Pequea Township
Anti-Data Center Policies
Pequea Township’s enacted rules require data centers to meet cooling and water-use standards, noise limits and sound testing, and setbacks from homes and other protected places, increasing costs while still allowing approval.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Pequea TownshipThe rules are in Ordinance No. 229-2026, which the Board of Supervisors adopted on August 19, 2026 and which was recorded with the Lancaster County Recorder of Deeds on August 28, 2026.Pequea Township, Lancaster County — data-center ordinance (No. 229-2026)
What this means
The measure imposes cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements28
Conditional use before the Board of Supervisors; no approval expiration found, § 1502.51(a)
Underlying district height applies; rooftop equipment screened to 10 ft, § 1502.51(h), (i)(1).
Section 1502.51(b) and (c) require multi-phase data center developments to be shown on a Development Plan under the subdivision and land development ordinance, but no phase states its electrical demand and no new approval is required for added capacity.
60 dBA day and 55 dBA night, or ambient if greater, at the property line, § 1502.51(k)(1)
Post-construction mitigation must keep levels at preliminary ambient, but the main limit allows the greater of the limit or ambient, § 1502.51(k)(1), (k)(5)
70 dBC day and 65 dBC night, above the 2-point level, § 1502.51(k)(1)
Pre-construction study with the application and as-built study six months after occupancy; none at building permit, § 1502.51(k)(4)-(5)
Generator testing weekdays 9:00 a.m. to 5:00 p.m.; no hours cap, § 1502.51(s)(10)
Vibration studies before and after construction; none perceptible beyond property lines, § 1502.51(k)(6)-(7).
Public water required with a will-serve letter; no hydrogeologic study, § 1502.51(q)(1)
Air-cooled or closed-loop cooling required; cooling towers still listed as accessory uses, § 1502.51(q)(2), (s)(6)
Public sewer will-serve letter and DEP approval for surface discharge; no cooling discharge plan, § 1502.51(q)(1), (q)(3)
Diesel generators must meet EPA Tier 4, with annual air quality testing reports, § 1502.51(m), (s)(10)
Decommissioning plan for removal and recycling of servers, batteries, hazardous materials, and e-waste, § 1502.51(u)(2).
Interconnection agreement confirming capacity; no electrical inspection, § 1502.51(p)(1).
Statement of total energy needed; no on-site renewable requirement, § 1502.51(p)(2)
All electric lines underground and ground equipment screened; no substation placement rule, § 1502.51(i)(1), (p)(5)
Assessment of utility rate impacts with required mitigation of rate increases; no grid upgrade cost rule, § 1502.51(p)(3)-(4)
100-ft buffer yard with vegetative screening next to residential uses, § 1502.51(j).
Low-reflective or earth tone colors required; fluorescent and metallic colors barred, § 1502.51(o)(3).
Ground equipment screened on all sides to 12 ft, with acoustic barriers next to sensitive receptors, § 1502.51(i)(1), (k)(3).
Emergency Response Plan reviewed by the Fire Chief with a 24-hour contact; no annual update or radio coverage, § 1502.51(r)(1)
Emergency plan must provide first-responder training; cost not assigned, § 1502.51(r)(1)(d)
Annual fire safety inspections; no electrical inspection, § 1502.51(r)(1)(e)
Decommissioning plan with financial assurance; no 110% amount or 6-month removal, § 1502.51(u)
Security reviewed every three years and before any transfer, § 1502.51(u)(8)
One as-built noise and vibration study after opening; continuous monitoring without reports, § 1502.51(k)(5), (k)(7)
At least one virtual public meeting before Planning Commission or Zoning Hearing Board review, § 1502.51(v)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Commercial and Industrial districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data