Penn Forest Township
Anti-Data Center Policies
Penn Forest Township limits building height and requires minimum site sizes for data centers, increasing construction and review costs, though projects can still be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Penn Forest TownshipThe current rules are in Ordinance No. 1-2026, which the Board of Supervisors adopted on March 2, 2026.Penn Forest Township, Carbon County — data-center ordinance (No. 1-2026)
What this means
The measure imposes building-height limits and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements31
Conditional use before the Board of Supervisors, § 240-23; approval rescinded if permits are not secured within 12 months, § 240-17G
Setbacks set only on the Appendix A map, not stated in the text; 100-ft buffer is not a setback, § 240-40.2C(7)
Environmental impact assessment required, § 240-40.2D(11) and § 240-68
Section 240-67, applied by Section 240-40.2D(4), sets 5-minute LAeq limits of 50 dBA day and 45 dBA night on residential receiving properties, measured with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994 by an acoustical engineer.
60 dBC day and 55 dBC night in residential zones, § 240-67
Modeling study with the application and as-built study after opening; none at building permit, § 240-68
Section 240-40.2D(6)(d) limits generator operation outside outages to 30 minutes a day between 9:00 a.m. and 5:00 p.m., Monday through Friday, with no allowance for longer tests required by code.
ISO residential vibration limit with a vibration study, not a no-perceptible standard, § 240-67 and § 240-68.
Water feasibility study with 48-hour pump test for nonpublic water; no bar on cooling wells, § 240-40.2D(5)(c) and § 240-68
Closed-loop cooling only encouraged; no disclosure required, § 240-40.2D(5)(c)
Projected demand addressed in feasibility study; no cap or drought plan, § 240-68
Generator emissions must meet federal, state, and local rules, § 240-40.2D(6)(e)
EIA must identify thermal impacts and heat islands, § 240-68
Removal and recycling plan for servers and batteries; refrigerants not named, § 240-40.2D(10)
Utility capacity certification with the application; no third-party electrical inspection, § 240-40.2D(6)(b).
Power use documentation required; renewables not required, § 240-40.2D(6)(a)
Generators and power sources included as accessory uses, § 240-26 definition
Power equipment enclosed or screened; lines buried only where feasible, § 240-40.2D(3) and D(6)(c)
Rate and availability impacts must be disclosed; upgrade costs not assigned, § 240-40.2D(6)(a) and (b)
100-ft planted buffer yard along all property lines, § 240-40.2D(2).
Fully shielded with a 0.1 footcandle limit at the property line, § 240-48 applied by § 240-40.2D(14)
Section 240-40.2D(8)(c) and (d) require at least three of five measurable facade elements and low-reflective earth tone colors, but a change of materials is only one optional element, so articulation, materials, and color are not all required.
Equipment fully enclosed or screened; no 12-ft or acoustic screen standard, § 240-40.2D(3)
Plan reviewed by fire department with radio coverage and 24-hour contacts; no annual updates or posting, § 240-40.2D(7)
Applicant must provide and fund responder training, § 240-40.2D(7)(f).
Hazards and combustible storage must be identified; no storage setbacks or containment, § 240-40.2D(7)(c) and § 240-68
Annual fire safety inspections; no third-party electrical inspection, § 240-40.2D(7)(c)
Adequate emergency access required; additional access only if the Board requires it, § 240-40.2D(7)(a)
110% security and closure notice, but 12 months to remove, § 240-40.2D(15)
Section 240-40.2D(15)(a)[5] and [6] require the estimate to be updated after the first year and every fifth year, and the financial security to be reset at each interval to 110 percent of the updated estimate.
One as-built sound study after opening, § 240-68
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the DC Data Center Overlay District
Sources