Borough of Palmerton

Anti-Data Center Policies

Palmerton Borough requires data centers to keep setbacks from homes and other protected places and meet noise limits, including sound testing; approval remains possible, but these restrictions narrow suitable sites.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Palmerton Borough
The current rules are in Ordinance 790, which Borough Council adopted on June 25, 2026.Palmerton Borough, Carbon County — data-center ordinance (No. 790)

What this means

The measure imposes setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements24
  • 500-ft setback from agricultural lands as sensitive receptors; no preserved farmland bar, § 202 and § 402.A.3

  • Environmental impact assessment required, § 402.L

  • 67 dBA day and 61 dBA night at the property line, § 402.D

  • Modeling with the application and an as-built study; none at building permit, § 402.D

  • Backup generators barred from 8 p.m. to 8 a.m. except emergencies; no hours cap, § 402.F.4

  • ISO 2631-2 residential vibration limit with a sound and vibration study, § 402.D

  • Water feasibility study with aquifer pump tests; no bar on wells for cooling, § 402.E

  • Closed-loop cooling allowed but not required, and cooling use described, § 402.E

  • Quarterly withdrawal reports; no drought response plan, § 402.E.10

  • Section 402.E.11 of Ordinance 790 requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, with the developer paying for any needed sewer upgrades, but does not state that the approval must be in hand before the zoning permit.

  • Stormwater plan with the environmental impact statement, § 402.L

  • Discharge temperature must be described; no reuse review, § 402.E.4

  • Decommissioning plan for removing equipment and recycling, with batteries and refrigerants disposed of lawfully, § 402.J.

  • Utility certification of capacity; no electrical inspection, § 402.F.

  • On-site generation is a separate use needing its own approval, § 402.F.2.

  • Known rate and availability impacts must be noted, § 402.F.1

  • 50-ft planted buffer next to residential districts and sensitive receptors, § 402.B

  • Fully shielded fixtures with a 0.25 footcandle limit at lot lines, § 402.M

  • Facade design elements, offsets, and earth-tone colors required, § 402.H.

  • Equipment within 500 ft of homes or roads enclosed or screened, and rooftop equipment screened on all sides, § 402.C and .H

  • ERP must ensure responder training; no funding, § 402.G

  • Annual fire safety inspections; no third-party electrical inspection, § 402.G

  • Decommissioning plan with removal within 18 months; no financial security, § 402.J

  • Quarterly water withdrawal and monitoring reports, § 402.E.10

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial district