Anti-Data Center Policies

Plainfield Township requires data centers to keep setbacks from homes and other protected places and meet noise limits with sound testing. Approval remains possible, but these limits narrow where projects can be built and how they can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Plainfield Township
The rules are in Ordinance No. 432, which the Supervisors adopted after a public hearing on April 8, 2026.Plainfield Township, Northampton County — data-center ordinance (No. 432)

What this means

The measure imposes setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements16
  • District height (50 ft in I-BP) incl. rooftop equipment, § 27-320.5.C.1(3)(a).

  • 67 dBA day, 57 dBA night at property line, § 27-320.5.C.1(6)(a)

  • The ordinance adding Section 27-320.5 requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters (subsection F(1)), with the as-built study six months after the certificate of occupancy, but does not require the as-built study at full operating load.

  • Water feasibility study for nonpublic supply; no pump tests, § 27-320.5.C.1(7)(b)

  • Projected water demand disclosed in feasibility study, § 27-320.5.C.1(7)(b)

  • The ordinance adding Section 27-320.5 requires the applicant to demonstrate adequate wastewater disposal approved by the Sewage Enforcement Officer or DEP (subsection G(4)), but does not require that approval before the zoning permit.

  • Utility certification of capacity; no electrical inspection, § 27-320.5.C.1(8)(a).

  • On-site generation is a separate use with its own approval, § 27-320.5.C.1(8)(b).

  • Substations are accessory uses; power equipment within 300 ft enclosed or screened, § 27-202 and § 27-320.5.C.1(5)

  • Only rate impacts must be noted, § 27-320.5.C.1(8)(a)

  • 100-ft planted buffer next to residential districts and sensitive receptors, § 27-320.5.C.1(4).

  • Equipment within 300 ft enclosed or screened; no 12-ft standard, § 27-320.5.C.1(5)(a)

  • ERP must ensure responder training; no funding, § 27-320.5.C.1(9)(a)4

  • Annual fire safety inspections; no electrical inspection, § 27-320.5.C.1(9)(a)5

  • One as-built sound study after opening, § 27-320.5.C.1(6)(a)3

  • As-built noise exceedance is a violation; general enforcement, § 27-320.5.C.1(6)(a)3

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the GC and I-BP districts

Sources