Paradise Township
Anti-Data Center Policies
Paradise township requires noise limits and sound testing, setbacks from homes and other protected places, and water-supply measures for data centers, increasing costs while still allowing approval.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Paradise TownshipThe rules are in Ordinance No. 2026-02, which the Board of Supervisors adopted on August 10, 2026, after a public hearing.Paradise Township, York County — data-center ordinance (No. 2026-02)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements26
Added to the Section 27-902(B) lot table, so limited to that district, § 27-902(B); district name not stated in the ordinance
Buffer widths scale with footprint, but no footprint or megawatt cap, § 27-1348.M.3
40 ft maximum building height; rooftop equipment screened and set back but not capped at 10 ft, § 27-1348.B and M.2.b
Riparian forest buffer at least 100 ft on each side, wider on slopes of 10 percent or more and by 25 ft at wetlands, § 27-1348.U
Single 24-hour CNEL limit of 60 dBA at sensitive receptors and 70 dBA at other developed property, § 27-1348.F.1
Noise tests mentioned but no required sound studies, § 27-1348.F.2
Connection to public water required; wells and pump tests not addressed, § 27-1348.A.4
Reclaimed water for cooling only encouraged, § 27-1348.R.2.d
Impact analysis must evaluate effects on water supply; no cap or reporting, § 27-1348.N.4.b
Public sewer required and sewage impacts evaluated; no cooling discharge plan, § 27-1348.A.4 and N.4.c
Stormwater management plan required in the environmental assessment, § 27-1348.Q.3
Emission sources and best practices identified in the assessment; no generator standard, § 27-1348.Q.1
Heat and heat island impacts must not be perceptible at the property line and must be described, § 27-1348.G and N.5
Disposal of materials must comply with state and federal rules, § 27-1348.N.3
Utility verification of capacity before occupancy, not before approval, and third-party final electrical inspection before occupancy, § 27-1348.I
Rooftop solar required on buildings over 400,000 sq ft before occupancy; no energy usage plan, § 27-1348.V.3
Energy generation for normal operations excluded from the data center accessory use; no separate approval stated, § 27-202
Substations placed at the side or rear and screened, and on-site lines of 34.5 kV and below buried, § 27-1348.J
100-ft to 300-ft planted buffer along lines within 500 ft of residential properties or zones, by footprint, § 27-1348.M.3.
General placement and harmonious color guidance, with rooftop screening of complementary materials, § 27-1348.A, M.2.b, and O
Ground equipment behind an opaque wall and rooftop equipment screened on all four sides, with a 12-ft planted screen; no acoustic screening, § 27-1348.M
Line-of-sight study for service area screening; no visual impact study with renderings, § 27-1348.M.1
24-hour emergency contact signage and in-building radio coverage; no emergency plan, § 27-1348.K and P
Applicant must coordinate with the emergency management coordinator on radio coverage; fire department donations only optional, § 27-1348.P and W
Third-party final electrical inspection before occupancy; no annual inspections, § 27-1348.I
Vehicle trips described in the impact analysis; no traffic study, § 27-1348.N.1
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the Commercial (C) District