706.1.F(2)[g]; no annual training and no duty to supply specialized equipment at no cost.
Hazardous Materials and Electronic Waste Plan required, Section 716.2, and bulk fuel storage must meet federal, state, and insurance rules, Section 716.1.B(8); no storage setbacks from wells or streams and no spill response plan filed with the Township.
Emergency Response Plan must provide procedures for annual fire safety inspections by a qualified professional, Section 706.1.F(2)[f]; no report to the municipal fire official or correction deadline.
Transportation Study listed as a required conditional use document, Section 716.2, with no stated scope for construction traffic or the study area.
Only one access location from a public right-of-way required, Section 706.2.B(1)d; no arterial or collector access and no secondary emergency access.
Security of at least 110 percent of decommissioning cost before the occupancy permit, Section 706.1.M(3), and removal standards for abandoned facilities, Section 706.1.M(4); no recorded agreement, no 6-month removal deadline, and no 2-year reuse rule for buildings.
New estimate every 5 years and at a substantial change in equipment or tenancy, with security increased to match, Section 706.1.M(3); no first-year update.
Annual sound monitoring after the as-built study, Section 706.1.D(3), and compliance checks every two years after Final Plan approval, Section 706.1.D(7).
A noise violation found by the as-built study is a violation of the ordinance, Section 706.1.D(3)[a], and the Township may seek injunctive relief and liens for unpaid decommissioning costs, Section 706.2.B(4); no stated suspension or revocation grounds for data centers.
Owner or operator named on the posted 24-hour contact sign, Section 706.1.F(1)[c], and new tenants must be reported for Township review before operating, Section 716.1.E; the end user need not be named before approval.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the I-1 Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data