Peach Bottom Township
Anti-Data Center Policies
Peach Bottom Township’s enacted rules require large sites, setbacks, and approval, narrowing where data centers can be built. Another description calls an enacted ordinance proposed and lists additional costly operating requirements, including river water, studies, fees, and decommissioning security.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Peach Bottom TownshipSets out proposed zoning, environmental, safety, noise, water-use, and decommissioning requirements for data centers, which would need special-exception approval to operate in Peach Bottom Township.Peach Bottom Township Proposed Data Center Zoning Ordinance, Section 339B
What this means
If enacted, this would make data centers substantially harder to build: projects would need at least 50 acres, large setbacks and buffers, and special-exception approval. Operating them would also bring costly requirements, including river-sourced cooling water, ongoing studies, a yearly $100,000 fee, and financial security for decommissioning; it allows data centers, but the practical burden is severe.
People behind it
- Peach Bottom Township Board of Supervisors
The draft ordinance states that the Board desires to amend the zoning ordinance and identifies the Board as the body to enact it.
Restrictions & requirementsHide restrictions & requirements29
A data center is allowed only by special exception, requiring an application and review by the Zoning Hearing Board. The draft requires studies and assessments before the special-exception hearing. “Data Center (see Section 339B)”
The parcel must be at least 50 acres, and the combined area of the principal building, electrical substation, and data-center equipment may not exceed 60% of the parcel. “minimum of fifty (50) acres”
Data-center buildings may not exceed 60 feet in height. Principal buildings, accessory structures, and substations must be at least 200 feet from property lines and, if the property abuts a sensitive receptor, at least 1,000 feet from its boundary. Parking has separate setbacks of 50 feet from public-road rights-of-way and 100 feet from property lines. “maximum building height”
The site must provide at least one parking space per employee on the largest shift, plus three visitor spaces, and at least one loading space. Loading spaces may be on only one façade of the principal building. “1 parking space per employee”
Noise limits apply at property boundaries: 58 dBA CNEL at a property containing a sensitive receptor and 70 dBA at a developed property without one. The draft requires sound studies before the hearing, during permitting, before occupancy, annually after occupancy, and whenever requested by the Township; violations must be remedied. Brief sound may exceed the limits by up to 10 dBA for a cumulative minute per hour, and specified emergency, snow-removal, and road-repair sounds are exempt. “shall not exceed 58 dBA”
Construction and operation may not cause ground vibration above 0.2 inches per second peak particle velocity at the nearest property line or an off-site structure. For sites within 1,000 feet of a residence, residential zone, or sensitive receptor, pre- and post-construction vibration studies are required; the Township may also require monitoring. “0.2 inches per second”
Air, dust, smoke, glare, exhaust, heat, or humidity from the use or its activities must not be perceptible at or beyond the property line. “not perceptible at or beyond the property line”
Electrical equipment must be housed in a grounded, fire-rated enclosure designed to resist an internal electrical fire for at least 30 minutes, with automatic fire baffles. Applicants must demonstrate compliance with relevant NFPA standards and submit the application to the nearest Fire Chief for review and comment. Proposed battery storage must meet NFPA 855 or similar standards and have battery-specific fire suppression. “resist an internal electrical fire for at least 30 minutes”
The owner must provide specialized firefighting equipment and training required by the local fire company, hold annual meetings with emergency responders, provide updated site maps, and conduct annual response-team training. “conducting annual training”
Electromagnetic fields may not exceed 2 milligauss above ambient background at the nearest property line or a point accessible to the public. The draft also requires corrective action for Township-verified electromagnetic interference complaints. “shall not exceed 2 milligauss (mG)”
Before a certificate of completion or occupancy, applicants must obtain written service-provider verification of adequate utility capacity and cooling-system adequacy, and written confirmation that electrical work passed a third-party final inspection. “passed a third-party final inspection”
Lighting must meet shielding and aiming requirements; illumination may not exceed 0.1 footcandle on residential property or 0.5 initial footcandle on non-residential property. LED color temperature is capped at 3000K, luminaires at 20 feet, and roof-mounted light poles are prohibited. Parking and traffic-way lighting must be extinguished within half an hour after closing, subject to specified reduced-lighting or motion-sensor options for continued nighttime activity. “shall at no time exceed 0.1 footcandle”
Security fences may not exceed 10 feet above ground. “shall not exceed ten (10) feet in height”
Electrical substations require year-round opaque landscaping or a screen wall at least 10 feet high. On-site substations must be beside or behind the principal building, screened from public view, and outside required front yards. On-site power lines of 34.5 kV or less must be buried. “shall be buried”
Each operation must post 24-hour emergency contact signage at its access entrance and provide the required contact information, including updates, to the Township Secretary. “24-hour emergency contact signage”
Loading docks, truck entries, and truck drive aisles must be oriented away from abutting sensitive receptors, located away from nearby sensitive receptors, and screened. “oriented away from abutting Sensitive Receptors”
The site must provide buffer yards and screening along property boundaries, except at entrances and exits. Ground-mounted equipment must be fully screened and may not be placed in required setbacks; rooftop equipment must be screened. Enhanced berm-and-planting buffers apply by building footprint: 300, 400, or 500 feet along public-street frontages and specified nearby residential or sensitive uses, depending on whether the combined principal-building footprint is under 100,000 square feet, 100,000–250,000 square feet, or over 250,000 square feet. Other property lines generally require 50-foot buffers. “minimum 500-foot buffer yard”
Well water may be used only for potable purposes, not equipment cooling or other uses; water used for cooling or maintenance must come directly from the Susquehanna River. Before the special-exception hearing, the applicant must submit a water-feasibility study. The draft also requires SRBC review and approval for withdrawals of at least 100,000 gallons per day over a 30-day average or consumptive use of at least 20,000 gallons per day over a 30-day average, as well as applicable discharge permits and ongoing compliance. “water must be sourced directly from the Susquehanna River”
If the data center’s negligent or intentional conduct causes nearby residents’ aquifer water to fail applicable standards, or specified contaminants are found at unsafe levels in a private well, the owner must provide potable water to affected residents until standards are met. “shall provide potable water to the affected residents”
A pre-hearing environmental impact assessment is required, addressing topics including air emissions, nuisance impacts, emergency services, sewage, solid waste, schools, municipal revenues and expenses, stormwater, protected resources, alternatives, and mitigation. “An Environmental Impact Assessment shall be performed”
Removal of trees and hedgerows at least six inches in diameter at breast height must be minimized; in no case may more than 50% of existing qualifying tree masses, lines, hedgerows, or individual trees be removed. “more than 50%”
A Pennsylvania Natural Heritage Program (PNDI) receipt dated within two years of the application and any required agency clearance letters must be submitted; the applicant must follow required measures to avoid, minimize, or mitigate species and habitat impacts. “dated within two (2) years”
Sites containing, adjoining, or within 150 feet of specified waterways, wetlands, floodplains, ponds, or reservoirs must protect, convert, or establish a riparian forest buffer. The minimum is 100 feet on each side, with additional width based on slope and certain wetlands; earth disturbance, development, and material storage are prohibited in the buffer, which must be protected in perpetuity. “minimum of 100 feet on each side”
Roofs must be solar-ready, and uncovered roof areas must use roofing material with a solar reflective index of at least 78. For buildings over 250,000 square feet, rooftop solar panels must be installed and operated before occupancy to supply as much operating power as feasible. “All building roofs shall be solar-ready”
A data center must use the best available cooling technology as determined at site-plan approval, meeting stated criteria for energy efficiency, potable-water use, commercial feasibility, and environmental impact. “shall utilize the best available cooling technology”
The owner must agree to pay an annual Township impact fee of $100,000 per data center during commercial operation, with the first full payment due upon issuance of a certificate of occupancy. The amount adjusts annually after 2026 according to the specified CPI-U measure. “annual sum of $100,000”
For a violation, the Township may require corrective action by a stated deadline and, if it is not corrected, pursue compliance measures including injunctive relief or monetary fines. If legal action is needed, the Township may recover attorneys’ fees, costs, and expenses. “injunctive relief and/or monetary fines”
Operations discontinued for 20 continuous months may trigger decommissioning if the owner does not show good-faith efforts to resume within a reasonable time. The applicant must submit a decommissioning plan with the application and update it every five years after the first occupancy certificate. “continuous period of twenty (20) months”
The owner must post financial security equal to 110% of estimated decommissioning costs, without deducting equipment salvage value, and keep it in force for the facility’s life, adjusting it every five years or sooner if requested. Decommissioning generally requires removal of structures and equipment, utility disconnection, hazardous-material disposal, and site restoration; the Township may use the security to complete the work if the owner fails to do so. “equal 110% of the estimated decommissioning cost”
Benefits & exceptionsHide benefits & exceptions5
Data centers are added as a use eligible for special-exception approval, providing a zoning pathway to seek approval; they are not permitted by right. Data Center (see Section 339B)
The ordinance includes associated infrastructure within the data-center use, including accessory structures, substations, equipment, and utility infrastructure on the same parcel or, as part of the data center, on off-site easements or parcels. Accessory uses may include cooling and water facilities, utility lines, and generators for temporary outages, but not energy generation for normal operations. The term Data Center, as used within Section 339B
A data center’s dedicated electrical substation may be on the same or adjacent site, or immediately across a road right-of-way. specifically for Data Center users
Cooling water may be sourced directly from the Susquehanna River; well water is allowed for potable uses only. the water must be sourced directly from the Susquehanna River
The stated noise limits do not apply to a sensitive receptor established adjacent to a data center after its certificate of occupancy is issued. established adjacent to the Data Center after the date of issuance
Sources
current law · Peach Bottom TownshipThe rules are in Ordinance No. 2026-02, which the Board of Supervisors enacted on August 5, 2026.Peach Bottom Township, York County — data-center ordinance (No. 2026-02)
What this means
The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements26
60-ft height limit
100-ft riparian forest buffer widened on slopes, no wetland widening, § 339B.W; impact assessment, § 339B.R
Single 58 dBA CNEL limit at Sensitive Receptor boundary, § 339B.F
Low-frequency band in required sound studies; no dBC limit, § 339B.F
Section 339B.F(1)(f) requires preliminary, interim, post-construction, and annual sound studies by an INCE Board Certified engineer covering low, mid, and high frequencies, reviewed by a Township-selected engineer, but names no measurement method or standard and does not require full operating load.
0.2 in/s PPV limit with pre- and post-construction studies
Wells barred for cooling and feasibility study with well sampling; no pump tests, § 339B.O
Best available cooling technology required, § 339B.Y
Water needs disclosed in feasibility study and SRBC review, § 339B.O
PAG-03 or NPDES discharge permit required, § 339B.O(3)
Stormwater management plan required, § 339B.R
Emission sources identified only; no generator emission standard
Hazardous materials disposed of by law at decommissioning, § 339B.AA
Utility capacity letter and third-party electrical inspection before occupancy, § 339B.H(6)
ISO 50001 energy report and rooftop solar on buildings over 250,000 sq ft, § 339B.R and § 339B.X.
Substations screened 10 ft at side or rear; lines 34.5 kV and below buried, § 339B.K
300 to 500 ft planted buffer with berms near Sensitive Receptors.
Ground equipment behind opaque wall; rooftop screened on four sides, § 339B.N
Section 339B.H(3) makes the owner responsible for any specialized firefighting equipment and training the Delta-Cardiff Volunteer Fire Company needs, including annual training with responders, but does not require training before occupancy or that the equipment be kept on site.
Third-party electrical inspection before occupancy, § 339B.H(6)
Trip description only; no traffic study
110% security; no closure notice or removal deadline, § 339B.AA
Plan and security updated every 5 years, § 339B.AA
Annual sound studies after opening, § 339B.F
Fines, injunctive relief, and recovery of legal fees, § 339B.Z.
Post-construction sound study reviewed by Township-selected engineer, cost not assigned, § 339B.F
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data