Penn Township

Anti-Data Center Policies

Penn Township requires data centers to keep setbacks from homes and other protected places, limit and test noise, and set aside money for eventual removal. An approval route remains, but these limits substantially narrow where projects can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Penn Township
The current rules are in Zoning Ordinance 2022-01, which the Supervisors revised on February 18, 2026 to add data centers.Penn Township, Snyder County — data-center ordinance (No. 2022-01 (As Amended 2026))

What this means

The measure imposes setbacks from homes or other protected places, noise limits and sound testing and money set aside for eventual removal. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements26
  • Section 1136.7.b requires the data center and its accessories, which the Section 301 definition says include generators, substations, and cooling towers, to be at least 1,000 ft from any existing residential or occupied structure.

  • Environmental study on features and wildlife required, § 1136.5.c

  • Single 45 dBA limit at the property line, § 1136.8.a

  • Octave-band limit of 60 dB for 20 to 300 Hz applied by § 409.3 and § 1304.C; no dBC limit

  • Section 1136.8.a to d requires preliminary, interim, and as-built studies using ANSI S1.4 meters and generally accepted methodology, with the as-built study six months after the certificate of occupancy.

  • Generators must meet the noise limit; no testing hours or cap, § 1136.8.e

  • Vibration study showing none perceptible past the property line, § 1136.9.b.

  • Water feasibility study for nonpublic sources; no bar on wells or pump tests, § 1136.1.b

  • Closed loop to the maximum extent feasible; evaporative cooling not restricted, § 1136.1.e

  • Projected water needs disclosed and SRBC approval above thresholds, § 1136.1.a to c

  • Study must identify how water is recycled or released; no approved discharge plan, § 1136.1.b

  • Heat and exhaust may not be perceptible at the property line; no thermal plan, § 1136.5.d

  • Decommissioning plan must address e-waste and hazardous material removal, § 1136.10.e

  • Utility capacity certification and third-party electrical inspection before occupancy, § 1136.2.c and d

  • Section 1136.2.b treats generation serving the data center in normal operation as a separate use approved under the regulations for that use and caps it at 45 dBA, but the setbacks and emission standards of that use are not in the text read.

  • Substations counted as accessory uses and screened, § 301 and § 1136.7.a

  • Data center and accessories screened from occupied structures; equipment not in front, § 1136.4 and § 1136.7.a

  • Plan accepted by the fire department with 24-hour contact signage; no annual update or radio coverage, § 1136.6

  • Plan must ensure responder training; no funding, § 1136.6.a

  • Section 1136.6.a requires the emergency response plan to provide for annual fire safety inspections by a qualified professional on behalf of the data center, and Section 1136.2.d requires a third-party electrical inspection before occupancy.

  • Section 1136.5.a requires a traffic impact study in every case but states nothing about its scope.

  • Section 1136.10.a to c requires immediate notice of cessation, removal within six months, and 110 percent security, but no recorded agreement and no two-year reuse rule for buildings.

  • Section 1136.10.d requires cost estimates after the first year of operation and every fifth year, and states that the financial security shall be updated every five years.

  • One as-built sound study and radiological survey after opening, § 1136.8.d and § 1136.3.b

  • Sections 1136.8.d and 1136.3.c and d allow the zoning permit to be revoked or rescinded for noise or radiation violations, but no notice and hearing is required and Sections 616.1 and 617.2 of the MPC are not cited.

  • Township surveys and engineer at applicant expense only for radiation and decommissioning, § 1136.3 and § 1136.10.d

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data