Palmer Township

Neutral Data Center Policies

Palmer Township allows data centers by right in designated districts, but they must meet noise limits and sound-testing requirements.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Palmer Township
The rules were added by Ordinance No. 2025-493, which the Supervisors adopted on August 4, 2025.Palmer Township, Northampton County — data-center ordinance (No. 2025-493)

What this means

The measure allows data centers by right in designated districts, subject to noise limits and sound testing. The clearer approval route offers a modest benefit, but it does not remove the remaining site and operating conditions.

Restrictions & requirementsHide restrictions & requirements16
  • Permitted by right in NEB (special exception in IOC), § 190-989.A and § 190-411.B

  • Campus master plan with phases; only major modifications need new approval, § 190-989.N to Q

  • § 190-510 applies (62 dBA day, 57 dBA night at homes), § 190-989.C

  • Impulsive sound limited to 20 dBA over ambient, § 190-510.C

  • Generator testing exempt from sound limits, § 190-989.C

  • Assessment of water consumption and capacity required, § 190-989.F(1)

  • Projected water consumption assessed, § 190-989.F(1)

  • Intense heat must be imperceptible beyond lot lines, § 190-989.K(3)

  • Will-serve letter or capacity assessment; no electrical inspection, § 190-989.F(1)

  • On-site generation needs Fire Commissioner approval and safety plan, § 190-989.M

  • Section 190-989.F(1) and (2) require a will-serve letter or a professional assessment of electrical, water, and sewer consumption and, where capacity is not sufficient, system improvements at the applicant's expense, but no estimated upgrade cost, tariff terms, or executed service agreement before a zoning permit is required.

  • § 190-513 shielding applies; 30-ft fixture height, § 190-989.J

  • Fire Commissioner approval of access and suppression; generation safety plan recertified yearly, § 190-989.H and M

  • Annual Fire Commissioner inspection of on-site generation, § 190-989.M

  • Secondary emergency access required, § 190-989.H

  • Construction hours 7 a.m. to 10 p.m. Monday to Saturday; no haul routes or bond, § 190-989.L

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Permitted by right in the NEB District; special exception in the IOC District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data