Anti-Data Center Policies

Peters Township’s enacted ordinance limits data-center noise and requires sound testing. Projects can still be approved, but these rules add construction, compliance, or review costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Peters Township
The Supervisors enacted the ordinance on June 23, 2026, and the ordinance number on the posted scanned copy is handwritten and not clearly legible.Peters Township, Franklin County — data-center ordinance (Enacted June 23, 2026 (Number Not Legible))

What this means

The measure imposes noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements21
  • 500 ft setback when adjacent to a property with a residential structure, Article IV

  • 55 dBA day and 45 dBA night at the property line, Article XVI

  • Article XVI.A limits sound to no more than 10 dBA above pre-development ambient levels, with ceilings of 55 dBA by day and 45 dBA at night at the property line, measured with ANSI S1.4-2014 meters.

  • Octave or one-third octave band frequency analysis required; no dBC limit, Article XVI

  • Article XVI.A to C require preliminary, interim, and as-built sound studies using ANSI S1.4-2014 meters, with anticipated levels reported for all equipment running and the as-built study six months after occupancy.

  • Preliminary sound study must evaluate vibration impacts; no vibration standard, Article XVI

  • Water feasibility study and hydrogeologic study with pump tests for wells; no bar on wells for cooling, Articles XIV and XV

  • Peak demand including cooling use must be calculated, Article XIV

  • Article XVII requires the applicant to demonstrate that adequate means of wastewater disposal, including cooling and industrial wastewater, have been provided for and approved by the Sewage Enforcement Officer or PA DEP.

  • Utility approval of the service application required, Article X.

  • Three rows of vegetative screening along all boundaries; no buffer width, Article VI

  • Full cutoff shielded fixtures with a 0.1 footcandle limit at the property line, Article VIII

  • Principal facades must use at least two specified design elements, Article V.

  • Vegetative screening to form a 10 ft visual barrier along boundaries, Article VI

  • Emergency response plan reviewed by the fire department; no annual update or radio coverage rule, Article XII

  • Owner must ensure first responders receive system-specific training, Article XII

  • 100 ft setback for hazardous material tanks and spill containment required, Article IX.

  • Annual fire safety inspections; no third-party electrical inspection, Article XII

  • Article XIII requires every applicant to submit a traffic impact study addressing daily operational traffic and emergency response access.

  • As-built sound study six months after occupancy, Article XVI

  • Township engineer and acoustical expert review studies; cost not assigned, Articles XIV and XVI