Orange Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Orange Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Orange Township
The draft, numbered Ordinance No. 2026-___ and not yet adopted, is posted on the township website, the Supervisors listed a public hearing on the data ordinance on October 1, 2026, and the Columbia County Planning Commission listed the draft as under its review on its October 20, 2026 agenda, with no adoption vote yet recorded.Orange Township, Columbia County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements33
  • Conditional use heard and decided by the Supervisors; approval expires if permits are not obtained within 12 months, Section 7 and 7.C

  • Section 4.C.1.c sets all Data Centers and Data Center Accessory Uses back 1,000 feet from any Sensitive Receptor property line, and Sensitive Receptors include residences while accessory uses include generators and cooling equipment.

  • Environmental Impact Assessment covering riparian buffers, wetlands, and steep slopes, Section 4.I.4.g

  • Section 4.N requires a new conditional use approval for any expansion, change in capacity or cooling technology, increase in water or energy demand, or added accessory infrastructure, but it does not exempt like-for-like replacement.

  • 60 dBA day and 55 dBA night at the use property line (45 dBA at night at Sensitive Receptors), Section 4.D.1

  • 60 dBC day and 55 dBC night at the property line, 45 dBC at night at Sensitive Receptors, Section 4.D.1

  • Section 4.D.1.a to c require preliminary, interim, and as-built sound studies using ANSI S1.4-2014 meters, but the as-built study is not required to be taken at full operating load.

  • Generator testing as required by industry standards is permitted, with no hours limit, Section 4.D.2

  • Vibration study showing no perceptible vibration beyond the property line, Section 4.E.3.

  • Water feasibility study with long-term safe yield and use of existing waterlines first; no pump test or well bar, Section 4.H.2 and H.5

  • Best available closed-loop systems required only to the extent feasible; evaporative cooling not restricted, Section 4.H.6

  • Projected water needs disclosed; no cap, reporting, or drought plan, Section 4.H.1 and H.2.a

  • Section 4.H.7 requires the applicant to show that disposal of cooling and industrial wastewater has been provided for and approved by the Sewage Enforcement Officer, Municipal Authority, SRBC, or DEP, but the approval is not required before the zoning permit.

  • Stormwater management plan required within the impact assessment, Section 4.I.4.g.iii

  • On-site generation must use Tier 4 or greater generators; no annual emissions testing, Section 5.A.5

  • Heat may not be perceptible at the property line and heat islands must be disclosed; no reuse review, Sections 4.E.1 and 4.I.4.f

  • Decommissioning plan addresses removal of electronic waste, batteries, and refrigerants; recycling not required, Section 4.P.6 and P.7

  • Utility capacity certification and a third-party electrical inspection before occupancy, Section 5.A.3 and A.4

  • Section 5.A.3.e requires the applicant to show that existing infrastructure is sufficient and to pay the full cost of any needed upgrades, but it does not require the required upgrades to be identified or disclosed.

  • Vegetative buffer around the entire perimeter within 50 ft of the fence; no minimum width, Section 4.J

  • Facility screened by perimeter vegetative buffering; no equipment height or acoustic standard, Section 4.J

  • Line-of-sight placement goal only; no visual study or renderings, Section 4.A.2

  • Emergency Response Plan accepted by the fire department, with radio coverage and 24-hour contact signs; no annual updates, Section 4.G

  • Types and storage duration of materials disclosed; no storage setbacks for data centers, Section 4.I.4.a

  • Third-party electrical inspection before occupancy; annual fire inspections apply only to battery storage, Sections 5.A.4 and 6.J.12

  • Section 4.I.1 requires a traffic impact analysis in every case covering construction and operation, but the study area is a fixed one-half-mile radius rather than reaching the nearest arterial or interchange the trucks will use.

  • Construction traffic analyzed but no work hours, haul routes, or road bond, Section 4.I.1.c

  • Section 4.P.2 to P.4 require 110% financial security and removal within 6 months of abandonment, but the ordinance does not require a recorded agreement and lets facilities with an ongoing purpose remain without a 2-year lawful reuse limit.

  • Section 4.P.5 requires cost estimates after the first year of operation and every fifth year, and states that the financial security shall be updated every five years.

  • Section 2 defines a Data Center to include cryptocurrency mining and artificial intelligence, and excludes computers secondary to another permitted use such as office servers, but that exclusion states no size or power threshold.

  • One as-built sound study after occupancy, Section 4.D.1.c

  • Noise limit exceedance treated as a violation of the ordinance, Section 4.D.1.c

  • Township may retain an independent hydrologist and noise expert; applicant pays for noise review only after a violation, Sections 4.D.3 and 4.H.2

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the DEV District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data